You are at >> Tender & Notices

Search

  Best view in Internet Explorer (IE 6.0 or Later) only

For uploading tenders on this website, please email soft copy of tenders on tender@pvvnl.org

Tender Number Department Name of Material

Tender

Notice

Opening Date
22/W/2014-15 EUDD-II MZN Bill distribution of sub div purkaji.

Download

27.09.2014
21/W/2014-15 EUDD-II MZN Bill distribution work of sub div jansath.

Download

27.09.2014
20/W/2014-15 EUDD-II MZN Req. of vehicle with driver for revenue collection.

Download

27.09.2014
19/W/2014-15 EUDD-II MZN Req. of vehicle with driver for replacement of damaged transformer of sub div purkaji and eudd-i mzn.

Download

27.09.2014
18/W/2014-15 EUDD-II MZN Req. of vehicle with driver for replacement of damaged transformer of sub div jansath.

Download

27.09.2014
09/2014-15 EDD-II BARAUT Printing and supply of diff commercial letters/registers.

Download

18.09.2014
126/2014-15 EDC AMROHA Elctrification work in gram baska kala.

Download

10.10.2014
68/eddkhatoli/14-15 EDD KHATOLI Repairing and maintenance of VCB at sub station fugana.

Download

16.09.2014
67/eddkhatoli/14-15 EDD KHATOLI Repairing and maintenance of OCB at sub station sikandarpur.

Download

16.09.2014
66/eddkhatoli/14-15 EDD KHATOLI Repairing and maintenance of VCB at sub station luhsana.

Download

16.09.2014
65/eddkhatoli/14-15 EDD KHATOLI Repairing and maintenance of VCB at sub station khanpur.

Download

16.09.2014
62/eddkhatoli/14-15 EDD KHATOLI Req. of material for security, supply and maintenance of transformer.

Download

16.09.2014
68-71/2014-15 EDC-II BSR Req. of TG2 for operational work of various sub station.

Download

26.09.2014
65-67/2014-15 EDC-II BSR Req. of TG2 for operational work of various sub station.

Download

29.09.2014
18/2014-15 EUDD-II NOIDA Works of attending emergency break down of sub div-vii noida.

Download

18.09.2014
17/2014-15 EUDD-II NOIDA Works of attending emergency break down of sub div-vi noida.

Download

18.09.2014
16/2014-15 EUDD-II NOIDA Works of attending emergency break down of sub div-v noida.

Download

18.09.2014
08/2014-15 ETD MZN Req. of computer operator.

Download

30.09.2014
T-20/W/2014-15 ECWD SRE Construction of 11kv feeder and 33kv line at sub station kalsi gangoh.

Download

23.09.2014
T-19/W/2014-15 ECWD SRE Diff contruction work at sub station kalsi gangoh.

Download

23.09.2014
T-18/W/2014-15 ECWD SRE Construction of 11kv feeder and 33kv line at sub station beerakhedi.

Download

23.09.2014
T-10/2014-15 ETD GZB Req. of diesel vehicle.

Download

04.10.2014
21/W/EUDD/VII/14-15 EUDD-VII GZB Construction and high of line.

Download

19.09.2014
20/W/EUDD/VII/14-15 EUDD-VII GZB Earthling of power transformer and submersible water pump.

Download

19.09.2014
30/EDDH/2014-15 EDD HAPUR Diff transacted work under improve system scheme. Download 16.09.2014
32/2014-15 EUDD-VI GZB Supply of bolted type brass lugs.

Download

16.09.2014
31/2014-15 EUDD-VI GZB Works of repairing and overhauling.

Download

16.09.2014
11/2014-15 EDD-II LONI Req. of computer operator for newly sub div-ii.

Download

30.09.2014
10/2014-15 EDD-II LONI Req. of computer operator.

Download

30.09.2014
09/2014-15 EDD-II LONI Req. of computer operator.

Download

30.09.2014
08/2014-15 EDD-II LONI Req. of computer operator for sub div-i and ii.

Download

30.09.2014
07/2014-15 EDD-II LONI Req. of security person and gun man.

Download

27.09.2014
06/2014-15 EDD-II LONI Req. of computer operator.

Download

27.09.2014
05/2014-15 EDD-II LONI Req. of diesel generator with operator.

Download

27.09.2014
20/2014-15 EDD-II SHAMLI Construction of  link line for bucchakhedi town feeder of sub station jharkhedi.

Download

10.09.2014
19/2014-15 EDD-II SHAMLI Construction of  link line for jharkhedi rural feeder  of sub station jharkhedi.

Download

10.09.2014
18/2014-15 EDD-II SHAMLI Construction of  link line for 11kv feeder of sub station jharkhedi.

Download

10.09.2014
17/2014-15 EDD-II SHAMLI Construction of  link line for 11kv feeder of sub station islampur ghasoli.

Download

10.09.2014
36/W/2014-15 EUDD-V NOIDA Works of laying of LT cable and related work.

Download

12.09.2014
38/W/2014-15 EDD PILKHUA Construction of line, wire and pole.

Download

17.09.2014
37/W/2014-15 EDD PILKHUA Construction of line, wire and pole in sub div pilkhua and dasna.

Download

17.09.2014
36/W/2014-15 EDD PILKHUA Repairing , overhauling and wiring of VCB.

Download

17.09.2014
35/W/2014-15 EDD PILKHUA Works of overhauling.

Download

09.09.2014
33/W/2014-15 EDD PILKHUA Partition of samana feeder.

Download

09.09.2014
32/W/2014-15 EDD PILKHUA Partition of dholana feeder.

Download

09.09.2014
31/W/2014-15 EDD PILKHUA Construction of LT line and sub station.

Download

09.09.2014
T-11/W/2014-15 ECWD SRE Construction of 11kv feeder and 33kv line at sub station begrajpur.

Download

23.09.2014
T-10/W/2014-15 ECWD SRE Diff construction works at sub station begrajpur.

Download

23.09.2014
T-09/W/2014-15 ECWD SRE Construction of 11kv feeder and 33kv line at sub station khedi dudhadhari.

Download

23.09.2014
T-08/W/2014-15 ECWD SRE Diff construction works at sub station khedi dudhadhari.

Download

23.09.2014
11-14/2014-15 EDC-I MBD Req. of skilled and unskilled labour for maintenance of 33/11kv sub station.

Download

09.09.2014
21/2014-15 ECDD SRE Construction of boundrywall, at sub station suzdu (store centre).

Download

26.09.2014
20/2014-15 ECDD SRE Construction of boundrywall, at sub station shamli (store centre).

Download

26.09.2014
19/2014-15 ECDD SRE Construction of boundrywall, at sub station kairana.

Download

26.09.2014
18/2014-15 ECDD SRE Construction of boundrywall, at sub station kandela.

Download

26.09.2014
17/2014-15 ECDD SRE Construction of boundrywall, at sub station nakur.

Download

26.09.2014
16/2014-15 ECDD SRE Construction of boundrywall, at sub station nanota.

Download

26.09.2014
18/2014-15 EUDD-I NOIDA Replacement of transformer.

Download

09.09.2014
T-09/2014-15 ETD-I BSR Meter replacement work in debai town of edd debai.

Download

23.09.2014
T-08/2014-15 ETD-I BSR Meter replacement work in khurja town of edd-khurja.

Download

23.09.2014
T-07/2014-15 ETD-I BSR Meter replacement work in bsr town of edd-ii bsr.

Download

23.09.2014
32/2014-15 EDC BIJNOR Req. of skilled/unskilled labour for maintenance of sub station nahtor and afjalgarh.

Download

10.09.2014
31/2014-15 EDC BIJNOR Req. of skilled/unskilled labour for maintenance of sub station dhampur and sherkot.

Download

10.09.2014
25/2014-15 EDC AMROHA Rectification work in gram kalakheda block joya.

Download

29.09.2014
T-41/2014-15 EDD-I MBD Construction of new transformer and capacity increment.

Download

06.09.2014
29/2014-15 ECDD GZB Works of control room building and other civil works at sub station ishaknagar dist. gzb.

Download

30.09.2014
T-12/W/2014-15 ECWD SRE Construction of 33/11KV, 15 MVA Sub-Station DANGHEDA  (Distt. Saharanpur), alongwith constructions of 33KV Line and 11 KV Link Lines.

Download

12.09.2014
05/2014-15 EUDD-I MBD Construction of LT sub station and shifting of 11kv , 33kv, LT line and transformer.

Download

16.09.2014
11/2014-15 EDD BIJNOR Misc. work.

Download

12.09.2014
PVVNL-MT/37(S)14-15 Material Management Supply of pre printed computer stationary.

Download

19.09.2014
13/2014-15 EDD-III BSR Construction and loading of VCB.

Download

25.09.2014
52/2014-15 EUDD-I MZN Repairing/rectification of fore and double pole.

Download

27.09.2014
51/2014-15 EUDD-I MZN Repairing/rectification of line and straight of pole.

Download

27.09.2014
50/2014-15 EUDD-I MZN Works of repairing, rectification and earthling of transformer.

Download

27.09.2014
49/2014-15 EUDD-I MZN Supply of secure make LT TVM.

Download

14.09.2014
48/2014-15 EUDD-I MZN Req. of generator with operator at sub station chodi gali main road nai mandi.

Download

14.09.2014
47/2014-15 EUDD-I MZN Req. of generator with operator at eudc and eudd-i mzn.

Download

14.09.2014
46/2014-15 EUDD-I MZN Req. of generator with operator at sub station jansath road.

Download

14.09.2014
45/2014-15 EUDD-I MZN Req. of generator with operator at sub station town hall and mandi samiti.

Download

14.09.2014
44/2014-15 EUDD-I MZN Req. of generator with operator at sub station mahaveer chowk.

Download

14.09.2014
43/2014-15 EUDD-I MZN Req. of generator with operator at sub station mimlana road.

Download

14.09.2014
42/2014-15 EUDD-I MZN Req. of generator with operator at sub station shamli road.

Download

14.09.2014
41/2014-15 EUDD-I MZN Req. of computer operator of eudc mzn.

Download

14.09.2014
40/2014-15 EUDD-I MZN Req. of computer operator of sub div-iv.

Download

14.09.2014
39/2014-15 EUDD-I MZN Req. of computer operator of sub div-iii.

Download

14.09.2014
38/2014-15 EUDD-I MZN Req. of computer operator of sub div-ii.

Download

14.09.2014
37/2014-15 EUDD-I MZN Req. of computer operator of sub div-i.

Download

14.09.2014
36/2014-15 EUDD-I MZN Repairing/rectification of fore and double pole.

Download

27.09.2014
35/2014-15 EUDD-I MZN Repairing/rectification of line and straight of pole.

Download

27.09.2014
PVVNL-MT/24/2014-15 Material Management Supply of 15000 Nos. LT Metering Cubicle (With CT).

Download

10.09.2014
49/EWC/ MRT/W/2014-15 EWC MRT Supply of T-slot spares made from pre compressed board.

Download

05.09.2014
48/EWC/ MRT/W/2014-15 EWC MRT Supply of pre compressed wedges.

Download

05.09.2014
47/EWC/ MRT/W/2014-15 EWC MRT Supply of pre compressed sheet.

Download

05.09.2014
46/EWC/ MRT/W/2014-15 EWC MRT Supply of LT bushing rod made of brass 1350Nos.

Download

05.09.2014
45/EWC/ MRT/W/2014-15 EWC MRT Supply of LT bushing rod made of brass 250Nos.

Download

05.09.2014
44/EWC/ MRT/W/2014-15 EWC MRT Supply of leathered insulated press paper.

Download

05.09.2014
ST-21/W/2014-15 ECWD SRE WORK OF INCREASING CAPACITY OF 33/11KV SUB-STATION  KUTABA (MUZAFFARNAGAR),  FROM 1X10 MVA TO 110 + 15 MVA.

Download

03.09.2014
T-19/2014-15 EDD-I BSR Replacement and transportation of transformer.

Download

06.09.2014
17/W/2014-15 EUDD-I NOIDA Earthling of diff transformer.

Download

05.09.2014
16/W/2014-15 EUDD-I NOIDA Req. of diesel vehicle.

Download

05.09.2014
15/W/2014-15 EUDD-I NOIDA Loading of diff material.

Download

05.09.2014
41/2014-15 ECDD MBD Construction of interlocking tiles.

Download

12.09.2014
05-10/2014-15 EDC-I MBD Req. of skilled and unskilled labour for maintenance of 33/11kv sub station.

Download

02.09.2014
07/2014-15 ETD MZN Repairing of PT housing.

Download

20.09.2014
13/2014-15 EWD GZB Loading of material for repairing of  medium capacity transformer.

Download

12.09.2014
12/2014-15 EWD GZB Loading of material for repairing of small capacity transformer.

Download

12.09.2014
PVVNL-MT/36(S)/2014-15 Material Management Supply of 60000 Nos. 45 KN (T&C) Type Disc fitting.

Download

10.09.2014
PVVNL-MT/35(S)/2014-15 Material Management Supply of 200000 Nos. 11 KV GI Pin (With nut).

Download

10.09.2014
04/2014-15 EDD-II LONI Supply of furniture.

Download

10.09.2014
28/2014-15 ECWD GZB Construction of 11kv feeder for sub station jarara bsr.

Download

12.09.2014
40/2014-15 ECDD MBD Works of boundrywall, main gate & other civil works at sub station workshop rampur.

Download

27.09.2014
39/2014-15 ECDD MBD Works of boundrywall, main gate & other civil works at sub station pavasa.

Download

27.09.2014
38/2014-15 ECDD MBD Works of boundrywall, main gate & other civil works at sub station bahjoi.

Download

27.09.2014
37/2014-15 ECDD MBD Works of boundrywall, main gate & other civil works at sub station kundarki.

Download

27.09.2014
36/2014-15 ECDD MBD Works of boundrywall, main gate & other civil works at sub station kanth.

Download

27.09.2014
35/2014-15 ECDD MBD Works of boundrywall, main gate & other civil works at sub station bilari.

Download

27.09.2014
34/2014-15 ECDD MBD Construction of office building & other civil works of eudsd-iii mbd.

Download

23.09.2014
33/2014-15 ECDD MBD Construction of office building & other civil works of ecdsd bijnor.

Download

23.09.2014
32/2014-15 ECDD MBD Construction of office building & other civil works of eutd-iii mbd.

Download

23.09.2014
31/2014-15 ECDD MBD Works of control room building, boundrywall, hand pump & other civil works at sub station rustampur nyawali.

Download

19.09.2014
30/2014-15 ECDD MBD Works of control room building, boundrywall, hand pump & other civil works at sub station asmoli.

Download

19.09.2014
PVVNL-MT/RGGVY-II/34(S)/2014-15 PVVNL RGGVY Work of creation of Rural Electricity Infrastructure and Rural Household Electrification under Rajiv Gandhi Grameen Vidyutikaran Yojana (RGGVY PHASE-II) 12th Plan on Turnkey Basis for Rampur.

Part-1

Part-2

26.09.2014
PVVNL-MT/RGGVY-II/33(S)/2014-15 PVVNL RGGVY Work of creation of Rural Electricity Infrastructure and Rural Household Electrification under Rajiv Gandhi Grameen Vidyutikaran Yojana (RGGVY PHASE-II) 12th Plan on Turnkey Basis for Meerut. Part-1

Part-2

26.09.2014
PVVNL-MT/RGGVY-II/32(S)/2014-15 PVVNL RGGVY Work of creation of Rural Electricity Infrastructure and Rural Household Electrification under Rajiv Gandhi Grameen Vidyutikaran Yojana (RGGVY PHASE-II) 12th Plan on Turnkey Basis for Saharanpur. Part-1

Part-2

26.09.2014
PVVNL-MT/RGGVY-II/31(S)/2014-15 PVVNL RGGVY Work of creation of Rural Electricity Infrastructure and Rural Household Electrification under Rajiv Gandhi Grameen Vidyutikaran Yojana (RGGVY PHASE-II) 12th Plan on Turnkey Basis for Hapur. Part-1

Part-2

26.09.2014
PVVNL-MT/RGGVY-II/30(S)/2014-15 PVVNL RGGVY Work of creation of Rural Electricity Infrastructure and Rural Household Electrification under Rajiv Gandhi Grameen Vidyutikaran Yojana (RGGVY PHASE-II) 12th Plan on Turnkey Basis for Ghaziabad. Part-1

Part-2

26.09.2014
PVVNL-MT/RGGVY-II/29(S)/2014-15 PVVNL RGGVY Work of creation of Rural Electricity Infrastructure and Rural Household Electrification under Rajiv Gandhi Grameen Vidyutikaran Yojana (RGGVY PHASE-II) 12th Plan on Turnkey Basis for Sambhal. Part-1

Part-2

26.09.2014
PVVNL-MT/RGGVY-II/28(S)/2014-15 PVVNL RGGVY Work of creation of Rural Electricity Infrastructure and Rural Household Electrification under Rajiv Gandhi Grameen Vidyutikaran Yojana (RGGVY PHASE-II) 12th Plan on Turnkey Basis for Amroha. Part-1

Part-2

26.09.2014
PVVNL-MT/RGGVY-II/27(S)/2014-15 PVVNL RGGVY Work of creation of Rural Electricity Infrastructure and Rural Household Electrification under Rajiv Gandhi Grameen Vidyutikaran Yojana (RGGVY PHASE-II) 12th Plan on Turnkey Basis for Moradabad. Part-1

Part-2

26.09.2014
PVVNL-MT/RGGVY-II/26(S)/2014-15 PVVNL RGGVY Work of creation of Rural Electricity Infrastructure and Rural Household Electrification under Rajiv Gandhi Grameen Vidyutikaran Yojana (RGGVY PHASE-II) 12th Plan on Turnkey Basis for Noida. Part-1

Part-2

26.09.2014
03/2014-15 EDD-I BARAUT Works of electrification and rectification in gram kishanpur.

Download

05.09.2014
02/2014-15 EDD-I BARAUT Works of electrification and rectification in gram sherpur.

Download

05.09.2014
01/2014-15 EDD-I BARAUT Works of electrification and rectification in gram silana.

Download

05.09.2014
10/2014-15 EDD BIJNOR Misc. work.

Download

06.09.2014
37/2014-15 ECDD MRT Works of outer wall at sub station medical collage.

Download

23.09.2014
36/2014-15 ECDD MRT Works of outer wall at sub station narangpur.

Download

23.09.2014
35/2014-15 ECDD MRT Works of outer wall at sub station binoli.

Download

23.09.2014
34/2014-15 ECDD MRT Works of outer wall at sub station pareechatgah.

Download

23.09.2014
33/2014-15 ECDD MRT Works of outer wall at sub station hastinapur.

Download

23.09.2014
45/2014-15 EDD-I SHAMLI Construction of cable.

Download

22.09.2014
44/2014-15 EDD-I SHAMLI Operational work of sub station kandela.

Download

06.09.2014
12/2014-15 EDD-III BSR Construction and replacement of plinth.

Download

10.09.2014
36/EWC/ MRT/W/2014-15 EWC MRT Construction of power panel, mccb cable, cable tray etc.

Download

28.08.2014
35/EWC/ MRT/W/2014-15 EWC MRT Transportation of 160-1000kva capacity transformer.

Download

28.08.2014
34/EWC/ MRT/W/2014-15 EWC MRT Transportation of 25-100kva capacity transformer.

Download

28.08.2014
33/EWC/ MRT/W/2014-15 EWC MRT Repairing of damaged transformer.

Download

28.08.2014
61/eddkhatoli/14-15 EDD KHATOLI Supply of spare parts.

Download

28.08.2014
60/eddkhatoli/14-15 EDD KHATOLI Repairing of kural, biralasi feeder.

Download

28.08.2014
59/eddkhatoli/14-15 EDD KHATOLI Repairing of badkata feeder.

Download

28.08.2014
T-14/W/2014-15 ECWD SRE Construction of 11kv feeder & 33kv line from sub station daidpura.

Download

16.09.2014
T-17/W/2014-15 ECWD SRE Construction of 11kv feeder & 33kv line from sub station nathodi.

Download

16.09.2014
T-16/W/2014-15 ECWD SRE Diff civil works at sub station nathodi.

Download

16.09.2014
T-15/W/2014-15 ECWD SRE Construction of 11kv feeder & 33kv line from sub station radhedi.

Download

16.09.2014
T-13/W/2014-15 ECWD SRE Construction of 11kv feeder & 33kv line from sub station bhairmau.

Download

16.09.2014
21/2014-15 EDD CHANDOSI Construction and replacement of AV conductor.

Download

30.08.2014

10/ecwd/mrt/w/14-15 ECWD MRT Construction of 33kv line and 11kv feeder at sub station khoddayalpur mawana.

Download

12.09.2014
09/ecwd/mrt/w/14-15 ECWD MRT Construction of 33kv line and 11kv feeder at sub station niloha.

Download

12.09.2014
43/2014-15 EDD-I SHAMLI Construction of link line at sub station chosana.

Download

19.09.2014
42/2014-15 EDD-I SHAMLI Construction of link line at sub station gagor.

Download

19.09.2014
27/2014-15 ECWD GZB Construction of 33kv link line(under ground cable).

Download

09.09.2014
06/2014-15 EDD-III BSR Construction of 11kv link line.

Download

30.08.2014
28/2014-15 ECDD GZB Construction of boundrywall at sub station khurja road sikandrabad.

Download

24.09.2014
27/2014-15 ECDD GZB Construction of boundrywall at sub station arniya.

Download

24.09.2014
26/2014-15 ECDD GZB Construction of boundrywall at sub station kamla nehru nagar.

Download

24.09.2014
25/2014-15 ECDD GZB Construction of boundrywall at sub station UPSIDC.

Download

24.09.2014
24/2014-15 ECDD GZB Supply of furniture.

Download

17.09.2014
23/2014-15 ECDD GZB Upgradation of shakti sadan.

Download

17.09.2014
22/2014-15 ECDD GZB Construction of pcc pole at sub station rawali road murad nagar.

Download

08.09.2014
58/eddkhatoli/14-15 EDD KHATOLI Work of providing and fixing of ISI mark XLPE Cable.

Download

25.08.2014
37/EWC/ MRT/W/2014-15 EWC MRT Works of letter writing at computer, table and data entry.

Download

30.08.2014
08/2014-15 EDD-II BARAUT Rectification work in gram sahjahanpur.

Download

25.08.2014
07/2014-15 EDD-II BARAUT Rectification work in gram idreeshpur.

Download

25.08.2014
06/2014-15 EDD-II BARAUT Rectification work in gram himmatpur.

Download

25.08.2014
05/2014-15 EDD-II BARAUT Rectification work in gram pusar.

Download

25.08.2014
04/2014-15 EDD-II BARAUT Rectification work in gram bijrol.

Download

25.08.2014
03/2014-15 EDD-II BARAUT Rectification work in gram barnava.

Download

25.08.2014
02/2014-15 EDD-II BARAUT Rectification work in gram gangnoli.

Download

25.08.2014
01/2014-15 EDD-II BARAUT Rectification work in gram teekari.

Download

25.08.2014
PVVNL-MT/25/2014-15 Material Management Supply of 4000 Nos. 11/0.4 KV, 3 Phase, 25 KVA, 3 Star, rated Distribution Transformers (with internal breaker).CORRIGENDUM

Download

01.09.2014
51/2014-15 EDD MZN Repairing of VCB.

Download

28.08.2014
50/2014-15 EDD MZN Req. of diesel vehicle with driver.

Download

28.08.2014
46/edd/debai/14-15 EDD DEBAI Works of checking of consumers indexing.

Download

08.09.2014
45/edd/debai/14-15 EDD DEBAI Replacement of pole, insulator disk, clamp etc in sub div debai-i.

Download

08.09.2014
44/edd/debai/14-15 EDD DEBAI Replacement of pole, insulator disk, clamp etc in sub div bheempur.

Download

08.09.2014
43/edd/debai/14-15 EDD DEBAI Letter photo state work.

Download

30.08.2014
41/edd/debai/14-15 EDD DEBAI Rectification of line in gram govt tubel.

Download

27.08.2014
40/edd/debai/14-15 EDD DEBAI Rectification of line in gram nagla nau & akbarapur.

Download

27.08.2014
39/edd/debai/14-15 EDD DEBAI Rectification of line in gram satwara.

Download

27.08.2014
38/edd/debai/14-15 EDD DEBAI Rectification of line in gram saalvahapur & ahmadvas.

Download

27.08.2014
104/W/2014-15 EDD-II MRT Electrification, rectification and repairing work in gram jafrabad durveshpur.

Download

23.09.2014
103/W/2014-15 EDD-II MRT Electrification, rectification and repairing work in gram khirwa noabad.

Download

23.09.2014
102/W/2014-15 EDD-II MRT Electrification, rectification and repairing work in gram harra.

Download

23.09.2014
101/W/2014-15 EDD-II MRT Electrification, rectification and repairing work in gram meethepur.

Download

23.09.2014
100/W/2014-15 EDD-II MRT Electrification, rectification and repairing work in gram mahal.

Download

23.09.2014
99/W/2014-15 EDD-II MRT Electrification, rectification and repairing work in gram khedi tappa lawad.

Download

23.09.2014
06/2014-15 ETD MZN Supply of diff ratio LT CT resin cast, ring type.

Download

10.09.2014
01-09/2014-15 EDD BAGHPAT Electrification, rectification and repairing work in various gram.

Download

30.08.2014
09/2014-15 EUDD-II GZB Works of welding & plinth.

Download

08.09.2014
08/2014-15 EUDD-II GZB Transportation work.

Download

08.09.2014
07/2014-15 EUDD-II GZB Replacement of VCB.

Download

08.09.2014
06/2014-15 EUDD-II GZB Works of water level earthling.

Download

08.09.2014
05/2014-15 EUDD-II GZB Misc. works.

Download

08.09.2014
04/2014-15 EUDD-II GZB Transportation work.

Download

08.09.2014
03/2014-15 EUDD-II GZB Construction of LT sub station.

Download

08.09.2014
02/2014-15 EUDD-II GZB Misc. works.

Download

08.09.2014
26/2014-15 ECWD GZB Construction of 11kv link feeder for sub station talheta.

Download

02.09.2014
09/2014-15 EDD BIJNOR Misc. works.

Download

26.08.2014
32/2014-15 ECDD MRT Construction of two storey building.

Download

16.09.2014
21/2014-15 ECDD GZB Auction of scrap HT wire.

Download

28.08.2014
11/2014-15 EDD-III BSR Supply of computer operator.

Download

30.08.2014
10/2014-15 EDD-III BSR Transportation and re-establishment of repaired transformer.

Download

30.08.2014
03/2014-15 EDD-II LONI Req. of diesel vehicle with driver for sub div-ii.

Download

30.08.2014
02/2014-15 EDD-II LONI Req. of diesel vehicle with driver for sub div-i.

Download

30.08.2014
01/2014-15 EDD-II LONI Req. of diesel vehicle with driver.

Download

30.08.2014
81/W/2014-15 EDD-III MRT Works of earthling of transformer and items at sub station maliyana.

Download

05.09.2014
80/W/2014-15 EDD-III MRT Works of jointing of feeder.

Download

24.09.2014
79/W/2014-15 EDD-III MRT Works of earthling of transformer of edsd-iii bhola.

Download

24.09.2014
78/W/2014-15 EDD-III MRT Works of earthling of transformer of edsd-ii pallavpuram.

Download

24.09.2014
77/W/2014-15 EDD-III MRT Works of earthling of transformer of edsd-i maliyana.

Download

24.09.2014
43/EWC/ MRT/W/2014-15 EWC MRT Supply of neoprine oil seal for repairing of damaged transformer.

Download

21.08.2014
42/EWC/ MRT/W/2014-15 EWC MRT Supply of finned air heaters U type of length for repairing of medium capacity damaged transformer.

Download

21.08.2014
41/EWC/ MRT/W/2014-15 EWC MRT Supply of gasket set made of rubberized for repairing of  damaged transformer.

Download

21.08.2014
40/EWC/ MRT/W/2014-15 EWC MRT Supply of gasket set made of rubberized for repairing of 25-100kva capacity damaged transformer.

Download

21.08.2014
39/EWC/ MRT/W/2014-15 EWC MRT Repairing of 250-1000kva capacity damaged transformer in ctr workshop gzb.

Download

21.08.2014
38/EWC/ MRT/W/2014-15 EWC MRT Repairing of 25-630kva capacity damaged transformer in ctr workshop bijnor.

Download

21.08.2014
19/2014-15 EDC AMROHA Replacement of transformer.

Download

16.09.2014
57/eddkhatoli/14-15 EDD KHATOLI Maintenance of 33kv and 11kv feeder from sub station parasoli.

Download

18.08.2014
56/eddkhatoli/14-15 EDD KHATOLI Maintenance of 33kv and 11kv feeder from sub station kakda.

Download

18.08.2014
55/eddkhatoli/14-15 EDD KHATOLI Operational work of sub station parasoli.

Download

18.08.2014
17/W/2014-15 EUDD-II MZN Repairing of incoming vcb of purkaji town feeder and BTC feeder.

Download

22.08.2014
16/W/2014-15 EUDD-II MZN Repairing of incoming vcb at sub station purkaji and kakroli.

Download

22.08.2014
25/2014-15 ECWD GZB Construction of 11kv link feeder for sub station ishaknagar

Download

19.09.2014
24/2014-15 ECWD GZB Construction of 33kv line for sub station fareednagar.

Download

19.09.2014
23/2014-15 ECWD GZB Construction of sub station ishak nagar.

Download

19.09.2014
22/2014-15 ECWD GZB Construction of 33kv line for sub station teelamod.

Download

19.09.2014
21/2014-15 ECWD GZB Construction of for sub station fulera.

Download

19.09.2014
20/2014-15 ECWD GZB Construction of 11kv link feeder for sub station fulera.

Download

19.09.2014
30/2014-15 EUDD-VI GZB Supply of HT tape material.

Download

23.08.2014
29/2014-15 EUDD-VI GZB Supply of empire tape material.

Download

23.08.2014
28/2014-15 EUDD-VI GZB Loading and unloading of damaged transformer.

Download

23.08.2014
27/2014-15 EUDD-VI GZB Works of carrying of related officer/JE/employee and marking of electric complaints.

Download

23.08.2014
26/2014-15 EUDD-VI GZB Works of finding and filling of fault using fault locator machine of under cable of sub station vikram enclave.

Download

23.08.2014
25/2014-15 EUDD-VI GZB Works of finding and filling of fault using fault locator machine of under cable of sub station shalimar garden.

Download

23.08.2014
PVVNL/M/HQ/ 09/2014-15 PVVNL MRT HQ Construction of power feeder empier volt meter and MCCB extra bus bars panel (cubical type) at MD office urja bhawan Victoria park mrt.

Download

30.08.2014
T-17/2014-15 EDD-I BSR Supply of diff type MS clamps.

Download

23.08.2014
T-16/2014-15 EDD-I BSR Correction of damaged pole, line & transformer.

Download

23.08.2014
T-15/2014-15 EDD-I BSR Works of correction of wire & loose line.

Download

23.08.2014
T-14/2014-15 EDD-I BSR Construction of line & related work.

Download

23.08.2014
28/EDDH/2014-15 EDD HAPUR Electrification work. Download 22.08.2014
19/2014-15 ECWD GZB Construction of 33kv line.

Download

16.09.2014
16/EDDG/2014-15 EDD GARH Req. of skilled person.

Download

19.08.2014
15/EDDG/2014-15 EDD GARH Works of stop oil leakage.

Download

19.08.2014
14/EDDG/2014-15 EDD GARH Capacity increment of sub station gohra.

Download

19.08.2014
34-37/edd/debai/14-15 EDD DEBAI Rectification of line in various gram.

Download

26.08.2014
30-33/edd/debai/14-15 EDD DEBAI Rectification of line in various gram.

Download

25.08.2014
29/EDDH/2014-15 EDD HAPUR Diff transacted work. Download 22.08.2014
27/EDDH/2014-15 EDD HAPUR Supply of LT and HT bushing rod. Download 22.08.2014
26/EDDH/2014-15 EDD HAPUR Supply of tind wire, fuse wire, 33kv line islotlator & rubberized cork sheet etc. Download 22.08.2014
25/EDDH/2014-15 EDD HAPUR Supply of spout set, CT side spout set , spout contact assembly, exposi cast etc. Download 22.08.2014
24/EDDH/2014-15 EDD HAPUR Diff transacted work.

Download

27.08.2014
T-61-64/2014-15 EDC-II BSR Maintenance of 11kv feeder from various  sub station.

Download

10.09.2014
107/W/2014-15 EDD-II MRT Req. of gang for maintenance of 11kv feeder from sub station sakoti , chur and saroorpur.

Download

16.08.2014
106/W/2014-15 EDD-II MRT Req. of gang for maintenance of 11kv feeder from sub station sardhana nagar.

Download

16.08.2014
105/W/2014-15 EDD-II MRT Req. of gang for maintenance of 11kv feeder from sub station nagli aajad.

Download

16.08.2014
PVVNL-MT/23(S) /2014-15 Material Management Supply of 750 Nos. Vaccume Interrupter of different make.

Download

19.09.2014
28/2014-15 ECWD MBD Construction of 33kv & 11kv line for sub station islampur.

Download

11.09.2014
27/2014-15 ECWD MBD Construction of new sub station islampur.

Download

11.09.2014
26/2014-15 ECWD MBD Construction of 33kv & 11kv line for  sub station khaikhedi.

Download

11.09.2014
25/2014-15 ECWD MBD Construction of new sub station khaikhedi.

Download

11.09.2014
35/W/2014-15 EUDD-V NOIDA Works of making new LT double circuit line for load distribution of 400kva transformer.

Download

16.08.2014
34/W/2014-15 EUDD-V NOIDA Req. of complete computer system and operator.

Download

30.08.2014
31/W/2014-15 EDD MODINAGAR Replacement of wire, pole & transformer of edsd-iii modinagar.

Download

16.08.2014
30/W/2014-15 EDD MODINAGAR Replacement of wire, pole & transformer of edsd-ii modinagar.

Download

16.08.2014
29/W/2014-15 EDD MODINAGAR Construction of CT/PT structure, meter room.

Download

29.08.2014
11/2014-15 EDD-III SHAMLI Rectification of diff line of sub div-ii.

Download

14.08.2014
10/2014-15 EDD-III SHAMLI Rectification of diff line of sub div-i.

Download

14.08.2014
32/EWC/ MRT/W/2014-15 EWC MRT Repairing of 25-100kva capacity damaged transformer.

Download

27.08.2014
31/EWC/ MRT/W/2014-15 EWC MRT Supply of AI jointing sleeves.

Download

27.08.2014
30/EWC/ MRT/W/2014-15 EWC MRT Supply of insulating craft paper.

Download

13.08.2014
01/2014-15 EUTD MBD Req. of four wheeler diesel vehicle with driver.

Download

01.09.2014
10/W/2014-15 EUDD-II MZN Req. of sso skilled labour for operational work  of  sub station jansath.

Download

14.08.2014
09/W/2014-15 EUDD-II MZN Req. of gang for daily maintenance  of feeder in sub station jansath.

Download

14.08.2014
15/2014-15 ECDD SRE Construction work of control room building boundrywall, security wall, security fencing, hand pump & other civil work at sub station shamali shamla.

Download

03.09.2014
14/2014-15 ECDD SRE Construction work of control room building boundrywall, security wall, security fencing, hand pump & other civil work at sub station dadheda.

Download

03.09.2014
13/2014-15 ECDD SRE Construction work of control room building boundrywall, security wall, security fencing, hand pump & other civil work at sub station khedidoodhadhari.

Download

03.09.2014
12/2014-15 ECDD SRE Construction work of control room building boundrywall, security wall, security fencing, hand pump & other civil work at sub station bhumma meerapur.

Download

03.09.2014
11/2014-15 ECDD SRE Construction work of control room building boundrywall, security wall, security fencing, hand pump & other civil work at sub station khudda barla.

Download

03.09.2014
PVVNL-MT/18 /2014-15 Material Management Supply, installation of 10000 Nos. AMR Modem and integrate them with the system being developed by HCL Tech.

Download

19.08.2014
29/2014-15 ECDD MBD Construction of two storey control room building & other civil works at sub station shivpuri.

Download

11.09.2014
28/2014-15 ECDD MBD Supply of 9000No. cement sacks.

Download

21.08.2014
27/2014-15 ECDD MBD Works of control room building, boundrywall, handpump & other civil works at sub station khai khedi.

Download

10.09.2014
26/2014-15 ECDD MBD Works of control room building, boundrywall, handpump & other civil works at sub station islampur sadant.

Download

10.09.2014
12/2014-15 EDC SAMBHAL Construction of meter at new connection.

Download

14.08.2014
03/W/2014-15 EUDD-I SRE Release diff tube well connection. Download 13.08.2014
08/S/2014-15 EDD MODINAGAR Supply of diff type spare parts for obc.

Download

13.08.2014
07/S/2014-15 EDD MODINAGAR Supply of diff clamp & joj blade.

Download

13.08.2014
06/S/2014-15 EDD MODINAGAR Supply of diff size state through.

Download

13.08.2014
35/W/2014-15 EDD MODINAGAR Establishment of vcb.

Download

13.08.2014
34/W/2014-15 EDD MODINAGAR Construction of new11kv feeder.

Download

13.08.2014
33/W/2014-15 EDD MODINAGAR Rectification of line & pole straight, replacement damaged wire.

Download

13.08.2014
32/W/2014-15 EDD MODINAGAR Replacement of 05mva transformer.

Download

13.08.2014
PVVNL-MT/20(s) /2014-15 Material Management Work Repair of estimate quantity 2000 nos. 10KVA & 16 KVA, single phase, amorphous core type aluminum wound damage transformers.

Download

09.09.2014
PVVNL-MT/21(s) /2014-15 Material Management Supply of 500 nos. New S.B.M. Machine.

Download

19.09.2014
30/W/2014-15 EDD PILKHUA Construction of HT/LT line of sub div dasna.

Download

13.08.2014
29/W/2014-15 EDD PILKHUA Construction of HT/LT line of sub div pilkhua.

Download

13.08.2014
28/S/2014-15 EDD PILKHUA Purchasing of spout set, vcb, hand glubs etc.

Download

13.08.2014
27/S/2014-15 EDD PILKHUA Purchasing of spout set contact, sowar contact, charging baring, garai etc.

Download

13.08.2014
26/W/2014-15 EDD PILKHUA Execution of 11kv & HT/LT line and works of earthling, plinth, construction of transformer.

Download

13.08.2014
16/2014-15 EDD-II SHAMLI Req. of diesel generator without diesel.

Download

11.08.2014
15/2014-15 EDD-II SHAMLI Req. of computer operator.

Download

11.08.2014
14/2014-15 EDD-II SHAMLI Establishment of 05mva transformer.

Download

11.08.2014
25/2014-15 ECDD MBD Extension of control room and other civil works at sub station mainather.

Download

27.08.2014
32/W/2014-15 EUDD-V NOIDA Supply of pole clamps.

Download

10.08.2014
20/2014-15 EDD CHANDOSI Replacement of GI wire and construction of line.

Download

30.08.2014

19/2014-15 EDD CHANDOSI Maintenance of LT sub station , release connection and line.

Download

19.08.2014

45/W/2014-15 EDC SRE Req. of diesel vehicle with driver.

Download

13.08.2014
44/W/2014-15 EDC SRE Supply and printing of diff commercial letters/registers.

Download

13.08.2014
43/W/2014-15 EDC SRE Works related to peon.

Download

13.08.2014
42/W/2014-15 EDC SRE Guarding and construction of pole.

Download

13.08.2014
41/W/2014-15 EDC SRE Works related to incoming VCB and control panel.

Download

13.08.2014
40/W/2014-15 EDC SRE Misc. Works.

Download

13.08.2014
39/W/2014-15 EDC SRE Req. of diesel generator set with operator.

Download

13.08.2014
41/2014-15 EDD-I SHAMLI Operational work of sub station mansura.

Download

20.08.2014
40/2014-15 EDD-I SHAMLI Operational work of sub station pawti kalan.

Download

20.08.2014
39/2014-15 EDD-I SHAMLI Replacement of 05mva transformer.

Download

12.08.2014
38/2014-15 EDD-I SHAMLI Construction of cable.

Download

12.08.2014
67/2014-15 EUDD-II MRT Maintenance of 11kv feeder from 33kv sub station.

Download

26.08.2014
48/2014-15 EDD MZN Misc. work.

Download

12.08.2014
47/2014-15 EDD MZN Repairing with requirement of vcb & copper bus bars.

Download

12.08.2014
46/2014-15 EDD MZN Repairing with requirement of vcb.

Download

12.08.2014
37/W/201-15 EDD MODINAGAR Repairing of damaged transformer fencing.

Download

11.08.2014
36/W/201-15 EDD MODINAGAR Replacement of 10mva transformer.

Download

11.08.2014
12/S/201-15 EDD MODINAGAR Supply of jo, blade, PG clamp.

Download

11.08.2014
13/S/201-15 EDD MODINAGAR Supply of 11kv alstom make VCB spare parts.

Download

11.08.2014
12/S/201-15 EDD MODINAGAR Supply of diff size 33kv outdoor cable box.

Download

11.08.2014
T-40/2014-15 EDD-I MBD Bill distribution work in rural area of edsd bilari.

Download

28.08.2014
T-27/2014-15 EDD-I MBD Construction of line for release connection/ load increment.

Download

07.08.2014
T-26/2014-15 EDD-I MBD Construction of 11kv line for load distribution of budanpur feeder.

Download

07.08.2014
31/2014-15 ECDD MRT Construction of control room building building & other civil works at sub station ishak nagar pilkhua.

Download

30.08.2014
30/2014-15 ECDD MRT Construction of two storey control room building building & other civil works at sub station suraj kund meerut.

Download

30.09.2014
PVVNL/M/HQ/ 08/2014-15 PVVNL MRT HQ Works of providing 03 commercial registration light diesel vehicle (car) with driver.

Download

20.08.2014
PVVNL-MT/22(s) /2014-15 Material Management Work of Printing& supply of 5000 nos copies of Annual account reports for five years of pvvnl,Meerut.

Download

20.08.2014
30/2014-15 EDC BIJNOR Req. of skilled/unskilled labour for maintenance of sub station alluddinpur.

Download

07.08.2014
29/2014-15 EDC BIJNOR Req. of labour for operational work of sub station alluddinpur.

Download

07.08.2014
28/2014-15 EDC BIJNOR Req. of skilled/unskilled labour for maintenance of sub station fulsanda.

Download

07.08.2014
27/2014-15 EDC BIJNOR Req. of skilled/unskilled labour for maintenance of sub station badapur.

Download

07.08.2014
26/2014-15 EDC BIJNOR Repairing & tightening of loose wire.

Download

07.08.2014
25/2014-15 EDC BIJNOR Works of wire mess fencing, plinth & water level earthling.

Download

07.08.2014
24/2014-15 EDC BIJNOR Release connection & construction of new sub station.

Download

07.08.2014
25/W/2014-15 EDC SRE Construction of plinth, mandebox feeder and replacement of ocb/vcb.

Download

07.08.2014
34/2014-15 EUDD-I MZN Supply of Vacuum Interrupter suitable for 11KV biecco Make VCB. For 12 KV normal Current 800 Amp. & breaking current 18.4 KV.

Download

28.08.2014
33/2014-15 EUDD-I MZN Supply of Vaccum Interrupter suitable for 11KV ABB Make VCB for 12 KV Normal Currant 800 amp.

Download

28.08.2014
19/W/EUDD/VII/14-15 EUDD-VII GZB Works of painting of consumers details of sub div-ii nandgram.

Download

13.08.2014
18/W/EUDD/VII/14-15 EUDD-VII GZB Works of painting of consumers details of sub div-i, patel nagar-ii.

Download

13.08.2014
04/2014-15 ETD SHAMLI Supply of diff ratio LT metering CT.

Download

26.08.2014
02/EWD/MZN/2014-15 EWD MZN Works of repairing & complete overhauling of established crane no -02 in workshop mzn.

Download

09.08.2014
01/EWD/MZN/2014-15 EWD MZN Works of repairing & complete overhauling of established crane no -01 in workshop mzn.

Download

09.08.2014
T-39/2014-15 EDD-I MBD Bill distribution work in rural area of edsd majhola.

Download

28.08.2014
T-38/2014-15 EDD-I MBD Bill distribution work in urban area of edsd majhola.

Download

28.08.2014
08/2014-15 EDD BIJNOR Printing & supply of commercial letters/register & other letters.

Download

08.08.2014
08/eutd/2014-15 EUTD NOIDA Req. of diesel vehicle.

Download

20.08.2014
07/eutd/2014-15 EUTD NOIDA Meter replacement work.

Download

20.08.2014
22/2014-15 EUDD-III NOIDA Maintenance of line & operational work of sub station sec-18 new & old, sec-19, sec-44, sec-124 & sec-126 noida.

Download

04.08.2014
21/2014-15 EUDD-III NOIDA Maintenance of line & operational work of sub station sec-16a new & old, sec-1, sec-06 new & old, sec-142 & sec- 16 noida.

Download

04.08.2014
04/2014-15 EDC MZN Works of capacity increment of sub station tisang.

Download

04.08.2014
03/2014-15 EDC MZN Works of capacity increment of sub station budeena kalan.

Download

03.09.2014
02/2014-15 EDC MZN Works of capacity increment of sub station pamnawali.

Download

04.08.2014
27/EWC/ MRT/W/2014-15 EWC MRT Purification of dirty transformer oil.

Download

05.08.2014
T-11/2014-15 EDD-I BSR Repairing of 33kv & 11kv line wire of various gram.

Download

04.08.2014
T-10/2014-15 EDD-I BSR Loading of 5mva transformer.

Download

04.08.2014
T-31/2014-15 EDD-II BSR Supply of various items.

Download

20.08.2014
T-30/2014-15 EDD-II BSR Replacement of wiring/relay, damaged spare parts & repairing of OCB/VCB.

Download

12.08.2014
T-29/2014-15 EDD-II BSR Construction of line & establishment of transformer in gram vahlimpura & akbarpur.

Download

12.08.2014
15/W/2014-15 EUDD-II MZN Disconnection of mss shamli sugar purkaji, release & replacement of damaged wire, break pole & release 10kwattcommercial connection.

Download

05.08.2014
11/2014-15 EDC SAMBHAL Supply of LT bushing rod.

Download

26.08.2014
10/2014-15 EDC SAMBHAL Works of MRI based billing of div. chandosi.

Download

26.08.2014
09/2014-15 EDC SAMBHAL Works of MRI based billing of div. sambhal.

Download

26.08.2014
04/2014-15 ETD SAMBHAL Supply of ceiling certificate books.

Download

06.08.2014
29/2014-15 ECDD MRT Construction of SDO building & other civil works at sub station sadhana town.

Download

27.08.2014
28/2014-15 ECDD MRT Construction of test workshop building & related civil works of sub station pallavpuram phase-ii.

Download

27.08.2014
27/2014-15 ECDD MRT Civil construction work for security of sub station store centre baghpat.

Download

27.08.2014
26/2014-15 ECDD MRT Repairing of boundrywall, guard room & shed at store centre partapur mrt.

Download

27.08.2014
14/W/2014-15 EUDD-II MZN Supply of 33 KV Pipe type copper jaw-blade, fuse wire, fire system etc for maintenance of substation/Line.

Download

30.07.2014
13/W/2014-15 EUDD-II MZN Supply of Protection Board, Silica Gel, HT Tape, Ampere Tape, Ampere Meter, Fuse set clamps, Aluminum Bus Bar, Fire Buckets etc for maintenance of substation/Line.

Download

30.07.2014
12/W/2014-15 EUDD-II MZN Work of releasing connection of various load under approved Package/Linkage.

Download

30.07.2014
11/W/2014-15 EUDD-II MZN Work of providing computer operator.

Download

30.07.2014
02/ETDH/2014-15 ETD HAPUR Work of providing Diesel Vehicle with Driver.

Download

14.08.2014
53/eddkhatoli/14-15 EDD KHATOLI Works of transformer body & nutral of water level earthling.

Download

28.07.2014
T-33/2014-15 EDD-I MBD Shifting of line & poles.

Download

01.08.2014
30/W/2014-15 EUDD-I MRT Works of transformer body & nutral of water level earthling.

Download

02.08.2014
29/W/2014-15 EUDD-I MRT Maintenance of sub station PL Sharma Dist. hospital & his feeder.

Download

02.08.2014
28/W/2014-15 EUDD-I MRT Maintenance of sub station sharda road & his feeder.

Download

02.08.2014
27/W/2014-15 EUDD-I MRT Maintenance of sub station town hall TP nagar & his feeder.

Download

02.08.2014
26/W/2014-15 EUDD-I MRT Maintenance of sub station ladies park, mohanpuri & his feeder.

Download

02.08.2014
T-08/2014-15 EDD-I BSR Electrification work.

Download

30.07.2014
T-07/2014-15 EDD-I BSR Construction of line.

Download

30.07.2014
18/2014-15 EDD CHANDOSI Works of electricity bill distribution in rural area of sub div-gunnor.

Download

31.07.2014

17/2014-15 EDD CHANDOSI Works of electricity bill distribution in rural area of sub div-ii chandosi.

Download

31.07.2014

16/2014-15 EDD CHANDOSI Electrification & line repairing of govt tubel.

Download

30.08.2014

15/2014-15 EDD CHANDOSI Construction of 400kva sub station.

Download

31.07.2014

WT-16/2014-15 EUDD-I GZB Works of painting of account no& meter no at consumers residence gate of sub div office bsr road.

Download

02.08.2014
WT-15/2014-15 EUDD-I GZB Works of painting of account no& meter no at consumers residence gate of sub div office raj nagar

Download

02.08.2014
WT-14/2014-15 EUDD-I GZB Req. of computer operator.

Download

31.07.2014
WT-13/2014-15 EUDD-I GZB Req. & establishment of submersible.

Download

31.07.2014
WT-05/2014-15 EUDD-I GZB Works of centrifuging & oil leakage of transformer.

Download

31.07.2014
21/2014-15 ECDD MBD Supply of GI wire.

Download

19.08.2014
44/eddkhatoli/14-15 EDD KHATOLI Works of VCB & panel repairing at sub station budana(rural).

Download

05.08.2014
43/eddkhatoli/14-15 EDD KHATOLI Works of VCB & panel repairing at sub station habeebpur.

Download

05.08.2014
42/eddkhatoli/14-15 EDD KHATOLI Works of VCB & panel repairing at sub station sahpur.

Download

05.08.2014
41/eddkhatoli/14-15 EDD KHATOLI Works of VCB & panel repairing at sub station kurawa..

Download

05.08.2014
40/eddkhatoli/14-15 EDD KHATOLI Works of VCB & panel repairing at sub station kurthal.

Download

05.08.2014
39/eddkhatoli/14-15 EDD KHATOLI Works of VCB & panel repairing at sub station sikandarpur.

Download

05.08.2014
38/eddkhatoli/14-15 EDD KHATOLI Works of VCB & panel repairing at sub station toda kalyanpur.

Download

05.08.2014
37/eddkhatoli/14-15 EDD KHATOLI Works of VCB & panel repairing at sub station khanpur.

Download

05.08.2014
36/eddkhatoli/14-15 EDD KHATOLI Works of VCB & panel repairing at sub station midkali.

Download

05.08.2014
T-07/W/2014-15 ECWD SRE Construction of 11kv feeder & 33kv line from sub station sansarpur khidka bhatkawa.

Download

26.08.2014
T-06/W/2014-15 ECWD SRE Diff civil works at sub station sansarpur khidka bhatkawa.

Download

26.08.2014
T-05/W/2014-15 ECWD SRE Repair & rectification of 33kv line.

Download

20.08.2014
T-04/W/2014-15 ECWD SRE Construction of 11kv feeder & 33kv line from sub station shamli-shamla.

Download

20.08.2014
32/2014-15 EUDD-I MZN Release various capacity load industrial connection.

Download

14.08.2014
31/2014-15 EUDD-I MZN Repairing/rectification of line, stp pole straight work

Download

14.08.2014
30/2014-15 EUDD-I MZN Repairing/rectification of line, re-establishment of abc.

Download

14.08.2014
29/2014-15 EUDD-I MZN Repairing/rectification of line, resenging/ pole straight work

Download

14.08.2014
28/2014-15 EUDD-I MZN Repairing/rectification of line, pole straight work & cutting of tree etc.

Download

14.08.2014
27/2014-15 EUDD-I MZN Works of cleaning,

Download

06.09.2014
26/2014-15 EUDD-I MZN Req. of gang for maintenance work of sub station transport nagar.

Download

08.08.2014
25/2014-15 EUDD-I MZN Req. of gang for maintenance work of sub station ghandhi colony , mandi samiti.

Download

08.08.2014
24/2014-15 EUDD-I MZN Req. of gang for maintenance work of sub station jansath road.

Download

08.08.2014
23/2014-15 EUDD-I MZN Req. of gang for maintenance work of sub station pachend road.

Download

08.08.2014
22/2014-15 EUDD-I MZN Req. of SSO(skilled labour) for operational work of sub station transport nagar.

Download

08.08.2014
21/2014-15 EUDD-I MZN Req. of SSO(skilled labour) for operational work of sub station mandi samiti ghandhi colony.

Download

08.08.2014
20/2014-15 EUDD-I MZN Req. of SSO(skilled labour) for operational work of sub station pachenda road, jansath road.

Download

08.08.2014
24/2014-15 ECDD MBD Works of control room building, boundrywall, handpump & other civil works at sub station rudrapur border.

Download

06.08.2014
23/2014-15 ECDD MBD Works of control room building, boundrywall, handpump & other civil works at sub station kadapur.

Download

05.08.2014
22/2014-15 ECDD MBD Works of control room building, boundrywall, handpump & other civil works at sub station umarpur meera.

Download

05.08.2014
T-31/2014-15 EDD-I MBD Req. of material for maintenance of sub station.

Download

31.07.2014
T-30/2014-15 EDD-I MBD Construction of HT/LT line of gram dayora khas milak.

Download

31.07.2014
T-29/2014-15 EDD-I MBD Construction of HT/LT line of gram mumrejpur.

Download

31.07.2014
T-28/2014-15 EDD-I MBD Construction of HT/LT line of gram sahbaajpur.

Download

31.07.2014
06/eutd/2014-15 EUTD NOIDA Supply of various items.

Download

05.08.2014
90/eddkhatoli/14-15 EDD KHATOLI Operational work of sub station jola & kurawa.

Download

26.07.2014
89/eddkhatoli/14-15 EDD KHATOLI Maintenance of sub station jola & kurawa.

Download

26.07.2014
54/eddkhatoli/14-15 EDD KHATOLI Works under sansad & vidhayak scheme of edsd kahtoli/ budana.

Download

28.07.2014
13/2014-15 EDD-II SHAMLI Works of guarding, pole straight, barricading etc of edsd-ii shamli.

Download

30.07.2014
12/2014-15 EDD-II SHAMLI Works of guarding, pole straight, barricading etc of edsd-i shamli.

Download

30.07.2014
11/2014-15 EDD-II SHAMLI Supply & printing of diff type registers/commercial letters.

Download

28.07.2014
05/2014-15 ETD MZN Req. of diesel generator set.

Download

10.09.2014
04/2014-15 ETD MZN Supply of 33kv diff ratio indoor type expose resin cast CT.

Download

05.08.2014
30/W/2014-15 EDC SRE Construction of 33kv incoming VCB, control panel & related work.

Download

24.07.2014
41/2014-15 EUDD-IV GZB Establishment of 400kva transformer.

Download

08.08.2014
39/2014-15 EUDD-IV GZB Capacity increment work.

Download

31.07.2014
38/2014-15 EUDD-IV GZB Establishment of 250kva transformer of block-11 sec-3.

Download

31.07.2014
37/2014-15 EUDD-IV GZB Establishment of 250kva transformer of sanjay colony earthala.

Download

31.07.2014
36/2014-15 EUDD-IV GZB Establishment of 250kva transformer at station sbd & near tripathi building.

Download

31.07.2014
35/2014-15 EUDD-IV GZB Capacity increment work.

Download

31.07.2014
34/2014-15 EUDD-IV GZB Establishment of 250kva transformer.

Download

31.07.2014
33/2014-15 EUDD-IV GZB Replacement of LT line.

Download

31.07.2014
24/2014-15 ECWD MBD Works of 33kv under ground cable at railway crossing of sub station majhawali.

Download

16.08.2014
23/2014-15 ECWD MBD Works of 33kv under ground cable at railway crossing of sub station umarpur khadar.

Download

16.08.2014
22/2014-15 ECWD MBD Construction of 11kv line for sub station rudrapur border.

Download

30.07.2014
21/2014-15 ECWD MBD Construction of sub station rudrapur border & related 33kv line.

Download

30.07.2014
20/2014-15 ECWD MBD Construction of 33kv & 11kv line for sub station kadapur.

Download

30.07.2014
19/2014-15 ECWD MBD Construction of sub station kadapur.

Download

30.07.2014
18/2014-15 ECWD MBD Construction of 11kv line for sub station umarpur meera.

Download

30.07.2014
17/2014-15 ECWD MBD Construction of 33kv line for sub station umarpur meera.

Download

30.07.2014
16/2014-15 ECWD MBD Construction of sub station umarpur meera.

Download

30.07.2014
18/2014-15 EDC AMROHA Shifting of 33kv line.

Download

20.08.2014
17/2014-15 EDC AMROHA Works of writing of details at consumers residence.

Download

20.08.2014
16/2014-15 EDC AMROHA Replacement of transformer.

Download

20.08.2014
01/2014-15 EDD-I SRE Req. of skilled person diary/dispatch etc.

Download

16.08.2014
12/2014-15 ECDD GZB Construction of diff civil works at residence of CE(Dis).

Download

08.08.2014
31/W/2014-15 EDC SRE Construction of 33kv link line from sub station kalsiya.

Download

24.07.2014
14/W/2014-15 EDC SRE Construction of pole, replacement of damaged wire from usand feeder, world bank feeder, jaitpur feeder.

Download

24.07.2014
13/W/2014-15 EDC SRE Construction of pole, replacement of damaged wire from shakumbari feeder, world bank feede.

Download

24.07.2014
49/2014-15 EDD MZN Establishment of new 10mva power transformer.

Download

23.07.2014
T-33-60/2014-15 EDC-II BSR Maintenance of 11kv feeder from various sub station.

Download

30.07.2014
WT-11/2014-15 EUDD-I GZB Works related to transformer water level earthling of sub station raj nagar, rdc, kamla nehru nagar & govind puram.

Download

24.07.2014
WT-10/2014-15 EUDD-I GZB Works related to transformer water level earthling of sdo bsr road.

Download

24.07.2014
WT-09/2014-15 EUDD-I GZB Works related to transformer water level earthling of sub station shastri nagar & chiranjeev vihar..

Download

24.07.2014
18/2014-15 ECWD GZB Construction of 33kv line.

Download

02.08.2014
17/2014-15 ECWD GZB Construction of 11kv link feeder for sub station kota harnathpur.

Download

20.08.2014
16/2014-15 ECWD GZB Construction of sub station kota harnathpur.

Download

20.08.2014
16/2014-15 EUDD-VIII GZB

Req. of 7.5 kva diesel generator with operator.

Download

31.07.2014
15/2014-15 EUDD-VIII GZB

Works of billing MRI and temporarily connection.

Download

31.07.2014
14/2014-15 EUDD-VIII GZB

Req. of 10kva diesel generator with operator.

Download

31.07.2014
45/2014-15 EDD MZN Maintenance of rural feeder from sub station mimlana road mzn.

Download

11.08.2014
44/2014-15 EDD MZN Maintenance of rural feeder from sub station 30 no. shamli road mzn.

Download

11.08.2014
43/2014-15 EDD MZN Maintenance of 11kv feeder from sub station sajhank.

Download

11.08.2014
42/2014-15 EDD MZN Maintenance of 11kv feeder from sub station kutba.

Download

11.08.2014
41/2014-15 EDD MZN Maintenance of 11kv feeder from sub station baghara.

Download

11.08.2014
40/2014-15 EDD MZN Maintenance of 11kv feeder from sub station bijopura.

Download

11.08.2014
39/2014-15 EDD MZN Maintenance of 11kv feeder from sub station rohana.

Download

11.08.2014
38/2014-15 EDD MZN Maintenance of 11kv feeder from sub station charthawal.

Download

11.08.2014
T-28/2014-15 EDD-II BSR Transportation of transformer.

Download

04.08.2014
T-27/2014-15 EDD-II BSR Supply of clamp & replacement of ABC.

Download

04.08.2014
T-26/2014-15 EDD-II BSR Supply of clamp & replacement of ABC.

Download

04.08.2014
25/2014-15 ECDD MRT Control room building & other civil works at sub station kota harnathpur dist hapur.

Download

20.08.2014
24/2014-15 ECDD MRT Control room building & other civil works at sub station khod dayalpur dist mrt.

Download

20.08.2014
18/2014-15 ECDD GZB Supply of GI wire.

Download

18.08.2014
17/2014-15 ECDD GZB Supply of OPC cement bags.

Download

18.08.2014
16/2014-15 ECDD GZB Construction of control room building, boundary wall, security wall, approach road & other civil works.

Download

18.08.2014
15/2014-15 ECDD GZB Works of computer operation, letter writing etc.

Download

08.08.2014
14/2014-15 ECDD GZB Req. of diesel vehicle with driver.

Download

08.08.2014
13/2014-15 ECDD GZB Construction of link road & drains.

Download

08.08.2014
11/2014-15 ECDD GZB Construction of height of link road & other civil works.

Download

08.08.2014
10/2014-15 ECDD GZB Construction of link road.

Download

08.08.2014
09/2014-15 ECDD GZB Civil works of billing centre at edd modi nagar dist gzb.

Download

04.08.2014
31/2014-15 EDD DHAMPUR Electrification work in gram auranagshapur, vajeerpur bhagwan, nagli ladan etc.

Download

26.07.2014
30/2014-15 EDD DHAMPUR Electrification work in gram palki aman, ehatmali, ajampur, umarpur asha & jamal.

Download

26.07.2014
29/2014-15 EDD DHAMPUR Electrification work in gram sakarthal sani.

Download

26.07.2014
28/2014-15 EDD DHAMPUR Electrification work in gram palanpur, mithepur & safiyabad.

Download

26.07.2014
27/2014-15 EDD DHAMPUR Electrification work in gram doltabad & jyotihimma.

Download

26.07.2014
26/2014-15 EDD DHAMPUR Electrification work in gram bair kheda tanda & umarpur khadar.

Download

26.07.2014
20/W/2014-15 EUDD-V GZB Establishment of double pole & transformer.

Download

08.08.2014
19/W/2014-15 EUDD-V GZB Release connection with establishment of double pole & transformer.

Download

08.08.2014
18/W/2014-15 EUDD-V GZB Repairing/replacement of ST/PCC pole & line.

Download

08.08.2014
17/W/2014-15 EUDD-V GZB Construction of 250kva sub stations with HT & LT lines.

Download

08.08.2014
PVVNL-MT/19 /2014-15 Material Management Supply of 12500 Km ACSR Weasel Conductor.

Download

19.08.2014
T-06/2014-15 ETD RAMPUR Supply of meter ceiling books/other registers.

Download

22.07.2014
37/2014-15 EDD MZN Maintenance of 11kv feeder from sub station sukrataal.

Download

11.08.2014
36/2014-15 EDD MZN Maintenance of 11kv feeder from sub station nairana.

Download

11.08.2014
35/2014-15 EDD MZN Maintenance of 11kv feeder from sub station bhokarhedi.

Download

11.08.2014
34/2014-15 EDD MZN Maintenance of 11kv feeder from sub station bhopa.

Download

11.08.2014
33/2014-15 EDD MZN Maintenance of 11kv feeder from sub station makhiyalai.

Download

11.08.2014
32/2014-15 EDD MZN Maintenance of 11kv feeder from sub station pura.

Download

11.08.2014
31/2014-15 EDD MZN Maintenance of 11kv feeder from sub station nirmana.

Download

11.08.2014
30/2014-15 EDD MZN Maintenance of 11kv feeder from sub station begrajpur.

Download

11.08.2014
29/2014-15 EDD MZN Operational work of sub station bhokarhedi.

Download

11.08.2014
PVVNL-MT/17(S) /2014-15 Material Management

Supply of 200 MT GI Stay Wire (7/3.15 MM) 7/10.

Download

01.08.2014
PVVNL-MT/16(S) /2014-15 Material Management

Work of Meter Reading and Hand Held Billing etc.

Download

02.09.2014
28/2014-15 EDD MZN Operational work of sub station nirmana.

Download

11.08.2014
27/2014-15 EDD MZN Operational work of sub station begrajpur.

Download

11.08.2014
T-32/2014-15 EDC-II BSR Construction of 11kv feeder from sub station naya baas.

Download

30.07.2014
T-31/2014-15 EDC-II BSR Construction of 11kv feeder from sub station sirora.

Download

30.07.2014
T-30/2014-15 EDC-II BSR Construction of 11kv feeder from sub station jinai.

Download

30.07.2014
T-29/2014-15 EDC-II BSR Construction of 33kv line from sub station syana to dolatpur.

Download

30.07.2014
WT-18/2014-15 EUDD-I GZB Req. of diesel 7.5 kva generator.

Download

12.08.2014
WT-17/2014-15 EUDD-I GZB Req. of diesel 15 kva generator.

Download

12.08.2014
WT-12/2014-15 EUDD-I GZB Establishment of metering cubicals & electrification, load increment at 11kv & LT line in sub div office rajnagar gzb.

Download

31.07.2014
23/2014-15 ECDD MRT Control room building & other civil works at sub station rohta road mrt.

Download

12.08.2014
22/2014-15 ECDD MRT Control room building & other civil works at sub station nagli bheekhu dist mrt.

Download

12.08.2014
23/EDDH/2014-15 EDD HAPUR Repairing/overhauling of OCB.

Download

23.07.2014
22/EDDH/2014-15 EDD HAPUR Repairing/overhauling of VCB.

Download

23.07.2014
21/EDDH/2014-15 EDD HAPUR Diff transacted work in improve system scheme.

Download

23.07.2014
20/EDDH/2014-15 EDD HAPUR Diff transacted work under vidhayak scheme.

Download

23.07.2014
19/EDDH/2014-15 EDD HAPUR Replacement & filling of XLPE cable jointing kit.

Download

23.07.2014
23/2014-15 EDC BIJNOR Works of transfer of electric line.

Download

18.07.2014
19/2014-15 EDC BIJNOR Reconnection & disconnections work of defaulter consumer of sub div-chandpur.

Download

22.07.2014
18/2014-15 EDC BIJNOR Reconnection & disconnections work of defaulter consumer of sub div-syohara.

Download

22.07.2014
17/2014-15 EDC BIJNOR Capacity increment work of sub station sofatpur.

Download

22.07.2014
16/2014-15 EDC BIJNOR Bill distribution of sub div-kiratpur.

Download

22.07.2014
15/2014-15 EDC BIJNOR Bill distribution of sub div-ii.

Download

22.07.2014
14/2014-15 EDC BIJNOR Bill distribution of sub div-i.

Download

22.07.2014
37/2014-15 EDD-I SHAMLI Repairing of line.

Download

22.07.2014
PVVNL-MT/14(S) /2014-15 Material Management

Supply of different type &size of 5880 nos. Heat shrinkable 11 KV & 33 KV Cable Jointing/Termination Kits

Download

24.07.2014
12/EDDG/2014-15 EDD GARH Supply of diff material for maintenance of line & operational work of sub station.

Download

17.07.2014
11/EDDG/2014-15 EDD GARH Diff transacted work under deposit scheme & improve system.

Download

17.07.2014
04/W/2014-15 ETD SRE Req. of skilled & unskilled labour for division & workshop iii & iv sre.

Download

19.07.2014
52/eddkhatoli/14-15 EDD KHATOLI Filling of cable box & replacement of new XLPE cable in sub station sikandarapur.

Download

28.07.2014
48/eddkhatoli/14-15 EDD KHATOLI Repairing of 11kv goyla , inchoda feeder & incoming/ outgoing VCB at sub station goyla.

Download

15.07.2014
47/eddkhatoli/14-15 EDD KHATOLI Repairing of feeder & incoming & outgoing VCB at sub station goyla.

Download

15.07.2014
06/2014-15 EDD-III SHAMLI Maintenance of feeder of sub station butradi.

Download

17.07.2014
05/2014-15 EDD-III SHAMLI Operational work of sub station butradi.

Download

17.07.2014
26/2014-15 EDD MZN Printing of registers.

Download

22.07.2014
25/2014-15 EDD MZN Transportation & establishment of new VCB in place of damaged OCB.

Download

16.07.2014
24/2014-15 EDD MZN Construction of line & double pole.

Download

16.07.2014
23/2014-15 EDD MZN Repairing of damaged VCBat sub station rohana.

Download

16.07.2014
22/2014-15 EDD MZN Works of moving of 11kv vahlana feeder line.

Download

16.07.2014
21/2014-15 EDD MZN Guarding of HT/LT line & replacement of damgaed wire & bericading of transformer of sub div-iv mzn.

Download

16.07.2014
20/2014-15 EDD MZN Guarding of HT/LT line & replacement of damgaed wire & bericading of transformer of sub div-i mzn.

Download

16.07.2014
19/2014-15 EDD MZN Repairing of incoming/outgoing VCB at sub station sajhank

Download

15.07.2014
08/W/2014-15 EUDD-II MZN Repairing with material requirement of incoming & outgoing VCB at sub station barla.

Download

15.07.2014
07/W/2014-15 EUDD-II MZN Transportation & loading of line material.

Download

15.07.2014
06/W/2014-15 EUDD-II MZN Replacement of damaged wire, sanging of loose line, barricading of transformer of sub div jansath.

Download

15.07.2014
05/W/2014-15 EUDD-II MZN Replacement of damaged wire, sanging of loose line, barricading of transformer of sub div purkaji.

Download

15.07.2014
02/W/2014-15 EDD NAKUR Electrification & establishment of transformer in gram hazipur.

Download

02.08.2014
03/2014-15 EDD JHAGIRABAD Works related to break pole, cross arms & loose wire.

Download

30.07.2014
05/2014-15 EUDD-II MBD Works of loading, unloading & carriage of medium size diff transformer.

Download

07.08.2014
T-24/2014-15 EDD-I MBD Works of photocopy of letters.

Download

22.07.2014
T-23/2014-15 EDD-I MBD Req. of diesel generator set with operator.

Download

22.07.2014
T-22/2014-15 EDD-I MBD Construction of HT/LT line of gram sherpur mafi.

Download

22.07.2014
T-21/2014-15 EDD-I MBD Construction of HT/LT line of gram khabri avval.

Download

22.07.2014
29/W/2014-15 EDC SRE Maintenance of 11kv feeder from sub station tansipur.

Download

11.07.2014
28/W/2014-15 EDC SRE Maintenance of 11kv feeder from sub station nagal.

Download

11.07.2014
27/W/2014-15 EDC SRE Maintenance of 11kv feeder from sub station deoband tehsil, bhatol & chandena koli.

Download

11.07.2014
26/W/2014-15 EDC SRE Operational work of deoband tehsil.

Download

11.07.2014
09/2014-15 EDD-III SHAMLI Repairing of damaged line, sanging of loose wire, pole, barricading of transformer etc.

Download

10.07.2014
04/2014-15 EUDD-I MBD Works of repairing/maintenance of 05mva transformer.

Download

22.08.2014
24/W/2014-15 EDC SRE Maintenance of 11kv feeder from sub station nakur tehsil.

Download

14.07.2014
23/W/2014-15 EDC SRE Operational work of sub station nakur tehsil.

Download

14.07.2014
22/W/2014-15 EDC SRE Maintenance of 11kv feeder from sub station rampur maniharan tahseel, jadoda panda & chora.

Download

14.07.2014
21/W/2014-15 EDC SRE Maintenance of 11kv feeder from sub station pahasu, jaankheda & mirjapur.

Download

14.07.2014
20/W/2014-15 EDC SRE Operational work sub station rampur maniharan & chora.

Download

11.07.2014
19/W/2014-15 EDC SRE Maintenance of 11kv feeder from sub station jainbagh, khurampur & gatheda.

Download

11.07.2014
18/W/2014-15 EDC SRE Maintenance of 11kv feeder from sub station biharigarh, sarkari sekh & mathana.

Download

11.07.2014
17/W/2014-15 EDC SRE Maintenance work 11kv feeder of sub station behat & kasimpur.

Download

11.07.2014
16/W/2014-15 EDC SRE Operational work of sub station behat & kasimpur.

Download

11.07.2014
17/2014-15 EDD CHANDPUR Laying of 33kv underground cable.

Download

08.07.2014
16/2014-15 EDD CHANDPUR Works against package no 2013-14-[153,216,364,320,319,340], 2012-13-[445] and     2011-12-[552].

Download

08.07.2014
15/2014-15 EDD CHANDPUR Electrification and related work in gram meerapur khadar & sela.

Download

08.07.2014
14/2014-15 EDD CHANDPUR Electrification and related work in gram mithan & chajjupura.

Download

08.07.2014
10/2014-15 EDD-II SHAMLI Maintenance of 11kv feeder through gang from sub station(Devi Mandir) kairana town.

Download

10.07.2014
17/W/EUDD/VII/14-15 EUDD-VII GZB Req. of computer operator.

Download

23.07.2014
16/W/EUDD/VII/14-15 EUDD-VII GZB Maintenance of transformer, HT/LT of 11kv feeder from sub station ator.

Download

23.07.2014
15/W/EUDD/VII/14-15 EUDD-VII GZB Maintenance of transformer, HT/LT of 11kv feeder from sub station nandgram.

Download

23.07.2014
14/W/EUDD/VII/14-15 EUDD-VII GZB Maintenance of transformer, HT/LT of 11kv feeder from sub station meerut road.

Download

23.07.2014
13/W/EUDD/VII/14-15 EUDD-VII GZB Maintenance of transformer, HT/LT of 11kv feeder from sub station patel nagar-ii.

Download

23.07.2014
12/W/EUDD/VII/14-15 EUDD-VII GZB Maintenance of transformer, HT/LT of 11kv feeder from sub station patel nagar-ist.

Download

23.07.2014
11/W/EUDD/VII/14-15 EUDD-VII GZB Operational work of sub station nandgram & ator.

Download

23.07.2014
36/2014-15 EDD-I SHAMLI Works of transformer capacity increment.

Download

11.07.2014
35/2014-15 EDD-I SHAMLI Operational work of sub station titoli.

Download

11.07.2014
34/2014-15 EDD-I SHAMLI Maintenance of 11kv feeder from sub station simbhalaka.

Download

11.07.2014
13/2014-15 EDC BIJNOR Loading of damaged DT transformer of div chandpur.

Download

07.07.2014
12/2014-15 EDC BIJNOR Release 1000kva electric connection.

Download

07.07.2014
11/2014-15 EDC BIJNOR Transfer of electric line.

Download

07.07.2014
10/2014-15 EDC BIJNOR Loading of damaged DT transformer of div najeebabad.

Download

07.07.2014
09/2014-15 EDC BIJNOR Works of water level earthling, wiremess fencing, plinth of transformer.

Download

07.07.2014
08/2014-15 EDC BIJNOR Loading of damaged DT transformer of div bijnor.

Download

07.07.2014
T-25/2014-15 EDD-II BSR Replacement of OCB/VCB wiring & relay.

Download

25.07.2014
T-24/2014-15 EDD-II BSR Release various capacity connection.

Download

25.07.2014
T-23/2014-15 EDD-II BSR Supply of clamp box etc & laying of new abc cable.

Download

25.07.2014
T-22/2014-15 EDD-II BSR Replacement of damaged ABC, brackit & clamp.

Download

18.07.2014
T-21/2014-15 EDD-II BSR

Replacement of 11kv & LT line of sub station no-4 & neemkheda.

Download

18.07.2014
T-20/2014-15 EDD-II BSR Replacement of damaged ABC, brackit.

Download

14.07.2014
T-19/2014-15 EDD-II BSR Replacement of damaged ABC, brackit & clamp.

Download

14.07.2014
03/W/2014-15 ECWD SRE Supply of LT pvc control cable.

Download

08.07.2014
10/EDDG/2014-15 EDD GARH Operational work of sub station garhmiktswar-2(urban).

Download

09.07.2014
09/EDDG/2014-15 EDD GARH Maintenance of electric line of sub station garhmiktswar-2(urban).

Download

09.07.2014
19/2014-15 EUDD-I MZN Shifting of transformer,line & poles at ghandhi colony jail phatak.

Download

16.08.2014
18/2014-15 EUDD-I MZN Shifting of transformer,line & poles at reshu vihar sercular road.

Download

16.08.2014
17/2014-15 EUDD-I MZN Repairing/rectification of line and shifting of pole & transformer.

Download

23.07.2014
16/2014-15 EUDD-I MZN Replacement of damaged tower no-37 of 66kv line.

Download

16.08.2014
15/2014-15 EUDD-I MZN Supply of Crimping Lugs made of Aluminum having capacity of size 630 mm2  650 Nos.

Download

23.07.2014
14/2014-15 EUDD-I MZN Supply of Crimping Lugs made of Aluminum having capacity of size 400 mm2 1000 Nos.

Download

23.07.2014
08/2014-15 ECDD GZB Works related to fire hydrent system.

Download

28.07.2014
PVVNL-MT/15(S) /2014-15 Material Management

Conversion of existing overhead LT lines to Underground cable network, Construction of New 11 KV feeders, & installation of new 250 KVA Distribution Transformers for improvement of electric supply & distribution network in Rampur Town.

 

Part-1

Part-2

 

29.09.2014
PVVNL-MT/13(S) /2014-15 Material Management

Supply of 1500 nos. 13 mtr. Steel Tubular Pole, (SP-70).

Download

05.07.2014
01/ETDH/2014-15 ETD HAPUR Repairing of PT & housing.

Download

04.08.2014
08/2014-15 EDC SAMBHAL Req. of gang.

Download

09.07.2014
07/2014-15 EDC SAMBHAL Supply of TGT-2 & SSO.

Download

09.07.2014
21/eddkhatoli/14-15 EDD KHATOLI Protection work of power transformer of sub station goyala.

Download

03.07.2014
20/eddkhatoli/14-15 EDD KHATOLI Construction of plinth for shifting of power transformer of sub station khatoli (rural).

Download

03.07.2014
19/eddkhatoli/14-15 EDD KHATOLI Protection work of power transformer of sub station sikandarpur.

Download

03.07.2014
18/eddkhatoli/14-15 EDD KHATOLI Protection work of power transformer of sub station toda.

Download

03.07.2014
15/2014-15 ECWD GZB Transportation of STP-SP & PCC pole from store bsr & mrt to store hapur.

Download

15.07.2014
26/2014-15 EUDD-IV GZB Load distribution of 11kv industrial feeder.

Download

10.07.2014
25/2014-15 EUDD-IV GZB Moving of DG-ii feeder at sub station arthala.

Download

10.07.2014
24/2014-15 EUDD-IV GZB Jointing of 11kv sahadara feeder-1 & 2.

Download

10.07.2014
23/2014-15 EUDD-IV GZB Jointing of two new feeder from sub station rajendra nagar-ii.

Download

09.07.2014
22/2014-15 EUDD-IV GZB Load distribution of rajendra nagar east feeder.

Download

09.07.2014
21/2014-15 EUDD-IV GZB Load distribution of 11kv kali mandir feeder.

Download

09.07.2014
20/2014-15 EUDD-IV GZB Jointing of two new feeder from sub station rajendra nagar-ii.

Download

09.07.2014
19/2014-15 EUDD-IV GZB Construction of new feeder.

Download

09.07.2014
12/2014-15 EUDD-VI GZB Req. of diff type material.

Download

02.07.2014
11/2014-15 EUDD-VI GZB Construction of composite line.

Download

02.07.2014
10/2014-15 EUDD-VI GZB Construction of shed at billing counter.

Download

02.07.2014