Tenders & Notice Archive
| S.No | Language | Tender No | Issuing Authority | Particulars | Start Date Time | Last Date Time | Document |
|---|---|---|---|---|---|---|---|
| 1 | English | 61-62/EDC-II/SRE/2025-26 | EDC-II SRE | Work under the running contract involving the arrest of oil leaks in MVA power transformers, oil centrifuging of Power Transformer No. 1 (10 MVA), and the replacement of damaged XLPE cables installed on feeders.(Re-Tender TN 061) |
2026-03-18 | 2026-05-23 | Download (Language - Hindi and English) |
| 2 | English | 59-60/EDC-II/SRE/2025-26 | EDC-II SRE | Carrying out the various work under full deposit scheme. |
2026-03-16 | 2026-03-30 | Download (Language - Hindi and English) |
| 3 | English | 15-25/EUDC-I/N/2025-26 | EUDC-I NOIDA | Replacement of damaged pole repair of damaged plinths of 11 kv medium-capacity transformers; replacement of damaged distribution transformers within the RAPDRP area and line construction and line/pole shifting works.(The date for tender no 16,18, date 11.05.2026 and 15,19, is extended) |
2026-03-07 | 2026-05-13 | Download (Language - Hindi and English) |
| 4 | English | 12-14/EUDC-I/N/2025-26 | EUDC-I NOIDA | Work of replacing damaged poles (11 kV / 33 kV) AND work of replacing damaged distribution transformers in RAPDRP/IPDS towns.(The date for tender no 12,13 and 14 tender date 11.05.2026 is extended) |
2026-02-27 | 2026-05-13 | Download (Language - Hindi and English) |
| 5 | English | 11/EUDC-I/N/2025-26 | EUDC-I NOIDA | Work related to strengthening of 33/11 KV sub-stations and protection of distribution transformers.(The date for tender no 11 is extended) |
2026-02-23 | 2026-05-13 | Download (Language - Hindi and English) |
| 6 | English | 32/EDC/GZB/2025-26 | EDC GZB | Under the work of reconstruction/repair of lines damaged in storm, Repairing 11kv line and reinforcement of 33 KV line etc.(The date for tender no 32 is extended) |
2026-03-05 | 2026-03-25 | Download (Language - Hindi and English) |
| 7 | English | 59-60/EDC-I/SRE/2025-26 | EDC-I SRE | Under the work of reconstruction/repair of lines damaged in storm, maintenance/repair work of 33 KV line coming from 132 KV substation etc. |
2026-02-28 | 2026-03-16 | Download (Language - Hindi and English) |
| 8 | English | 56-58/EDC-II/SRE/2025-26 | EDC-II SRE | Carrying out the various work under full deposit scheme.(The date for tender no 56 is extended) |
2026-02-25 | 2026-03-18 | Download (Language - Hindi and English) |
| 9 | English | 31/EDC/GZB/2025-26 | EDC GZB | Carrying out the various work under full deposit scheme. work of repairing of line pole |
2026-02-26 | 2026-03-13 | Download (Language - Hindi and English) |
| 10 | English | 56-58/EDC-I/SRE/2025-26 | EDC-I SRE | Carrying out the various work under full deposit scheme. work of repairing of broken/rusted ST pole, Replacement of old/dirty t/f oil and onsite maintenance of damaged t/f at various places(The date for tender no 58 is extended) |
2026-02-25 | 2026-04-30 | Download (Language - Hindi and English) |
| 11 | English | PVVNL/MT/IT/BMS/04/25-26 | PVVNL MRT RAPDRP | RFP for selection of an Agency for One Year On-site 24x7x365 Facility Management Support and Comprehensive Annual Maintenance contract of Disaster Recovery Center’s Architectural Infrastructure established at Sector-58, Noida |
2026-02-24 | 2026-03-10 | Download (Language - Hindi and English) |
| 12 | English | 6950/PVVNL-MT/TIPA/2025-26 | Material Management | Regarding offer for Empanelment of Third Party Inspection Agency on rate contract basis for site inspection work for quality and quantity of different Electrical Works under PVVNL, Meerut (with PQR Corrigendum) (with Date extension) |
2026-02-20 | 2026-03-16 | Download (Language - Hindi and English) |
| 13 | English | 55/EDC-I/SRE/2025-26 | EDC-I SRE | Carrying out various work under full deposit scheme at various places. |
2026-02-07 | 2026-03-11 | Download (Language - Hindi and English) |
| 14 | English | 47-53/EDC-I/SRE/2025-26 | EDC-I SRE | Carrying out various work under the full deposit scheme at various places of Repairing 11kv line and reinforcement of 33 KV line etc.(The date for tender no 50 is extended) |
2025-12-19 | 2026-02-23 | Download (Language - Hindi and English) |
| 15 | English | 07-10/EUDC-I/N/2025-26 | EUDC-I NOIDA | The work involves rectifying 11/33 kV underground cable faults using external cable fault location equipment and providing a maintenance gang with two mobile vans available 24/7.(The date for tender no 10 is extended) |
2026-01-21 | 2026-03-19 | Download (Language - Hindi and English) |
| 16 | English | 54/EDC-I/SRE/2025-26 | EDC-I SRE | Construction and bifurcation work of 11 kV lines, replacement of dilapidated wires, GI wires and poles, guarding/extension of LT lines, and other works to be carried out for the safety of transformers. |
2026-02-03 | 2026-02-13 | Download (Language - Hindi and English) |
| 17 | English | 29-30/EDC/GZB/2025-26 | EDC GZB | Carrying out various work under full deposit scheme at various places. Repairing 11kv line and reinforcement of 33 KV line etc.(Re-Tender TN 30) |
2026-01-31 | 2026-03-31 | Download (Language - Hindi and English) |
| 18 | English | 04-05/W/2025-26 | EUDC-III GZB | Carrying out various work under fault location and repair work, etc. |
2026-01-20 | 2026-02-09 | Download (Language - Hindi and English) |
| 19 | English | 17/EUDC/MBD/25-26 | EUDC MBD | The work involves the construction of new LT/11 kV and 33 kV lines and the release of new electricity connections and load augmentation (ranging tender) under the deposit scheme in the 11 kV and LT line network area of Moradabad. |
2026-01-20 | 2026-02-05 | Download (Language - Hindi and English) |
| 20 | English | 28/EDC/GZB/2025-26 | EDC GZB | Carrying out various work under full deposit scheme at various places. |
2026-01-22 | 2026-02-05 | Download (Language - Hindi and English) |


