You are at >> APDRP

Search
 

Accelerated Power Development & Reform Programme (APDRP)

n                 APDRP i.e Accelerated Power Development & Reform Programme was started by the central Govt. to bring down the technical and commercial losses in the distribution network power system of the country. PVVNL which came into being after the unbundling of UPSEB (Uttar Pradesh State Electricity Board) in the Year 2000 without wasting any time, adopted the APDRP scheme. Initially it was started in the two district head quarters namely Moradabad & Muzaffarnagar in the year 2001 & later it was also implemented in Meerut, Ghaziabad, Noida, Saharanpur, Bulandshahr, Baghpat, Sambhal, Amroha, & Rampur. 

n                 In order to improve the financial & technical health of electrical distribution system of PVVNL, the detailed project reports were got prepared through the concerned superintending engineers. The DPRs of each circle described the Geographical coverage, Demographic data, General Outline of the existing electrical system, Revenue data, Demand data, General Outline of the existing electrical system, Revenue data, Proposed works to improve the system & to convert PVVNL into a profit making discom.

n                 For the controlling purpose, certain techno-commercial parameters e.g Energy Input, Energy Metered, Energy billed, T&D Losses, Revenue Realized, Average cost of supply (ACS), Average Revenue Realization (ARR), Gap between ARR and ACS, AT&C Losses, Productivity, Failure Rate of DTs %, No. of feeder tripping, Tripping Duration, Reliability Index of feeders, Consumer to Employee Ratio, No of Consumer Complaints, Complaints Disposal time, HT/LT Ratio & Average Power Factor at input to the circle. were selected & the bench mark of these parameters were targeted to be achieved within certain period. For the achievement of Bench Marks, an MOA was signed between M.D, PVVNL, Meerut & Joint Secy. Ministry of Power, Govt. of India. Progress on these parameters is being monitored vigilantly & the deviation, if arises, is viewed seriously to avoid its reoccurrence.

OBJECTIVES OF APDRP IN PVVNL

The APDRP scheme of all the above mentioned towns were prepared for the following works & objectives:-

  1. Preparing consumer data base along with G.I.S maps for effective Customer Relationship Management.

  2. Construction of new 33/11 KV & 11/0.433 KV Sub-station to take care the future growth of electrical load in PVVNL.

  3. Construction of New 33/11 KV & 11/0.0433 KV line to improve the HT/LT ratio of PVVNL.

  4. Construction of New L.T lines to cater the need of increasing consumer.

  5.  Replacement of bare conductors, in theft prone area, by the ABC (Ariel Bunched Cable)

  6.  Capacity Augmentation of the Existing 33/11 KV & 11/0.433 KV Sub-station to relieve the power system of PVVNL from overloading.  

  7.  Reconfiguration of LT lines to reduce the length of LT line & thereby reducing the line losses.

  8. Renovation & Modernization of existing Sub-stations & lines in PVVNL

  9.   Installation of Capacitor Bank at various Sub-station to improve the Power Factor

  10. Conversion of LT lines into HVDS (High Voltage Distribution System) in theft prone area where the adequate space or clearance is available

ORGANIZATION FOR IMPLEMENTATION OF APDRP IN PVVNL

Under the leadership of a Chief Engineer, PIME (Planning, Implementation, Monitoring & Performance Evaluation) Cell was constituted & was entrusted the following works:-                    

  1. Getting the Detailed Project Report prepared through the concerned Superintending Engineer.

  2. Submission of DPR to the competent authority for their approval.

  3. Arranging finance for counter part funding as per the requirement of the Ministry of Power, Govt. of India, for the implementation of APDRP.

  4. Floating the tenders for the execution of various works.

  5. Executing agreements with the firms.

  6. Monitoring the performance of execution of contract & its reporting to the concerned authorities.

  7. Monitoring the performance on Bench Mark Parameters of various circles  & their reporting to the concerned authorities.   

DETAILS OF TENDERS (DISTT. WISE) OF APDRP WORKS IN DIFFERENT TOWNS OF PVVNL

 MUZAFFARNAGAR (Estimated Cost.=53.43)

S.No.

Type of work

Name of Executing Firms

Amount

(Rs. In Crore)

Current Status

1.

Construction of New 33 KV S/s

M/s J.S.P. Constructions. Nehru Nagar. Ghaziabad.

14.55

Work in Progress

2.

R&M 33 KV S/s

M/s ABB, Bikaji Kama Place, New Delhi

4.28

Work in Progress

3.

Construction of New 11 KV S/s

M/s Naresh Kumar Agarwal, Ghaziabad

14.71

Work in Progress

4.

Const. Of 11 KV/LT lines. Reconductring

M/s A.T. Electricals, Ghaziabad (U.P)

14.60

Work in Progress

5.

Conversion of 66 KV System to 33 KV

M/s Alstom Limited, New Delhi

3.82

Work in Progress

6.

GIS mapping

M/s Indure Pvt. Ltd, New Delhi.

1.59

Work in Progress

 

 

Total:

53.55

 

 MEERUT (Estimated Cost.= 49.35)

S.No.

Type of work

Name of Executing Firms

Amount

(Rs. In Crore)

Current Status

1.

Construction of New 33 KV S/s

M/s Vijai Electricals Ltd. Hyderabad

10.31

Work in Progress

2.

R&M 33 KV S/s

M/s Avadh Transformer Pvt. Ltd, Lucknow

3.12

Work in Progress

3.

Construction of New 11 KV S/s

M/s A.T. Electricals. Ghaziabad

6.40

Work in Progress

4.

Const. Of 11 KV/LT lines, Reconductring

M/s Pionner Power Engineer Ltd. Lucknow

5.89

Work in Progress

5.

GIS mapping

M/s Sai Computers (P) Ltd, Meerut

3.64

Work in Progress

6.

Meters

M/s Elymer, Delhi & M/s Secur Meters, Haryana

0.52

Supply Completed

7.

Renovation of T/f workshop, Purchase of BDV   Tester & Centrifuging m/c

Departmentally

0.18

Work in Progress

8.

Mic. Civil Works

Departmentally

1.21

Work in Progress

9.

D.T.Metering

-

6.53

Work in Progress under Anti Theft Scheme

10.

Laying of ABC Cable

-

8.86

11.

Replacement of Switchgears & Capacitor Bank

Departmentally

2.33

Work in Progress

12.

Mic. Items

-

0.36

 

                                                                       Total:

49.35

 

Ghaziabad (Estimated Cost.= 62.23) 

S.No.

Type of work

Name of Executing Firms

Amount

(Rs. In Crore)

Current Status

1.

Construction of New 33 KV S/s

M/s ABB. New Delhi

8.03

Work in Progress

2.

R&M 33 KV S/s

M/s Avadh Transformer Pvt Ltd. Lucknow

9.44

Work in Progress

3.

Construction of New 11 KV S/s

M/s Jyoti Build- Tech Pvt. Ltd. New Delhi

9.76

Work in Progress

4.

Const. Of 11KV/LT lines, Reconductring

M/s ABB, New Delhi

14.07

Work in Progress

5.

GIS mapping

M/s Sai Computers (P) Ltd, Meerut

1.14

Work in Progress

6.

Establishment of Customer Care Center

-

1.0

Location being decided

7.

Mic. Civil Works

Departmentally

1.09

Under progress

8.

D.T.Metering

-

9.64

Work in Progress under Anti Theft Scheme

9.

Laying of ABC Cable

-

8.06

                                                              Total:

62.23

 

 Bulandshahr (Estimated Cost.= 20.25) 

S.No.

Type of work

Name of Executing Firms

Amount

(Rs. In Crore)

Current Status

1.

Construction of New 33 KV S/s

M/s Hythro power Corporation Ltd, New Delhi

3.26

Work in Progress

2.

R&M 33 KV S/s

M/s absolute Projects (India) Ltd. New Delhi

2.75

Work in Progress

3.

Construction of New 11 KV S/s

M/s Gupta Transformer Products, Muzaffarnagar

2.75

Work in Progress

4.

Const. Of 11 KV/LT lines. Reconductring

M/s Ashok Kumar & Co. Ghaziabad

4.56

Work in Progress

5.

GIS mapping

M/s saran Software Pvt. Ltd. Noida

0.35

Work in Progress

6.

Establishment of Customer Care Center

-

0.5

Location being decided

7.

Energy Meters

M/s Elymer, Delhi & M/s Secur Meters, Haryana

2.19

Supply Completed

8.

Mic. Civil Works

Departmentally

0.8

Under progress

9.

D.T.Metering

-

0.98

Work in Progress under Anti Theft Scheme

10.

Laying of ABC Cable

-

1.50

11.

Mic. Items

-

0.61

Material to be arranged

                                                              Total:

20.25

 

 Saharanpur (Estimated Cost.- 31.60) 

S.No.

Type of work

Name of Executing Firms

Amount

(Rs. In Crore)

Current Status

1.

Conversion of 66 KV to 33 KV

M/s Absolute Projects (India) Ltd, New Delhi

2.08

Work in Progress

2.

Construction of New 33 KV S/s

M/s J.S.P Constructions, Ghaziabad.

5.11

Work in Progress

3.

Construction of Switch room & 33 KV Bay

Departmentally

1.0

Work in Progress

4.

R&M 33 KV S/s

M/s Shreem Capacitors Pvt. Ltd,Jaysingpur

7.79

Work in Progress

5.

Construction of New 11 KV S/s

M/s Gupta Transformer Products, Muzaffarnagar.

4.40

Work in Progress

6.

Const. Of 11 KV/LT lines. Reconductring

M/s IVRCL Infrastructures & Projects Ltd. Hydrabad

6.14

Work in Progress

7.

Meters

M/s Elymer, Delhi & M/s Secur Meters, Haryana

0.13

Supply Completed

8.

Consumer Indexing & Billing through hand held m/c

Departmentally

1.81

Work in Progress

9.

Establishment of Customer Care Center

-

0.4

Location being decided

10

D.T. Metering

-

2.74

Work in Progress under Anti Theft Scheme

                                                                Total:

31.60

 

 Baghpat (Estimated Cost.= 22.97) 

S.No.

Type of work

Name of Executing Firms

Amount

(Rs. In Crore)

Current Status

1.

Construction of New 33 KV S/s

M/s J.S.P. Constructions, Ghaziabad

2.52

Work in Progress

2.

R&M 33 KV S/s

M/s R.P. Electricals. Ghaziabad

4.70

Work in Progress

3.

Construction of New 11 KV S/s

M/s Gupta Transformer Products Muzaffarnagar

5.48

Work in Progress

4.

Const. Of 11 KV/LT lines, Reconductring

M/s Satish Kumar Meerut

5.76

Work in Progress

5.

GIS mapping

M/s Saran Software Pvt. Ltd. Noida

0.25

Work in Progress

6.

Meters

M/s Elymer, Delhi & M/s Secur Meters, Haryana

1.11

Supply Completed

7.

Establishment of Customer Care Center

-

0.66

Location being decided

8.

D.T.Metering

-

0.09

Work in Progress under Anti Theft Scheme

9.

Laying of ABC Cable

-

2.23

10.

Mic. Items

-

0.17

Material to be arranged

                                                     Total:

22.97

 

 Noida (Estimated  Cost.= 65.42)

S.No.

Type of work

Name of Executing Firms

Amount

(Rs. In Crore)

Current Status

 1.

Construction of New 33 KV S/s

M/s I.L Lucknow

53.48

 

Work in Progress

2.

R&M 33 KV

3.

Construction of New 11 KV S/s

4.

11 KV line

5.

GIS mapping

M/s CE Info Systems (P) Ltd. New Delhi

1.23

Work in Progress

6.

Meters

M/s Elymer, Delhi & M/s L&T, New Delhi

5.27

Work in Progress

7.

HVDS

Departmentally

5.44

Survey in Progress

                                                                     Total:

65.42

 

Sambhal (Estimated  Cost.= 12.47)

S.No.

Type of work

Name of Executing Firms

Amount

(Rs. In Crore)

Current Status

1.1

Construction of New 33 KV S/s

M/s Pionner Power Engineer Ltd, Lucknow.

2.56

Work in Progress

2.2

Construction of S/s Building & 33 KV Bay

Departmentally

0.53

Work in Progress

3.3

R&M 33 KV S/s

M/s Ashok Kumar & Co. Ghaziabad

1.84

Work in Progress

4.

Construction of New 11 KV S/s

M/s Trans Erectors, Ghaziabad

2.03

Work in Progress

5.

Const. Of 11 KV/LT lines, Reconductring

M/s Saket Construction. New Delhi

2.92

Work in Progress

6.

GIS mapping

M/s Computronics India, Lucknow

0.29

Work in Progress

7.

Establishment of Customer Care & Complaint Center

-

0.71

Location being decided

8.

Meters

M/s Elymer, Delhi & M/s Secur Meters, Haryana

0.87

Supply completed

9.

D.T. Metering

-

0.68

Work in Progress under Anti Theft Scheme

10.

Mic. T&P

-

0.04

 

          Total:

12.47

 

Rampur (Estimated Cost.= 13.33)

S.No.

Type of work

Name of Executing Firms

Amount

(Rs. In Crore)

Current Status

1.

GIS mapping

M/s Computronics India, Lucknow

1.04

Work in Progress

2.

Construction of New 33 KV S/s

M/s Kashmiri Lal Constructions (P), Ranikhet (Uttaranchal)

0.99

Work in Progress

3.

R&M 33 KV S/s

M/s Kashmiri Lal Constructions (P), Ranikhet (Uttaranchal)

3.03

Work in Progress

4.

Construction of New 11 KV S/s

Tender under Progress

3.21

-

5.

Const. Of 11 KV/LT lines. Reconductring

M/s Kashmiri Lal Constructions (P) Ltd. (Uttaranchal)

2.62

Work in Progress

6.

Meters

M/s Elymer, Delhi & M/s Secur Meters, Haryana

1.05

Work in Progress

                                                         Total:

11.94

 

 Moradabad (Estimated Cost.= 36.77 ) 

S.No.

Type of work

Name of Executing Firms

Amount

(Rs. In Crore)

Current Status

1.

GIS mapping

M/s KLG Systel Ltd., Gurgaon

1.90

Work in Progress

2.

Construction of New 33 KV S/s

M/s Oriental Sales Corporation, Jaipur

2.62

Work in Progress

3.

R&M 33 KV S/s

M/s Crompton Greaves Ltd., Nasik

8.65

Work in Progress

4.

Construction of New 11 KV S/s

M/s Subhash Projects & Marketing Ltd., Kolkata

11.40

Work in Progress

5.

Reconductring of 33/11 KV / LT lines.

M/s Hythro power Corporation Ltd, New Delhi

3.50

Work in Progress

6.

Supply of Accuracy Check Meter

M/s Secur Meters, Udaypur

0.03

Material supplied

7.

Centrifuging machine

M/s Cee Dee Vaccume Equipment Pvt. Ltd., Pune

0.03

Material supplied

8.

Trolly Mounted S/s

M/s Kailash T/f, Azamgarh

0.05

Material supplied

9.

Cable fault locating system

M/s PCI, New Delhi.

0.41

Material supplied

                                                         Total:

28.59