| 1 |
English |
27/W/ EDC/GZB/2020-21 |
EDC GZB
|
Work of increase capacity and replacement of damaged control panel etc. |
0000-00-00 |
0000-00-00 |
Download (Language - Hindi and English) |
| 2 |
English |
28/W/ EDC/GZB/2020-21 |
EDC GZB
|
Work of increase capacity and replacement of damaged control panel etc. in business plan 2020-21. |
0000-00-00 |
0000-00-00 |
Download (Language - Hindi and English) |
| 3 |
English |
PVVNL-MT/MM/23/ 2020-21 |
Material Management
|
Work of Supply & installation of 115 Nos. 1.98 MVAR & 96 Nos. 3.96 MVAR capacity, capacitor bank with all accessories on turnkey basis and its annual maintenance for 10 years. (Tenders are accepted Through E-Tendering) |
0000-00-00 |
0000-00-00 |
Download (Language - Hindi and English) |
| 4 |
English |
29(s)/ECDD/M/2020-21 |
ECDD MRT
|
Door to door garbage collection on daily bases from officers/staff residences of Hydel Colony Victoria Park Meerut. |
0000-00-00 |
0000-00-00 |
Download (Language - Hindi and English) |
| 5 |
English |
21/W/2020-21 |
EUDC-II GZB
|
Carrying out the work of locating & pin pointing the 33KV/11KV underground cables fault by fault locator machine etc. |
0000-00-00 |
0000-00-00 |
Download (Language - Hindi and English) |
| 6 |
English |
PVVNL-MT/MM/08/ 2020-21 |
Material Management
|
Supply of 2400 KL, Fresh Transformer Oil. (Tenders are accepted Through E-Tendering) |
0000-00-00 |
0000-00-00 |
Download (Language - Hindi and English) |
| 7 |
English |
21-22/2020-21 |
EDC RAMPUR
|
Carrying out the various works in deposit scheme and releasing connection at various place. (Tender no 21 is CANCELLED) |
0000-00-00 |
0000-00-00 |
Download (Language - Hindi and English) |
| 8 |
English |
23/2020-21 |
EDC RAMPUR
|
Providing office furniture for newly created office. |
0000-00-00 |
0000-00-00 |
Download (Language - Hindi and English) |
| 9 |
English |
34/W/2020-21 |
EDC LONI
|
Construction of line for releasing new connection in deposit scheme. |
0000-00-00 |
0000-00-00 |
Download (Language - Hindi and English) |
| 10 |
English |
80-85/2020-21 |
EDC-I MZN
|
Replacement of damaged CT/PT unit & line wire and releasing new connection etc. at various place. |
0000-00-00 |
0000-00-00 |
Download (Language - Hindi and English) |
| 11 |
English |
61/W/EDC-II/SRE/2020-21 |
EDC-II SRE
|
Supply of material for VCB. |
0000-00-00 |
0000-00-00 |
Download (Language - Hindi and English) |
| 12 |
English |
36/W/2020-21 |
EUDC-III GZB
|
Providing light diesel vehicle with driver. |
0000-00-00 |
0000-00-00 |
Download (Language - Hindi and English) |
| 13 |
English |
23-24/W/EDC/H/2020-21 |
EDC HAPUR
|
Replacement of damaged VCB and repairing & overhauling of 11 KV VCB at various place. (Re-Tender TN-23 to 30.11.2020) |
0000-00-00 |
0000-00-00 |
Download (Language - Hindi and English) |
| 14 |
English |
04-07/W/EUDC/SRE/2020-21 |
EUDC SRE
|
Carrying out the various works deposit scheme against passed estimate and cutting & chopping tree branches at various place. |
0000-00-00 |
0000-00-00 |
Download (Language - Hindi and English) |
| 15 |
English |
79-86/W/2020-21 |
EDC-I SRE
|
Increase the capacity of t/f and carrying out the various work etc. at various place. (Date for tender no 82 is extended to 20.11.2020) |
0000-00-00 |
0000-00-00 |
Download (Language - Hindi and English) |
| 16 |
English |
39-40/EDC-I/B/20-21 |
EDC-I BSR
|
Increase the capacity of t/f and releasing connection at various place. |
0000-00-00 |
0000-00-00 |
Download (Language - Hindi and English) |
| 17 |
English |
26/2020-21 |
EDC BIJNOR
|
Releasing new connection in saubhagya yojana. |
0000-00-00 |
0000-00-00 |
Download (Language - Hindi and English) |
| 18 |
English |
34/2020-21 |
EDC SHAMLI
|
Carrying out the various works against passed linkage/package. |
0000-00-00 |
0000-00-00 |
Download (Language - Hindi and English) |
| 19 |
English |
30/ECDD/M/2020-21 |
ECDD MRT
|
Civil work for renovation of existing departmental residences for conversion into office of AE (Meter) EUTD Meerut. |
0000-00-00 |
0000-00-00 |
Download (Language - Hindi and English) |
| 20 |
English |
PVVNL-MT/MM/25(vs)/ 2020-21 |
Material Management
|
Supply of 50000 Nos. universal meter box for different makes of meters already installed. (Tenders are accepted Through E-Tendering) |
0000-00-00 |
0000-00-00 |
Download (Language - Hindi and English) |