| S.No | Language | Tender No | Issuing Authority | Particulars | Start Date Time | Last Date Time | Document |
|---|---|---|---|---|---|---|---|
| 1 | English | 1-5/EUDC-I/N/2026-27 | EUDC-I NOIDA | Carrying out the various work under Replacement of damaged 11 kV CT/PT; Replacement of ST/PCC poles; Supply and installation of coolers for Power Transformers; Refilling of fire extinguishers; and Construction of 11 kV lines for connection releases. |
2026-04-20 | 2026-05-20 | Download (Language - Hindi and English) |
| 2 | English | 01/EDC/GZB/2026-27 | EDC GZB | The task of providing safety helmets, medical kits, fire extinguishers, water/sand buckets, battery-operated torches, etc., to ensure the maintenance of power supply and safety protocols at various 33/11 kV electrical substations. |
2026-04-22 | 2026-05-06 | Download (Language - Hindi and English) |
| 3 | English | 01-07/W/EDC/H/2026-27 | EDC HAPUR | Carrying out the various work under related to the rectification of faults occurring in 11 kV and 33 kV underground cables, including the localization of such faults using a fault locator machine. |
2026-04-17 | 2026-05-04 | Download (Language - Hindi and English) |
| 4 | English | 1-2/EUDC/MBD/26-27 | EUDC MBD | Carrying out various work under Maintenance Work for 33 kV and 11 kV VCBs |
2026-04-13 | 2026-04-30 | Download (Language - Hindi and English) |
| 5 | English | PVVNL-MT/MM/B.Plan/01(s)/2026-27 | Material Management | Supply & Erection of various material for Energization of 11KV Capacitor Banks at different 33 KV substation under PVNNL |
2026-04-02 | 2026-04-21 | Download (Language - Hindi and English) |
| 6 | English | 36/EDC/GZB/2025-26 | EDC GZB | Carrying out the various work under full deposit scheme |
2026-03-31 | 2026-04-15 | Download (Language - Hindi and English) |
| 7 | English | PVVNL/MT/COM-01-02/2026-27 | PVVNL COMM | MRI BILLING WORK OF 10KV AND ABOVE CONSUMERS UNDER PVVNL MEERUT |
2026-04-02 | 2026-04-27 | Download (Language - Hindi and English) |
| 8 | English | 26/EUDC-I/N/2025-26 | EUDC-I NOIDA | Installation of new transformers, feeder bifurcation, replacement of overhead ACSR 'Rabbit' conductors with AB cables, and construction of a new 11 kV line. |
2026-03-19 | 2026-04-18 | Download (Language - Hindi and English) |
| 9 | English | 49-55/W/EDC/H/2025-26 | EDC HAPUR | Under the Business Plan for 2025–26, the scope of work encompasses tasks related to 11 kV and 33 kV cabling, the 33 kV switchyard, and protection systems. Specifically, this involves removing damaged mechanical earth fault and overcurrent relays from 11/33 kV Vacuum Circuit Breakers (VCBs), procuring and installing new digital relays on the control panels, and establishing the necessary wiring to ensure the proper functioning of the tripping mechanism.(The date for tender no 49,and 55 is extended) |
2026-03-11 | 2026-05-04 | Download (Language - Hindi and English) |
| 10 | English | 21/EDC-I/MZN/2025-26 | EDC-I MZN | Carrying out the various work under full deposit scheme(The date for tender no 21 is Re-Tender) |
2026-02-07 | 2026-04-20 | Download (Language - Hindi and English) |
| 11 | English | 20-21/EUDC/MBD/25-26 | EUDC MBD | Work involving the rectification of faults and breakdowns in 11/33 kV underground cables within the coverage area of the 11/33 kV and LT line network, utilizing a trolley-mounted cable fault locator machine. |
2026-03-16 | 2026-04-02 | Download (Language - Hindi and English) |
| 12 | English | 18-19/EUDC/MBD/25-26 | EUDC MBD | Carriage of faulty/damaged distribution transformers of various medium-range capacities within the 11 kV and LT line network area; repair of damaged poles; repair of dilapidated plinths/fencing; and line guarding works, etc. |
2026-03-12 | 2026-03-27 | Download (Language - Hindi and English) |
| 13 | English | 08-09/W/2025-26 | EUDC-III GZB | Carrying out various work under Repair work for 33 kV VCB and CR panels, and repair work for 11 kV indoor panels. |
2026-03-12 | 2026-04-03 | Download (Language - Hindi and English) |
| 14 | English | 59-60/EDC-II/SRE/2025-26 | EDC-II SRE | Carrying out the various work under full deposit scheme. |
2026-03-16 | 2026-03-30 | Download (Language - Hindi and English) |
| 15 | English | 32/EDC/GZB/2025-26 | EDC GZB | Under the work of reconstruction/repair of lines damaged in storm, Repairing 11kv line and reinforcement of 33 KV line etc.(The date for tender no 32 is extended) |
2026-03-05 | 2026-03-25 | Download (Language - Hindi and English) |
| 16 | English | 59-60/EDC-I/SRE/2025-26 | EDC-I SRE | Under the work of reconstruction/repair of lines damaged in storm, maintenance/repair work of 33 KV line coming from 132 KV substation etc. |
2026-02-28 | 2026-03-16 | Download (Language - Hindi and English) |
| 17 | English | 56-58/EDC-II/SRE/2025-26 | EDC-II SRE | Carrying out the various work under full deposit scheme.(The date for tender no 56 is extended) |
2026-02-25 | 2026-03-18 | Download (Language - Hindi and English) |
| 18 | English | 31/EDC/GZB/2025-26 | EDC GZB | Carrying out the various work under full deposit scheme. work of repairing of line pole |
2026-02-26 | 2026-03-13 | Download (Language - Hindi and English) |
| 19 | English | 56-58/EDC-I/SRE/2025-26 | EDC-I SRE | Carrying out the various work under full deposit scheme. work of repairing of broken/rusted ST pole, Replacement of old/dirty t/f oil and onsite maintenance of damaged t/f at various places(The date for tender no 58 is extended) |
2026-02-25 | 2026-04-30 | Download (Language - Hindi and English) |
| 20 | English | PVVNL/MT/IT/BMS/04/25-26 | PVVNL MRT RAPDRP | RFP for selection of an Agency for One Year On-site 24x7x365 Facility Management Support and Comprehensive Annual Maintenance contract of Disaster Recovery Center’s Architectural Infrastructure established at Sector-58, Noida |
2026-02-24 | 2026-03-10 | Download (Language - Hindi and English) |