| S.No | Language | Tender No | Issuing Authority | Particulars | Start Date Time | Last Date Time | Document |
|---|---|---|---|---|---|---|---|
| 1 | English | 05/EDC-I/SRE/2026-27 | EDC-I SRE | Carrying out the various Work of Relocating Vacant Poles of the 33 kV Line(The date for tender no 05 is extended) |
2026-05-11 | 2026-05-25 | Download (Language - Hindi and English) |
| 2 | English | 01-03/EDC-I/MZN/2026-27 | EDC-I MZN | Carrying out the various work under full deposit scheme 33/11 KV sub-stations under for works Damaged Single pole / double pole of 33 KV lines, 11 KV lines and LT lines, replacement/Long Span pole, replacement of damaged cable jointing kit, replacement of damaged cable, straightening of electric poles, elevation of loose lines & etc. Work to be done running contract through an external agency.(The date for tender no 01,02, and 03 is extended) |
2026-05-16 | 2026-05-23 | Download (Language - Hindi and English) |
| 3 | English | 01/W/EDC/H/2026-27 | EDC HAPUR | Carrying out the various work under related to the rectification of faults occurring in 11 kV underground cables, including the localization of such faults using a fault locator machine.(Re-Tender TN 01) |
2026-05-14 | 2026-05-22 | Download (Language - Hindi and English) |
| 4 | English | 11-15/W/EDC/H/2026-27 | EDC HAPUR | FOR PROVIDING VEHICLES ALONGWITH DRIVERS & FUEL FOR OFFICIAL/NIGAMIY WORK OF , ELECTRICITY DISTRIBUTION DIVISION, HAPUR AND ALL SUBORDINATE SUB-DIVISIONAL OFFICERS FOR THE PERIOD OF 10 MONTHS DURING FINANCIAL YEAR 2026-27 (FROM 01.06.2026 TO 31.03.2027) WITHIN THE JURISDICTION OF ELECTRICITY DISTRIBUTION DIVISION HAPUR, UNDER EDC HAPUR. |
2026-05-12 | 2026-05-22 | Download (Language - Hindi and English) |
| 5 | English | 10/W/EDC/H/2026-27 | EDC HAPUR | A new independent feeder from the 33/11 kV Upaida Power Substation to increase the load of the electrical connection from 17 kVA to 300 kVA. |
2026-05-05 | 2026-05-20 | Download (Language - Hindi and English) |
| 6 | English | 01-05/EUDC-I/N/2026-27 | EUDC-I NOIDA | Carrying out the various work under Replacement of damaged 11 kV CT/PT; Replacement of ST/PCC poles; Supply and installation of coolers for Power Transformers; Refilling of fire extinguishers; and Construction of 11 kV lines for connection releases. |
2026-04-20 | 2026-05-20 | Download (Language - Hindi and English) |
| 7 | English | 1-5/EUDC-I/N/2026-27 | EUDC-I NOIDA | Carrying out the various work under Replacement of damaged 11 kV CT/PT; Replacement of ST/PCC poles; Supply and installation of coolers for Power Transformers; Refilling of fire extinguishers; and Construction of 11 kV lines for connection releases. |
2026-04-20 | 2026-05-20 | Download (Language - Hindi and English) |
| 8 | English | 01/EDC/GZB/2026-27 | EDC GZB | The task of providing safety helmets, medical kits, fire extinguishers, water/sand buckets, battery-operated torches, etc., to ensure the maintenance of power supply and safety protocols at various 33/11 kV electrical substations. |
2026-04-22 | 2026-05-06 | Download (Language - Hindi and English) |
| 9 | English | 01-07/W/EDC/H/2026-27 | EDC HAPUR | Carrying out the various work under related to the rectification of faults occurring in 11 kV and 33 kV underground cables, including the localization of such faults using a fault locator machine.(The date for tender no 02,03 and 04 is extended) |
2026-04-17 | 2026-05-25 | Download (Language - Hindi and English) |
| 10 | English | 1-2/EUDC/MBD/26-27 | EUDC MBD | Carrying out various work under Maintenance Work for 33 kV and 11 kV VCBs |
2026-04-13 | 2026-04-30 | Download (Language - Hindi and English) |
| 11 | English | 1-3/EDC-II/SRE/2026-27 | EDC-II SRE | Carrying out the various work under full deposit scheme A running contract for the testing of power transformers installed at 33/11 kV electrical substations, the repair of damaged relays through the replacement of parts, and the replacement of damaged transformers of various capacities.(The date for tender no 03 is extended) |
2026-04-15 | 2026-05-20 | Download (Language - Hindi and English) |
| 12 | English | PVVNL-MT/MM/B.Plan/01(s)/2026-27 | Material Management | Supply & Erection of various material for Energization of 11KV Capacitor Banks at different 33 KV substation under PVNNL |
2026-04-02 | 2026-04-21 | Download (Language - Hindi and English) |
| 13 | English | 36/EDC/GZB/2025-26 | EDC GZB | Carrying out the various work under full deposit scheme |
2026-03-31 | 2026-04-15 | Download (Language - Hindi and English) |
| 14 | English | PVVNL/MT/COM-01-02/2026-27 | PVVNL COMM | MRI BILLING WORK OF 10KV AND ABOVE CONSUMERS UNDER PVVNL MEERUT |
2026-04-02 | 2026-04-27 | Download (Language - Hindi and English) |
| 15 | English | 26/EUDC-I/N/2025-26 | EUDC-I NOIDA | Installation of new transformers, feeder bifurcation, replacement of overhead ACSR 'Rabbit' conductors with AB cables, and construction of a new 11 kV line. |
2026-03-19 | 2026-04-18 | Download (Language - Hindi and English) |
| 16 | English | 49-55/W/EDC/H/2025-26 | EDC HAPUR | Under the Business Plan for 2025–26, the scope of work encompasses tasks related to 11 kV and 33 kV cabling, the 33 kV switchyard, and protection systems. Specifically, this involves removing damaged mechanical earth fault and overcurrent relays from 11/33 kV Vacuum Circuit Breakers (VCBs), procuring and installing new digital relays on the control panels, and establishing the necessary wiring to ensure the proper functioning of the tripping mechanism.(The date for tender no 49,and 55 is extended) |
2026-03-11 | 2026-05-04 | Download (Language - Hindi and English) |
| 17 | English | 21/EDC-I/MZN/2025-26 | EDC-I MZN | Carrying out the various work under full deposit scheme(The date for tender no 21 is Re-Tender) |
2026-02-07 | 2026-04-20 | Download (Language - Hindi and English) |
| 18 | English | 20-21/EUDC/MBD/25-26 | EUDC MBD | Work involving the rectification of faults and breakdowns in 11/33 kV underground cables within the coverage area of the 11/33 kV and LT line network, utilizing a trolley-mounted cable fault locator machine. |
2026-03-16 | 2026-04-02 | Download (Language - Hindi and English) |
| 19 | English | 18-19/EUDC/MBD/25-26 | EUDC MBD | Carriage of faulty/damaged distribution transformers of various medium-range capacities within the 11 kV and LT line network area; repair of damaged poles; repair of dilapidated plinths/fencing; and line guarding works, etc. |
2026-03-12 | 2026-03-27 | Download (Language - Hindi and English) |
| 20 | English | 08-09/W/2025-26 | EUDC-III GZB | Carrying out various work under Repair work for 33 kV VCB and CR panels, and repair work for 11 kV indoor panels. |