Tenders & Notice Archive
| S.No | Language | Tender No | Issuing Authority | Particulars | Start Date Time | Last Date Time | Document |
|---|---|---|---|---|---|---|---|
| 1 | English | PVVNL-MT/MM/B.Plan/01(s)/2026-27 | Material Management | Supply & Erection of various material for Energization of 11KV Capacitor Banks at different 33 KV substation under PVNNL |
2026-04-02 | 2026-04-21 | Download (Language - Hindi and English) |
| 2 | English | 36/EDC/GZB/2025-26 | EDC GZB | Carrying out the various work under full deposit scheme |
2026-03-31 | 2026-04-15 | Download (Language - Hindi and English) |
| 3 | English | 26/EUDC-I/N/2025-26 | EUDC-I NOIDA | Installation of new transformers, feeder bifurcation, replacement of overhead ACSR 'Rabbit' conductors with AB cables, and construction of a new 11 kV line. |
2026-03-19 | 2026-04-18 | Download (Language - Hindi and English) |
| 4 | English | 49-55/W/EDC/H/2025-26 | EDC HAPUR | Under the Business Plan for 2025тАУ26, the scope of work encompasses tasks related to 11 kV and 33 kV cabling, the 33 kV switchyard, and protection systems. Specifically, this involves removing damaged mechanical earth fault and overcurrent relays from 11/33 kV Vacuum Circuit Breakers (VCBs), procuring and installing new digital relays on the control panels, and establishing the necessary wiring to ensure the proper functioning of the tripping mechanism.(The date for tender no 49,and 55 is extended) |
2026-03-11 | 2026-04-20 | Download (Language - Hindi and English) |
| 5 | English | 21/EDC-I/MZN/2025-26 | EDC-I MZN | Carrying out the various work under full deposit scheme(The date for tender no 21 is Re-Tender) |
2026-02-07 | 2026-04-20 | Download (Language - Hindi and English) |
| 6 | English | 20-21/EUDC/MBD/25-26 | EUDC MBD | Work involving the rectification of faults and breakdowns in 11/33 kV underground cables within the coverage area of тАЛтАЛthe 11/33 kV and LT line network, utilizing a trolley-mounted cable fault locator machine. |
2026-03-16 | 2026-04-02 | Download (Language - Hindi and English) |
| 7 | English | 18-19/EUDC/MBD/25-26 | EUDC MBD | Carriage of faulty/damaged distribution transformers of various medium-range capacities within the 11 kV and LT line network area; repair of damaged poles; repair of dilapidated plinths/fencing; and line guarding works, etc. |
2026-03-12 | 2026-03-27 | Download (Language - Hindi and English) |
| 8 | English | 08-09/W/2025-26 | EUDC-III GZB | Carrying out various work under Repair work for 33 kV VCB and CR panels, and repair work for 11 kV indoor panels. |
2026-03-12 | 2026-04-03 | Download (Language - Hindi and English) |
| 9 | English | 59-60/EDC-II/SRE/2025-26 | EDC-II SRE | Carrying out the various work under full deposit scheme. |
2026-03-16 | 2026-03-30 | Download (Language - Hindi and English) |
| 10 | English | 32/EDC/GZB/2025-26 | EDC GZB | Under the work of reconstruction/repair of lines damaged in storm, Repairing 11kv line and reinforcement of 33 KV line etc.(The date for tender no 32 is extended) |
2026-03-05 | 2026-03-25 | Download (Language - Hindi and English) |
| 11 | English | 59-60/EDC-I/SRE/2025-26 | EDC-I SRE | Under the work of reconstruction/repair of lines damaged in storm, maintenance/repair work of 33 KV line coming from 132 KV substation etc. |
2026-02-28 | 2026-03-16 | Download (Language - Hindi and English) |
| 12 | English | 56-58/EDC-II/SRE/2025-26 | EDC-II SRE | Carrying out the various work under full deposit scheme.(The date for tender no 56 is extended) |
2026-02-25 | 2026-03-18 | Download (Language - Hindi and English) |
| 13 | English | 31/EDC/GZB/2025-26 | EDC GZB | Carrying out the various work under full deposit scheme. work of repairing of line pole |
2026-02-26 | 2026-03-13 | Download (Language - Hindi and English) |
| 14 | English | PVVNL/MT/IT/BMS/04/25-26 | PVVNL MRT RAPDRP | RFP for selection of an Agency for One Year On-site 24x7x365 Facility Management Support and Comprehensive Annual Maintenance contract of Disaster Recovery CenterтАЩs Architectural Infrastructure established at Sector-58, Noida |
2026-02-24 | 2026-03-10 | Download (Language - Hindi and English) |
| 15 | English | 6950/PVVNL-MT/TIPA/2025-26 | Material Management | Regarding offer for Empanelment of Third Party Inspection Agency on rate contract basis for site inspection work for quality and quantity of different Electrical Works under PVVNL, Meerut (with PQR Corrigendum) (with Date extension) |
2026-02-20 | 2026-03-16 | Download (Language - Hindi and English) |
| 16 | English | 55/EDC-I/SRE/2025-26 | EDC-I SRE | Carrying out various work under full deposit scheme at various places. |
2026-02-07 | 2026-03-11 | Download (Language - Hindi and English) |
| 17 | English | 47-53/EDC-I/SRE/2025-26 | EDC-I SRE | Carrying out various work under the full deposit scheme at various places of Repairing 11kv line and reinforcement of 33 KV line etc.(The date for tender no 50 is extended) |
2025-12-19 | 2026-02-23 | Download (Language - Hindi and English) |
| 18 | English | 07-10/EUDC-I/N/2025-26 | EUDC-I NOIDA | The work involves rectifying 11/33 kV underground cable faults using external cable fault location equipment and providing a maintenance gang with two mobile vans available 24/7.(The date for tender no 10 is extended) |
2026-01-21 | 2026-03-19 | Download (Language - Hindi and English) |
| 19 | English | 54/EDC-I/SRE/2025-26 | EDC-I SRE | Construction and bifurcation work of 11 kV lines, replacement of dilapidated wires, GI wires and poles, guarding/extension of LT lines, and other works to be carried out for the safety of transformers. |
2026-02-03 | 2026-02-13 | Download (Language - Hindi and English) |
| 20 | English | 29-30/EDC/GZB/2025-26 | EDC GZB | Carrying out various work under full deposit scheme at various places. Repairing 11kv line and reinforcement of 33 KV line etc.(Re-Tender TN 30) |
2026-01-31 | 2026-03-31 | Download (Language - Hindi and English) |