You are at >> Tender & Notices

Search

  Best view in Internet Explorer (IE 6.0 or Later) only

For uploading tenders on this website, please email soft copy of tenders on tender@pvvnl.org

Tender Number Department Name of Material

Tender

Notice

Opening Date
15/W/2014-15 EUDD-II MZN Disconnection of mss shamli sugar purkaji, release & replacement of damaged wire, break pole & release 10kwattcommercial connection.

Download

05.08.2014
11/2014-15 EDC SAMBHAL Supply of LT bushing rod.

Download

26.08.2014
10/2014-15 EDC SAMBHAL Works of MRI based billing of div. chandosi.

Download

26.08.2014
09/2014-15 EDC SAMBHAL Works of MRI based billing of div. sambhal.

Download

26.08.2014
04/2014-15 ETD SAMBHAL Supply of ceiling certificate books.

Download

06.08.2014
29/2014-15 ECDD MRT Construction of SDO building & other civil works at sub station sadhana town.

Download

27.08.2014
28/2014-15 ECDD MRT Construction of test workshop building & related civil works of sub station pallavpuram phase-ii.

Download

27.08.2014
27/2014-15 ECDD MRT Civil construction work for security of sub station store centre baghpat.

Download

27.08.2014
26/2014-15 ECDD MRT Repairing of boundrywall, guard room & shed at store centre partapur mrt.

Download

27.08.2014
14/W/2014-15 EUDD-II MZN Supply of 33 KV Pipe type copper jaw-blade, fuse wire, fire system etc for maintenance of substation/Line.

Download

30.07.2014
13/W/2014-15 EUDD-II MZN Supply of Protection Board, Silica Gel, HT Tape, Ampere Tape, Ampere Meter, Fuse set clamps, Aluminum Bus Bar, Fire Buckets etc for maintenance of substation/Line.

Download

30.07.2014
12/W/2014-15 EUDD-II MZN Work of releasing connection of various load under approved Package/Linkage.

Download

30.07.2014
11/W/2014-15 EUDD-II MZN Work of providing computer operator.

Download

30.07.2014
40/W/2014-15 EDD MAWANA Maintenance of 11kv feeder from sub station hastinapur road mawana.

Download

28.07.2014
02/ETDH/2014-15 ETD HAPUR Work of providing Diesel Vehicle with Driver.

Download

14.08.2014
53/eddkhatoli/14-15 EDD KHATOLI Works of transformer body & nutral of water level earthling.

Download

28.07.2014
T-33/2014-15 EDD-I MBD Shifting of line & poles.

Download

01.08.2014
30/W/2014-15 EUDD-I MRT Works of transformer body & nutral of water level earthling.

Download

02.08.2014
29/W/2014-15 EUDD-I MRT Maintenance of sub station PL Sharma Dist. hospital & his feeder.

Download

02.08.2014
28/W/2014-15 EUDD-I MRT Maintenance of sub station sharda road & his feeder.

Download

02.08.2014
27/W/2014-15 EUDD-I MRT Maintenance of sub station town hall TP nagar & his feeder.

Download

02.08.2014
26/W/2014-15 EUDD-I MRT Maintenance of sub station ladies park, mohanpuri & his feeder.

Download

02.08.2014
T-08/2014-15 EDD-I BSR Electrification work.

Download

30.07.2014
T-07/2014-15 EDD-I BSR Construction of line.

Download

30.07.2014
18/2014-15 EDD CHANDOSI Works of electricity bill distribution in rural area of sub div-gunnor.

Download

31.07.2014

17/2014-15 EDD CHANDOSI Works of electricity bill distribution in rural area of sub div-ii chandosi.

Download

31.07.2014

16/2014-15 EDD CHANDOSI Electrification & line repairing of govt tubel.

Download

31.07.2014

15/2014-15 EDD CHANDOSI Construction of 400kva sub station.

Download

31.07.2014

WT-16/2014-15 EUDD-I GZB Works of painting of account no& meter no at consumers residence gate of sub div office bsr road.

Download

02.08.2014
WT-15/2014-15 EUDD-I GZB Works of painting of account no& meter no at consumers residence gate of sub div office raj nagar

Download

02.08.2014
WT-14/2014-15 EUDD-I GZB Req. of computer operator.

Download

31.07.2014
WT-13/2014-15 EUDD-I GZB Req. & establishment of submersible.

Download

31.07.2014
WT-05/2014-15 EUDD-I GZB Works of centrifuging & oil leakage of transformer.

Download

31.07.2014
21/2014-15 ECDD MBD Supply of GI wire.

Download

19.08.2014
44/eddkhatoli/14-15 EDD KHATOLI Works of VCB & panel repairing at sub station budana(rural).

Download

05.08.2014
43/eddkhatoli/14-15 EDD KHATOLI Works of VCB & panel repairing at sub station habeebpur.

Download

05.08.2014
42/eddkhatoli/14-15 EDD KHATOLI Works of VCB & panel repairing at sub station sahpur.

Download

05.08.2014
41/eddkhatoli/14-15 EDD KHATOLI Works of VCB & panel repairing at sub station kurawa..

Download

05.08.2014
40/eddkhatoli/14-15 EDD KHATOLI Works of VCB & panel repairing at sub station kurthal.

Download

05.08.2014
39/eddkhatoli/14-15 EDD KHATOLI Works of VCB & panel repairing at sub station sikandarpur.

Download

05.08.2014
38/eddkhatoli/14-15 EDD KHATOLI Works of VCB & panel repairing at sub station toda kalyanpur.

Download

05.08.2014
37/eddkhatoli/14-15 EDD KHATOLI Works of VCB & panel repairing at sub station khanpur.

Download

05.08.2014
36/eddkhatoli/14-15 EDD KHATOLI Works of VCB & panel repairing at sub station midkali.

Download

05.08.2014
T-07/W/2014-15 ECWD SRE Construction of 11kv feeder & 33kv line from sub station sansarpur khidka bhatkawa.

Download

26.08.2014
T-06/W/2014-15 ECWD SRE Diff civil works at sub station sansarpur khidka bhatkawa.

Download

26.08.2014
T-05/W/2014-15 ECWD SRE Repair & rectification of 33kv line.

Download

20.08.2014
T-04/W/2014-15 ECWD SRE Construction of 11kv feeder & 33kv line from sub station shamli-shamla.

Download

20.08.2014
32/2014-15 EUDD-I MZN Release various capacity load industrial connection.

Download

14.08.2014
31/2014-15 EUDD-I MZN Repairing/rectification of line, stp pole straight work

Download

14.08.2014
30/2014-15 EUDD-I MZN Repairing/rectification of line, re-establishment of abc.

Download

14.08.2014
29/2014-15 EUDD-I MZN Repairing/rectification of line, resenging/ pole straight work

Download

14.08.2014
28/2014-15 EUDD-I MZN Repairing/rectification of line, pole straight work & cutting of tree etc.

Download

14.08.2014
27/2014-15 EUDD-I MZN Works of cleaning,

Download

14.08.2014
26/2014-15 EUDD-I MZN Req. of gang for maintenance work of sub station transport nagar.

Download

08.08.2014
25/2014-15 EUDD-I MZN Req. of gang for maintenance work of sub station ghandhi colony , mandi samiti.

Download

08.08.2014
24/2014-15 EUDD-I MZN Req. of gang for maintenance work of sub station jansath road.

Download

08.08.2014
23/2014-15 EUDD-I MZN Req. of gang for maintenance work of sub station pachend road.

Download

08.08.2014
22/2014-15 EUDD-I MZN Req. of SSO(skilled labour) for operational work of sub station transport nagar.

Download

08.08.2014
21/2014-15 EUDD-I MZN Req. of SSO(skilled labour) for operational work of sub station mandi samiti ghandhi colony.

Download

08.08.2014
20/2014-15 EUDD-I MZN Req. of SSO(skilled labour) for operational work of sub station pachenda road, jansath road.

Download

08.08.2014
24/2014-15 ECDD MBD Works of control room building, boundrywall, handpump & other civil works at sub station rudrapur border.

Download

06.08.2014
23/2014-15 ECDD MBD Works of control room building, boundrywall, handpump & other civil works at sub station kadapur.

Download

05.08.2014
22/2014-15 ECDD MBD Works of control room building, boundrywall, handpump & other civil works at sub station umarpur meera.

Download

05.08.2014
T-31/2014-15 EDD-I MBD Req. of material for maintenance of sub station.

Download

31.07.2014
T-30/2014-15 EDD-I MBD Construction of HT/LT line of gram dayora khas milak.

Download

31.07.2014
T-29/2014-15 EDD-I MBD Construction of HT/LT line of gram mumrejpur.

Download

31.07.2014
T-28/2014-15 EDD-I MBD Construction of HT/LT line of gram sahbaajpur.

Download

31.07.2014
06/eutd/2014-15 EUTD NOIDA Supply of various items.

Download

05.08.2014
90/eddkhatoli/14-15 EDD KHATOLI Operational work of sub station jola & kurawa.

Download

26.07.2014
89/eddkhatoli/14-15 EDD KHATOLI Maintenance of sub station jola & kurawa.

Download

26.07.2014
54/eddkhatoli/14-15 EDD KHATOLI Works under sansad & vidhayak scheme of edsd kahtoli/ budana.

Download

28.07.2014
13/2014-15 EDD-II SHAMLI Works of guarding, pole straight, barricading etc of edsd-ii shamli.

Download

30.07.2014
12/2014-15 EDD-II SHAMLI Works of guarding, pole straight, barricading etc of edsd-i shamli.

Download

30.07.2014
11/2014-15 EDD-II SHAMLI Supply & printing of diff type registers/commercial letters.

Download

28.07.2014
05/2014-15 ETD MZN Req. of diesel generator set.

Download

05.08.2014
04/2014-15 ETD MZN Supply of 33kv diff ratio indoor type expose resin cast CT.

Download

05.08.2014
30/W/2014-15 EDC SRE Construction of 33kv incoming VCB, control panel & related work.

Download

24.07.2014
41/2014-15 EUDD-IV GZB Establishment of 400kva transformer.

Download

08.08.2014
39/2014-15 EUDD-IV GZB Capacity increment work.

Download

31.07.2014
38/2014-15 EUDD-IV GZB Establishment of 250kva transformer of block-11 sec-3.

Download

31.07.2014
37/2014-15 EUDD-IV GZB Establishment of 250kva transformer of sanjay colony earthala.

Download

31.07.2014
36/2014-15 EUDD-IV GZB Establishment of 250kva transformer at station sbd & near tripathi building.

Download

31.07.2014
35/2014-15 EUDD-IV GZB Capacity increment work.

Download

31.07.2014
34/2014-15 EUDD-IV GZB Establishment of 250kva transformer.

Download

31.07.2014
33/2014-15 EUDD-IV GZB Replacement of LT line.

Download

31.07.2014
24/2014-15 ECWD MBD Works of 33kv under ground cable at railway crossing of sub station majhawali.

Download

16.08.2014
23/2014-15 ECWD MBD Works of 33kv under ground cable at railway crossing of sub station umarpur khadar.

Download

16.08.2014
22/2014-15 ECWD MBD Construction of 11kv line for sub station rudrapur border.

Download

30.07.2014
21/2014-15 ECWD MBD Construction of sub station rudrapur border & related 33kv line.

Download

30.07.2014
20/2014-15 ECWD MBD Construction of 33kv & 11kv line for sub station kadapur.

Download

30.07.2014
19/2014-15 ECWD MBD Construction of sub station kadapur.

Download

30.07.2014
18/2014-15 ECWD MBD Construction of 11kv line for sub station umarpur meera.

Download

30.07.2014
17/2014-15 ECWD MBD Construction of 33kv line for sub station umarpur meera.

Download

30.07.2014
16/2014-15 ECWD MBD Construction of sub station umarpur meera.

Download

30.07.2014
18/2014-15 EDC AMROHA Shifting of 33kv line.

Download

20.08.2014
17/2014-15 EDC AMROHA Works of writing of details at consumers residence.

Download

20.08.2014
16/2014-15 EDC AMROHA Replacement of transformer.

Download

20.08.2014
01/2014-15 EDD-I SRE Req. of skilled person diary/dispatch etc.

Download

16.08.2014
12/2014-15 ECDD GZB Construction of diff civil works at residence of CE(Dis).

Download

08.08.2014
31/W/2014-15 EDC SRE Construction of 33kv link line from sub station kalsiya.

Download

24.07.2014
14/W/2014-15 EDC SRE Construction of pole, replacement of damaged wire from usand feeder, world bank feeder, jaitpur feeder.

Download

24.07.2014
13/W/2014-15 EDC SRE Construction of pole, replacement of damaged wire from shakumbari feeder, world bank feede.

Download

24.07.2014
49/2014-15 EDD MZN Establishment of new 10mva power transformer.

Download

23.07.2014
07/2014-15 ITD NOIDA Operational work of AC system, DG set & building management system.

Download

31.07.2014
T-33-60/2014-15 EDC-II BSR Maintenance of 11kv feeder from various sub station.

Download

30.07.2014
WT-11/2014-15 EUDD-I GZB Works related to transformer water level earthling of sub station raj nagar, rdc, kamla nehru nagar & govind puram.

Download

24.07.2014
WT-10/2014-15 EUDD-I GZB Works related to transformer water level earthling of sdo bsr road.

Download

24.07.2014
WT-09/2014-15 EUDD-I GZB Works related to transformer water level earthling of sub station shastri nagar & chiranjeev vihar..

Download

24.07.2014
18/2014-15 ECWD GZB Construction of 33kv line.

Download

02.08.2014
17/2014-15 ECWD GZB Construction of 11kv link feeder for sub station kota harnathpur.

Download

20.08.2014
16/2014-15 ECWD GZB Construction of sub station kota harnathpur.

Download

20.08.2014
16/2014-15 EUDD-VIII GZB

Req. of 7.5 kva diesel generator with operator.

Download

31.07.2014
15/2014-15 EUDD-VIII GZB

Works of billing MRI and temporarily connection.

Download

31.07.2014
14/2014-15 EUDD-VIII GZB

Req. of 10kva diesel generator with operator.

Download

31.07.2014
06/2014-15 ITD NOIDA Works of daily cleaning, security & house keeping.

Download

31.07.2014
05/2014-15 ITD NOIDA Works of amc of ac.

Download

31.07.2014
04/2014-15 ITD NOIDA Req. of computer operator.

Download

31.07.2014
03/2014-15 ITD NOIDA Req. of diesel vehicle with driver.

Download

31.07.2014
45/2014-15 EDD MZN Maintenance of rural feeder from sub station mimlana road mzn.

Download

24.07.2014
44/2014-15 EDD MZN Maintenance of rural feeder from sub station 30 no. shamli road mzn.

Download

24.07.2014
43/2014-15 EDD MZN Maintenance of 11kv feeder from sub station sajhank.

Download

24.07.2014
42/2014-15 EDD MZN Maintenance of 11kv feeder from sub station kutba.

Download

24.07.2014
41/2014-15 EDD MZN Maintenance of 11kv feeder from sub station baghara.

Download

24.07.2014
40/2014-15 EDD MZN Maintenance of 11kv feeder from sub station bijopura.

Download

24.07.2014
39/2014-15 EDD MZN Maintenance of 11kv feeder from sub station rohana.

Download

24.07.2014
38/2014-15 EDD MZN Maintenance of 11kv feeder from sub station charthawal.

Download

24.07.2014
T-28/2014-15 EDD-II BSR Transportation of transformer.

Download

04.08.2014
T-27/2014-15 EDD-II BSR Supply of clamp & replacement of ABC.

Download

04.08.2014
T-26/2014-15 EDD-II BSR Supply of clamp & replacement of ABC.

Download

04.08.2014
25/2014-15 ECDD MRT Control room building & other civil works at sub station kota harnathpur dist hapur.

Download

20.08.2014
24/2014-15 ECDD MRT Control room building & other civil works at sub station khod dayalpur dist mrt.

Download

20.08.2014
18/2014-15 ECDD GZB Supply of GI wire.

Download

18.08.2014
17/2014-15 ECDD GZB Supply of OPC cement bags.

Download

18.08.2014
16/2014-15 ECDD GZB Construction of control room building, boundary wall, security wall, approach road & other civil works.

Download

18.08.2014
15/2014-15 ECDD GZB Works of computer operation, letter writing etc.

Download

08.08.2014
14/2014-15 ECDD GZB Req. of diesel vehicle with driver.

Download

08.08.2014
13/2014-15 ECDD GZB Construction of link road & drains.

Download

08.08.2014
11/2014-15 ECDD GZB Construction of height of link road & other civil works.

Download

08.08.2014
10/2014-15 ECDD GZB Construction of link road.

Download

08.08.2014
09/2014-15 ECDD GZB Civil works of billing centre at edd modi nagar dist gzb.

Download

04.08.2014
31/2014-15 EDD DHAMPUR Electrification work in gram auranagshapur, vajeerpur bhagwan, nagli ladan etc.

Download

26.07.2014
30/2014-15 EDD DHAMPUR Electrification work in gram palki aman, ehatmali, ajampur, umarpur asha & jamal.

Download

26.07.2014
29/2014-15 EDD DHAMPUR Electrification work in gram sakarthal sani.

Download

26.07.2014
28/2014-15 EDD DHAMPUR Electrification work in gram palanpur, mithepur & safiyabad.

Download

26.07.2014
27/2014-15 EDD DHAMPUR Electrification work in gram doltabad & jyotihimma.

Download

26.07.2014
26/2014-15 EDD DHAMPUR Electrification work in gram bair kheda tanda & umarpur khadar.

Download

26.07.2014
20/W/2014-15 EUDD-V GZB Establishment of double pole & transformer.

Download

08.08.2014
19/W/2014-15 EUDD-V GZB Release connection with establishment of double pole & transformer.

Download

08.08.2014
18/W/2014-15 EUDD-V GZB Repairing/replacement of ST/PCC pole & line.

Download

08.08.2014
17/W/2014-15 EUDD-V GZB Construction of 250kva sub stations with HT & LT lines.

Download

08.08.2014
PVVNL-MT/19 /2014-15 Material Management Supply of 12500 Km ACSR Weasel Conductor.

Download

18.08.2014
T-06/2014-15 ETD RAMPUR Supply of meter ceiling books/other registers.

Download

22.07.2014
02/eudd-6/2013-14 EUDD-VI NOIDA Repairing of diff capacity damaged transformer.

Download

24.07.2014
01/eudd-6/2013-14 EUDD-VI NOIDA Works of emergency break down attending.

Download

24.07.2014
37/2014-15 EDD MZN Maintenance of 11kv feeder from sub station sukrataal.

Download

23.07.2014
36/2014-15 EDD MZN Maintenance of 11kv feeder from sub station nairana.

Download

23.07.2014
35/2014-15 EDD MZN Maintenance of 11kv feeder from sub station bhokarhedi.

Download

23.07.2014
34/2014-15 EDD MZN Maintenance of 11kv feeder from sub station bhopa.

Download

23.07.2014
33/2014-15 EDD MZN Maintenance of 11kv feeder from sub station makhiyalai.

Download

23.07.2014
32/2014-15 EDD MZN Maintenance of 11kv feeder from sub station pura.

Download

23.07.2014
31/2014-15 EDD MZN Maintenance of 11kv feeder from sub station nirmana.

Download

23.07.2014
30/2014-15 EDD MZN Maintenance of 11kv feeder from sub station begrajpur.

Download

23.07.2014
29/2014-15 EDD MZN Operational work of sub station bhokarhedi.

Download

23.07.2014
PVVNL-MT/17(S) /2014-15 Material Management

Supply of 200 MT GI Stay Wire (7/3.15 MM) 7/10.

Download

01.08.2014
PVVNL-MT/16(S) /2014-15 Material Management

work of Meter Reading and Hand Held Billing etc.

Download

22.07.2014
28/2014-15 EDD MZN Operational work of sub station nirmana.

Download

23.07.2014
27/2014-15 EDD MZN Operational work of sub station begrajpur.

Download

23.07.2014
T-32/2014-15 EDC-II BSR Construction of 11kv feeder from sub station naya baas.

Download

30.07.2014
T-31/2014-15 EDC-II BSR Construction of 11kv feeder from sub station sirora.

Download

30.07.2014
T-30/2014-15 EDC-II BSR Construction of 11kv feeder from sub station jinai.

Download

30.07.2014
T-29/2014-15 EDC-II BSR Construction of 33kv line from sub station syana to dolatpur.

Download

30.07.2014
WT-18/2014-15 EUDD-I GZB Req. of diesel 7.5 kva generator.

Download

12.08.2014
WT-17/2014-15 EUDD-I GZB Req. of diesel 15 kva generator.

Download

12.08.2014
WT-12/2014-15 EUDD-I GZB Establishment of metering cubicals & electrification, load increment at 11kv & LT line in sub div office rajnagar gzb.

Download

31.07.2014
23/2014-15 ECDD MRT Control room building & other civil works at sub station rohta road mrt.

Download

12.08.2014
22/2014-15 ECDD MRT Control room building & other civil works at sub station nagli bheekhu dist mrt.

Download

12.08.2014
23/EDDH/2014-15 EDD HAPUR Repairing/overhauling of OCB.

Download

23.07.2014
22/EDDH/2014-15 EDD HAPUR Repairing/overhauling of VCB.

Download

23.07.2014
21/EDDH/2014-15 EDD HAPUR Diff transacted work in improve system scheme.

Download

23.07.2014
20/EDDH/2014-15 EDD HAPUR Diff transacted work under vidhayak scheme.

Download

23.07.2014
19/EDDH/2014-15 EDD HAPUR Replacement & filling of XLPE cable jointing kit.

Download

23.07.2014
23/2014-15 EDC BIJNOR Works of transfer of electric line.

Download

18.07.2014
19/2014-15 EDC BIJNOR Reconnection & disconnections work of defaulter consumer of sub div-chandpur.

Download

22.07.2014
18/2014-15 EDC BIJNOR Reconnection & disconnections work of defaulter consumer of sub div-syohara.

Download

22.07.2014
17/2014-15 EDC BIJNOR Capacity increment work of sub station sofatpur.

Download

22.07.2014
16/2014-15 EDC BIJNOR Bill distribution of sub div-kiratpur.

Download

22.07.2014
15/2014-15 EDC BIJNOR Bill distribution of sub div-ii.

Download

22.07.2014
14/2014-15 EDC BIJNOR Bill distribution of sub div-i.

Download

22.07.2014
37/2014-15 EDD-I SHAMLI Repairing of line.

Download

22.07.2014
PVVNL-MT/14(S) /2014-15 Material Management

Supply of different type &size of 5880 nos. Heat shrinkable 11 KV & 33 KV Cable Jointing/Termination Kits

Download

24.07.2014
12/EDDG/2014-15 EDD GARH Supply of diff material for maintenance of line & operational work of sub station.

Download

17.07.2014
11/EDDG/2014-15 EDD GARH Diff transacted work under deposit scheme & improve system.

Download

17.07.2014
04/W/2014-15 ETD SRE Req. of skilled & unskilled labour for division & workshop iii & iv sre.

Download

19.07.2014
52/eddkhatoli/14-15 EDD KHATOLI Filling of cable box & replacement of new XLPE cable in sub station sikandarapur.

Download

28.07.2014
48/eddkhatoli/14-15 EDD KHATOLI Repairing of 11kv goyla , inchoda feeder & incoming/ outgoing VCB at sub station goyla.

Download

15.07.2014
47/eddkhatoli/14-15 EDD KHATOLI Repairing of feeder & incoming & outgoing VCB at sub station goyla.

Download

15.07.2014
06/2014-15 EDD-III SHAMLI Maintenance of feeder of sub station butradi.

Download

17.07.2014
05/2014-15 EDD-III SHAMLI Operational work of sub station butradi.

Download

17.07.2014
26/2014-15 EDD MZN Printing of registers.

Download

22.07.2014
25/2014-15 EDD MZN Transportation & establishment of new VCB in place of damaged OCB.

Download

16.07.2014
24/2014-15 EDD MZN Construction of line & double pole.

Download

16.07.2014
23/2014-15 EDD MZN Repairing of damaged VCBat sub station rohana.

Download

16.07.2014
22/2014-15 EDD MZN Works of moving of 11kv vahlana feeder line.

Download

16.07.2014
21/2014-15 EDD MZN Guarding of HT/LT line & replacement of damgaed wire & bericading of transformer of sub div-iv mzn.

Download

16.07.2014
20/2014-15 EDD MZN Guarding of HT/LT line & replacement of damgaed wire & bericading of transformer of sub div-i mzn.

Download

16.07.2014
19/2014-15 EDD MZN Repairing of incoming/outgoing VCB at sub station sajhank

Download

15.07.2014
08/W/2014-15 EUDD-II MZN Repairing with material requirement of incoming & outgoing VCB at sub station barla.

Download

15.07.2014
07/W/2014-15 EUDD-II MZN Transportation & loading of line material.

Download

15.07.2014
06/W/2014-15 EUDD-II MZN Replacement of damaged wire, sanging of loose line, barricading of transformer of sub div jansath.

Download

15.07.2014
05/W/2014-15 EUDD-II MZN Replacement of damaged wire, sanging of loose line, barricading of transformer of sub div purkaji.

Download

15.07.2014
02/W/2014-15 EDD NAKUR Electrification & establishment of transformer in gram hazipur.

Download

02.08.2014
03/2014-15 EDD JHAGIRABAD Works related to break pole, cross arms & loose wire.

Download

30.07.2014
05/2014-15 EUDD-II MBD Works of loading, unloading & carriage of medium size diff transformer.

Download

07.08.2014
T-24/2014-15 EDD-I MBD Works of photocopy of letters.

Download

22.07.2014
T-23/2014-15 EDD-I MBD Req. of diesel generator set with operator.

Download

22.07.2014
T-22/2014-15 EDD-I MBD Construction of HT/LT line of gram sherpur mafi.

Download

22.07.2014
T-21/2014-15 EDD-I MBD Construction of HT/LT line of gram khabri avval.

Download

22.07.2014
29/W/2014-15 EDC SRE Maintenance of 11kv feeder from sub station tansipur.

Download

11.07.2014
28/W/2014-15 EDC SRE Maintenance of 11kv feeder from sub station nagal.

Download

11.07.2014
27/W/2014-15 EDC SRE Maintenance of 11kv feeder from sub station deoband tehsil, bhatol & chandena koli.

Download

11.07.2014
26/W/2014-15 EDC SRE Operational work of deoband tehsil.

Download

11.07.2014
09/2014-15 EDD-III SHAMLI Repairing of damaged line, sanging of loose wire, pole, barricading of transformer etc.

Download

10.07.2014
04/2014-15 EUDD-I MBD Works of repairing/maintenance of 05mva transformer.

Download

06.08.2014
24/W/2014-15 EDC SRE Maintenance of 11kv feeder from sub station nakur tehsil.

Download

14.07.2014
23/W/2014-15 EDC SRE Operational work of sub station nakur tehsil.

Download

14.07.2014
22/W/2014-15 EDC SRE Maintenance of 11kv feeder from sub station rampur maniharan tahseel, jadoda panda & chora.

Download

14.07.2014
21/W/2014-15 EDC SRE Maintenance of 11kv feeder from sub station pahasu, jaankheda & mirjapur.

Download

14.07.2014
20/W/2014-15 EDC SRE Operational work sub station rampur maniharan & chora.

Download

11.07.2014
19/W/2014-15 EDC SRE Maintenance of 11kv feeder from sub station jainbagh, khurampur & gatheda.

Download

11.07.2014
18/W/2014-15 EDC SRE Maintenance of 11kv feeder from sub station biharigarh, sarkari sekh & mathana.

Download

11.07.2014
17/W/2014-15 EDC SRE Maintenance work 11kv feeder of sub station behat & kasimpur.

Download

11.07.2014
16/W/2014-15 EDC SRE Operational work of sub station behat & kasimpur.

Download

11.07.2014
17/2014-15 EDD CHANDPUR Laying of 33kv underground cable.

Download

08.07.2014
16/2014-15 EDD CHANDPUR Works against package no 2013-14-[153,216,364,320,319,340], 2012-13-[445] and     2011-12-[552].

Download

08.07.2014
15/2014-15 EDD CHANDPUR Electrification and related work in gram meerapur khadar & sela.

Download

08.07.2014
14/2014-15 EDD CHANDPUR Electrification and related work in gram mithan & chajjupura.

Download

08.07.2014
26/EWC/ MRT/W/2014-15 EWC MRT Works of transportation of repaired and damaged  160-1000 kva transformer.

Download

11.07.2014
25/EWC/ MRT/W/2014-15 EWC MRT Works of transportation of repaired and damaged  25-100 kva transformer.

Download

11.07.2014
10/2014-15 EDD-II SHAMLI Maintenance of 11kv feeder through gang from sub station(Devi Mandir) kairana town.

Download

10.07.2014
27/W/2014-15 EUDD-V NOIDA Construction of new sub station in C-270/10.

Download

10.07.2014
26/W/2014-15 EUDD-V NOIDA Construction of new sub station in B-93/10.

Download

10.07.2014
25/W/2014-15 EUDD-V NOIDA Construction of new sub station in block G sec-20.

Download

10.07.2014
24/W/2014-15 EUDD-V NOIDA Construction of new sub station in block E sec-20.

Download

10.07.2014
17/W/EUDD/VII/14-15 EUDD-VII GZB Req. of computer operator.

Download

23.07.2014
16/W/EUDD/VII/14-15 EUDD-VII GZB Maintenance of transformer, HT/LT of 11kv feeder from sub station ator.

Download

23.07.2014
15/W/EUDD/VII/14-15 EUDD-VII GZB Maintenance of transformer, HT/LT of 11kv feeder from sub station nandgram.

Download

23.07.2014
14/W/EUDD/VII/14-15 EUDD-VII GZB Maintenance of transformer, HT/LT of 11kv feeder from sub station meerut road.

Download

23.07.2014
13/W/EUDD/VII/14-15 EUDD-VII GZB Maintenance of transformer, HT/LT of 11kv feeder from sub station patel nagar-ii.

Download

23.07.2014
12/W/EUDD/VII/14-15 EUDD-VII GZB Maintenance of transformer, HT/LT of 11kv feeder from sub station patel nagar-ist.

Download

23.07.2014
11/W/EUDD/VII/14-15 EUDD-VII GZB Operational work of sub station nandgram & ator.

Download

23.07.2014
36/2014-15 EDD-I SHAMLI Works of transformer capacity increment.

Download

11.07.2014
35/2014-15 EDD-I SHAMLI Operational work of sub station titoli.

Download

11.07.2014
34/2014-15 EDD-I SHAMLI Maintenance of 11kv feeder from sub station simbhalaka.

Download

11.07.2014
13/2014-15 EDC BIJNOR Loading of damaged DT transformer of div chandpur.

Download

07.07.2014
12/2014-15 EDC BIJNOR Release 1000kva electric connection.

Download

07.07.2014
11/2014-15 EDC BIJNOR Transfer of electric line.

Download

07.07.2014
10/2014-15 EDC BIJNOR Loading of damaged DT transformer of div najeebabad.

Download

07.07.2014
09/2014-15 EDC BIJNOR Works of water level earthling, wiremess fencing, plinth of transformer.

Download

07.07.2014
08/2014-15 EDC BIJNOR Loading of damaged DT transformer of div bijnor.

Download

07.07.2014
26/2014-15 EDD-IV NOIDA Supply of spare parts of line, transformer & OCB.

Download

07.07.2014
25/2014-15 EDD-IV NOIDA Bill distribution of sub div jewar.

Download

07.07.2014
24/2014-15 EDD-IV NOIDA Bill distribution of sub div dankor.

Download

07.07.2014
23/2014-15 EDD-IV NOIDA Bill distribution of sub div dadri.

Download

07.07.2014
08/W/2014-15 EUTD MRT Replacement of mechanical/semi electronic/non demand meters of eudd-iv mrt.

Download

18.07.2014
07/W/2014-15 EUTD MRT Replacement of mechanical/semi electronic/non demand meters of eudd-iii mrt.

Download

18.07.2014
06/W/2014-15 EUTD MRT Replacement of mechanical/semi electronic/non demand meters of eudd-ii mrt.

Download

18.07.2014
05/W/2014-15 EUTD MRT Replacement of mechanical/semi electronic/non demand meters of eudd-i mrt.

Download

18.07.2014
08/ecwd/mrt/w/14-15 ECWD MRT Supply of LT pvc control cable.

Download

28.07.2014
07/ecwd/mrt/w/14-15 ECWD MRT Loading/unloading and transportation of ST poles.

Download

11.07.2014
06/ecwd/mrt/w/14-15 ECWD MRT Construction of 11kv feeder for sub station nagla sekhu.

Download

11.07.2014
05/ecwd/mrt/w/14-15 ECWD MRT Diff construction work at sub station nagla sekhu.

Download

11.07.2014
04/ecwd/mrt/w/14-15 ECWD MRT Construction of 11kv feeder for sub station rohta road.

Download

11.07.2014
T-25/2014-15 EDD-II BSR Replacement of OCB/VCB wiring & relay.

Download

25.07.2014
T-24/2014-15 EDD-II BSR Release various capacity connection.

Download

25.07.2014
T-23/2014-15 EDD-II BSR Supply of clamp box etc & laying of new abc cable.

Download

25.07.2014
T-22/2014-15 EDD-II BSR Replacement of damaged ABC, brackit & clamp.

Download

18.07.2014
T-21/2014-15 EDD-II BSR

Replacement of 11kv & LT line of sub station no-4 & neemkheda.

Download

18.07.2014
T-20/2014-15 EDD-II BSR Replacement of damaged ABC, brackit.

Download

14.07.2014
T-19/2014-15 EDD-II BSR Replacement of damaged ABC, brackit & clamp.

Download

14.07.2014
03/W/2014-15 ECWD SRE Supply of LT pvc control cable.

Download

08.07.2014
06/ETDB/2014-15 ETD BAGHPAT Supply & printing of meter ceiling certificate letters.

Download

14.07.2014
10/EDDG/2014-15 EDD GARH Operational work of sub station garhmiktswar-2(urban).

Download

09.07.2014
09/EDDG/2014-15 EDD GARH Maintenance of electric line of sub station garhmiktswar-2(urban).

Download

09.07.2014
19/2014-15 EUDD-I MZN Shifting of transformer,line & poles at ghandhi colony jail phatak.

Download

28.07.2014
18/2014-15 EUDD-I MZN Shifting of transformer,line & poles at reshu vihar sercular road.

Download

28.07.2014
17/2014-15 EUDD-I MZN Repairing/rectification of line and shifting of pole & transformer.

Download

23.07.2014
16/2014-15 EUDD-I MZN Replacement of damaged tower no-37 of 66kv line.

Download

23.07.2014
15/2014-15 EUDD-I MZN Supply of Crimping Lugs made of Aluminum having capacity of size 630 mm2  650 Nos.

Download

23.07.2014
14/2014-15 EUDD-I MZN Supply of Crimping Lugs made of Aluminum having capacity of size 400 mm2 1000 Nos.

Download

23.07.2014
08/2014-15 ECDD GZB Works related to fire hydrent system.

Download

28.07.2014
PVVNL-MT/15(S) /2014-15 Material Management

Conversion of existing overhead LT lines to Underground cable network, Construction of New 11 KV feeders, & installation of new 250 KVA Distribution Transformers for improvement of electric supply & distribution network in Rampur Town.

Download

04.08.2014
14/2014-15 EDD-IV NOIDA Repairing of damaged ST poles.

Download

04.07.2014
13/2014-15 EDD-IV NOIDA Construction of 11kv rural feeder jewar.

Download

04.07.2014
12/2014-15 EDD-IV NOIDA Release 15kva connection.

Download

04.07.2014
11/2014-15 EDD-IV NOIDA Rectification of 33kv line.

Download

04.07.2014
10/2014-15 EDD-IV NOIDA Works of laying of ABC.

Download

04.07.2014
09/2014-15 EDD-IV NOIDA Load distribution work at 250kva transformer.

Download

04.07.2014
08/2014-15 EDD-IV NOIDA Replacement of wire & construction of pole.

Download

04.07.2014
07/2014-15 EDD-IV NOIDA Supply of truck driver & unskilled labour.

Download

04.07.2014
PVVNL-MT/13(S) /2014-15 Material Management

Supply of 1500 nos. 13 mtr. Steel Tubular Pole, (SP-70).

Download

05.07.2014
01/ETDH/2014-15 ETD HAPUR Repairing of PT & housing.

Download

04.08.2014
08/2014-15 EDC SAMBHAL Req. of gang.

Download

09.07.2014
07/2014-15 EDC SAMBHAL Supply of TGT-2 & SSO.

Download

09.07.2014
31/W/2014-15 EUDD-V NOIDA Works of interconnection of sub station sec-55 with laying of XLPE under ground cable.

Download

02.07.2014
21/eddkhatoli/14-15 EDD KHATOLI Protection work of power transformer of sub station goyala.

Download

03.07.2014
20/eddkhatoli/14-15 EDD KHATOLI Construction of plinth for shifting of power transformer of sub station khatoli (rural).

Download

03.07.2014
19/eddkhatoli/14-15 EDD KHATOLI Protection work of power transformer of sub station sikandarpur.

Download

03.07.2014
18/eddkhatoli/14-15 EDD KHATOLI Protection work of power transformer of sub station toda.

Download

03.07.2014
15/2014-15 ECWD GZB Transportation of STP-SP & PCC pole from store bsr & mrt to store hapur.

Download

15.07.2014
26/2014-15 EUDD-IV GZB Load distribution of 11kv industrial feeder.

Download

10.07.2014
25/2014-15 EUDD-IV GZB Moving of DG-ii feeder at sub station arthala.

Download

10.07.2014
24/2014-15 EUDD-IV GZB Jointing of 11kv sahadara feeder-1 & 2.

Download

10.07.2014
23/2014-15 EUDD-IV GZB Jointing of two new feeder from sub station rajendra nagar-ii.

Download

09.07.2014
22/2014-15 EUDD-IV GZB Load distribution of rajendra nagar east feeder.

Download

09.07.2014
21/2014-15 EUDD-IV GZB Load distribution of 11kv kali mandir feeder.

Download

09.07.2014
20/2014-15 EUDD-IV GZB Jointing of two new feeder from sub station rajendra nagar-ii.

Download

09.07.2014
19/2014-15 EUDD-IV GZB Construction of new feeder.

Download

09.07.2014
12/2014-15 EUDD-VI GZB Req. of diff type material.

Download

02.07.2014
11/2014-15 EUDD-VI GZB Construction of composite line.

Download

02.07.2014
10/2014-15 EUDD-VI GZB Construction of shed at billing counter.

Download

02.07.2014
20/2014-15 EUDD-III NOIDA Laying of XLPE under ground cable of sub station sec-19.

Download

01.07.2014
19/2014-15 EUDD-III NOIDA Laying of XLPE under ground cable from  sec-124 to 126.

Download

01.07.2014
18/2014-15 EUDD-III NOIDA Laying of XLPE under ground cable of sub station sec-45.

Download

01.07.2014
17/2014-15 EUDD-III NOIDA Laying of XLPE under ground cable of sub station sec-142 for optional arrangement.

Download

01.07.2014
16/2014-15 EUDD-III NOIDA Laying of XLPE under ground cable of sub station sec-142.

Download

01.07.2014
02/ESC/MT/2014-15 ESC MRT Loading, unloading & stacking of PCC pole from pole construction unit muradnagar(gzb), khatoli & mbd to pvvnl mrt diff store centres/store sub centres/places. Download 05.07.2014
16/2014-15 EDD MZN Construction of line & pole in gram datiyana, mustafabad & jadoda.

Download

03.07.2014
15/2014-15 EDD MZN Construction of line for sub station lalukhedi.

Download

03.07.2014
14/2014-15 EDD MZN Construction of line for release connection of oriental bank of commerce bhopa & bsnl.

Download

03.07.2014
13/2014-15 EDD MZN Misc. work.

Download

03.07.2014
12/2014-15 EDD MZN Req. of control cable & repairing of incoming/outgoing OCB.

Download

03.07.2014
11/2014-15 EDD MZN Replacement of damaged cable of 11kv mansoorpur feeder.

Download

03.07.2014
10/2014-15 EDD MZN Works of off of 11kv line.

Download

03.07.2014
15/2014-15 EUDD-III NOIDA Laying of XLPE under ground cable from sub station sec-142 to 11kv feeder 02 & 05.

Download

30.06.2014
14/2014-15 EUDD-III NOIDA Laying of XLPE under ground cable in sunhari market, new bhawani & gali no-01 chalera.

Download

30.06.2014
13/2014-15 EUDD-III NOIDA Laying of XLPE under ground cable sharma market, kirti palace.

Download

30.06.2014
12/2014-15 EUDD-III NOIDA Laying of XLPE under ground cable in vinayak hospital sec-27 noida.

Download

30.06.2014
11/2014-15 EUDD-III NOIDA Laying of XLPE under ground cable from chalera gali no-06 to patrol pump.

Download

30.06.2014
10/2014-15 EUDD-III NOIDA Laying of XLPE under ground cable from GIP sahdara drain to sub station sec-16a noida.

Download

30.06.2014
13/2014-15 EUDD-I MZN Repairing/rectification of line.

Download

21.07.2014
12/2014-15 EUDD-I MZN Shifting of pole & transformer.

Download

21.07.2014
11/2014-15 EUDD-I MZN Req. of gang, diesel vehicle with driver.

Download

10.07.2014
20/2014-15 EUDD-VI GZB Req. of diff material.

Download

08.07.2014
19/2014-15 EUDD-VI GZB Construction of damaged pole & line.

Download

08.07.2014
18/2014-15 EUDD-VI GZB Works of fault locate of under ground cable & filling of cable box of sub station maharajpur.

Download

08.07.2014
15/W/2014-15 EUDD-V NOIDA Laying of LT cable & related work in sec-105 plot no 10 to 24.

Download

07.07.2014
14/W/2014-15 EUDD-V NOIDA Laying of LT cable & related work in sec-105 plot no 2 to 55.

Download

07.07.2014
13/W/2014-15 EUDD-V NOIDA Laying of LT cable & related work in sec-105 plot no 21.

Download

07.07.2014
12/W/2014-15 EUDD-V NOIDA Laying of LT cable & related work in sec-105 plot no 24 to 58.

Download

07.07.2014
11/W/2014-15 EUDD-V NOIDA Laying of LT cable & related work in sec-135 HD 133 to 182.

Download

07.07.2014
10/W/2014-15 EUDD-V NOIDA Laying of LT cable & related work in sec-135 HD 77 to 103.

Download

07.07.2014
09/W/2014-15 EUDD-V NOIDA Laying of LT cable & related work in sec-135 HD 134 to 183.

Download

07.07.2014
08/W/2014-15 EUDD-V NOIDA Laying of LT cable & related work in sec-135 HD 78 to 104.

Download

07.07.2014
07/W/2014-15 EUDD-V NOIDA Laying of LT cable & related work in sec-135 HD 341 to 370.

Download

07.07.2014
06/W/2014-15 EUDD-V NOIDA Laying of LT cable & related work in sec-135 HD 316 to 337.

Download

07.07.2014
18/2014-15 ECDD MRT Construction of MS grill at 08no. field hostel.

Download

11.07.2014
17/2014-15 ECDD MRT Annual maintenance of committee room , operational & keeping work of generator & lawn at MD Office Meerut.

Download

11.07.2014
T-06/2014-15 EDD-I BSR Construction of 63/100kva transformer.

Download

07.07.2014
24/EWC/ MRT/W/2014-15 EWC MRT Supply of Solid press Board sheet for the maintenance of damaged transformers at various CTR Workshop.

Download

03.07.2014
23/EWC/ MRT/W/2014-15 EWC MRT Supply of Pre Compressed sheet for the maintenance of damaged transformers at various CTR Workshop.

Download

03.07.2014
22/EWC/ MRT/W/2014-15 EWC MRT Supply of Insulating craft paper 2 mil for the maintenance of damaged transformers at various CTR Workshop.

Download

01.07.2014
21/EWC/ MRT/W/2014-15 EWC MRT Maintenance work of damaged transformers of 25-100 KVA capacity at various CTR Workshop.

Download

01.07.2014
WT-06/2014-15 EUDD-I GZB Maintenance related work of 33KV Indoor Panel installed at 33/11 KV Substation RDC Rajnagar.

Download

02.07.2014
15/2014-15 ECWD MBD Under ground railway crossing work by 33 KV Cable of under construction 33 KV Line Jhaloo.

Download

18.07.2014
14/2014-15 ECWD MBD Under ground railway crossing work by 33 KV Cable of under construction 33 KV Line of under coonstruction 33/11 KV Substation Fatehpur Vishnoi.

Download

18.07.2014
45/eddkhatoli/14-15 EDD KHATOLI Construction of fencing and earthing work of 25 KVA Transformer.

Download

07.07.2014
18/2014-15 EDD DHAMPUR Various works like connection releasing and load enhancement under deposit scheme.

Download

01.07.2014
16/2014-15 EDD DHAMPUR Various work under deposit scheme.

Download

01.07.2014
15/2014-15 EDD DHAMPUR Various work under deposit scheme.

Download

01.07.2014
PVVNL/M/HQ/ 06/2014-15 PVVNL MRT HQ Works of providing 6 light diesel vehicle (car) with driver.

Download

10.07.2014
51/eddkhatoli/14-15 EDD KHATOLI Work related to preventing accident that may happen in Kanwar Yatra under EDSD Budhana Rural.

Download

07.07.2014
50/eddkhatoli/14-15 EDD KHATOLI Work related to preventing accident that may happen in Kanwar Yatra under EDSD Khatoli Rural.

Download

07.07.2014
49/eddkhatoli/14-15 EDD KHATOLI Work related to preventing accident that may happen in Kanwar Yatra under EDSD Khatoli urban.

Download

07.07.2014
PVVNL-MT/R-APDRP-B/12/14-15 R-APDRP The Work of Establishment of SCADA compatibility and improving quality of consumer supply of SAHARANPUR, MORADABAD, GHAZIABAD AND MEERUT towns of Uttar Pradesh, to be carried out under R-APDRP Part-B scheme” on turnkey basis including supply of material

Download

30.07.2014
T-20/2014-15 EDD-I MBD Replacement work of worn out GI wires and installation of poles on long spans of 11 KV Feeder Hussainpur.

Download

14.07.2014
T-19/2014-15 EDD-I MBD Construction of HT/LT line of gram seelpur.

Download

14.07.2014
T-18/2014-15 EDD-I MBD Construction of HT/LT line of gram Jaitpur Patti.

Download

14.07.2014
T-17/2014-15 EDD-I MBD Construction of HT/LT line of gram Rooppur.

Download

14.07.2014
T-16/2014-15 EDD-I MBD Construction of HT/LT line of gram Gora Shahgarh.

Download

14.07.2014
T-15/2014-15 EDD-I MBD Construction of HT/LT line of gram Peepli.

Download

14.07.2014
46/eddkhatoli/14-15 EDD KHATOLI Bill distribution work of Domestic Light & Fan consumers of Budhana Village.

Download

11.07.2014
04/2014-15 EDD-III SHAMLI Construction & Energisation of 7 Connection Line under Payjal scheme.

Download

02.07.2014
14/2014-15 ECWD GZB Construction of 33 KV Line for Feeding  33/11 KV substation Jarara, Bulandshahar from 132 KV Palara Jhal.

Download

09.07.2014
13/2014-15 ECWD GZB Construction of 33/11 KV substation Jarara, Bulandshahar.

Download

09.07.2014
12/2014-15 ECWD GZB Work of transportation, loading/unloading of transformers.

Download

09.07.2014
11/2014-15 ECWD GZB Construction of 33 KV Link Line for Feeding  33/11 KV Substation Karanpur, Bulandshahar from 132 KV Anoopshahar.

Download

09.07.2014
10/2014-15 ECWD GZB Capacity increasing work of 33/11 KV Substation Karanpur, Bulandshahar.

Download

09.07.2014
09/2014-15 ECWD GZB Capacity increasing work of 33/11 KV Substation Bhud Chauraha.

Download

09.07.2014
WT-08/2014-15 EUDD-I GZB Work of providing Diesel Generator and related work for division & subdivision offices.

Download

01.07.2014
07/2014-15 ECDD GZB Annual Maintenance work of Hydel Colony Kavinagar, Ghaziabad.

Download

23.07.2014
03/ecwd/mrt/w/14-15 ECWD MRT Work of conversion of Line between 132 KV Substation Kharad to Bhaurkalan to double circuit.

Download

01.07.2014
08/EDDG/2014-15 EDD GARH Diff transacted work under deposit scheme & improve system.

Download

30.06.2014
07/EDDG/2014-15 EDD GARH Construction of pole, wire & transformer in diff villages.

Download

30.06.2014
12/W/2014-15 EDC SRE Operational work of sub station sarsava & chilakana.

Download

25.06.2014
11/W/2014-15 EDC SRE Operational work of sub station ghunna & behat.

Download

25.06.2014
10/W/2014-15 EDC SRE Maintenance of 11kv feeder from sub station chilkana.

Download

25.06.2014
19/2014-15 EDD-IV NOIDA Replacement of 1000kva damaged transformer.

Download

25.06.2014
18/2014-15 EDD-IV NOIDA Misc. work.

Download

25.06.2014
17/2014-15 EDD-IV NOIDA Repairing of damaged ST pole in 33kv line from sub station usrah.

Download

25.06.2014
16/2014-15 EDD-IV NOIDA Repairing of damaged ST pole in 33kv  line in sub stationdharpa to jahangeerpur & bankapur.

Download

25.06.2014
15/2014-15 EDD-IV NOIDA Repairing of damaged ST pole in 11kv & LT line from sub station jahangeerpur.

Download

25.06.2014
28/W/201-15 EDD MODINAGAR Works of complaint attending through gang & maintenance of HT/LT line, transformer from sub station new.

Download

28.06.2014
27/W/201-15 EDD MODINAGAR Works of complaint attending through gang & maintenance of HT/LT line, transformer from sub station bharat udhyog.

Download

28.06.2014
26/W/201-15 EDD MODINAGAR Works of complaint attending through gang & maintenance of HT/LT line, transformer from sub station rawli & kakda.

Download

28.06.2014
25/W/201-15 EDD MODINAGAR Works of complaint attending through gang & maintenance of HT/LT line, transformer from sub station noorpur.

Download

28.06.2014
24/W/201-15 EDD MODINAGAR Works of complaint attending through gang & maintenance of HT/LT line, transformer from sub station old.

Download

28.06.2014
02/2014-15 ETD SAMBHAL Works of regular/accidental electrical testing of edd chandosi & sambhal.

Download

31.07.2014
10/2014-15 EUDD-I MZN Release 400kva connection, shifting of line etc.

Download

15.07.2014
09/2014-15 EUDD-I MZN Works of barricading of transformer.

Download

15.07.2014
08/2014-15 EUDD-I MZN Req. of diesel vehicle with driver.

Download

15.07.2014
07/2014-15 EUDD-I MZN Rectification/rectification & shifting of line.

Download

02.07.2014
02/W/2014-15 ECWD SRE Construction of switchyard & capacity increment work of sub station kutba.

Download

26.06.2014
04/eutd/2014-15 EUTD NOIDA Supply of 11kv metering PT.

Download

07.07.2014
01/W/2014-15 EDD NAKUR Electrification work in gram dholapada.

Download

25.06.2014
WT-07/2014-15 EUDD-I GZB Repairing of 33kv & 11kv damaged under ground cable.

Download

27.06.2014
18/2014-15 EDD MZN Works of bill distribution of edsd-iv mzn.

Download

28.06.2014
17/2014-15 EDD MZN Works of bill distribution of edsd-iii mzn.

Download

28.06.2014
17/2014-15 EUDD-VI GZB Works of fault locate of under ground cable & filling of cable box of sub station ambika steel.

Download

25.06.2014
16/2014-15 EUDD-VI GZB Works of fault locate of under ground cable & filling of cable box of sub station sec-10 vasundhara.

Download

25.06.2014
23/W/201-15 EDD MODINAGAR Rectification of LT line.

Download

23.06.2014
22/W/201-15 EDD MODINAGAR Works under package no 296,319,22, 23 & 335.

Download

23.06.2014
21/W/201-15 EDD MODINAGAR Works under package no 268,269 & 270.

Download

23.06.2014
20/W/201-15 EDD MODINAGAR Works under deposit scheme of vidhayak fund.

Download

23.06.2014
19/W/201-15 EDD MODINAGAR Replacement of repaired transformer.

Download

23.06.2014
08/W/EUDD/VII/14-15 EUDD-VII GZB Supply of VCB spare parts.

Download

03.07.2014
07/W/EUDD/VII/14-15 EUDD-VII GZB Supply of diff size aluminum crimping lugs.

Download

03.07.2014
06/W/EUDD/VII/14-15 EUDD-VII GZB Construction of 11kv line.

Download

03.07.2014
05/W/EUDD/VII/14-15 EUDD-VII GZB Replacement of CT/PT unit.

Download

03.07.2014
04/W/EUDD/VII/14-15 EUDD-VII GZB Replacement of 33kv VCB.

Download

03.07.2014
25/W/2014-15 EDD PILKHUA Maintenance of HT, LT line of sub station textile centre pilkhua.

Download

28.06.2014
PVVNL-MT/RGGVY-II/11/2014-15 PVVNL RGGVY Work of creation of Rural Electricity Infrastructure and Rural Household Electrification under Rajiv Gandhi Grameen Vidyutikaran Yojana (RGGVY PHASE-II)” for 865 villages/mazras of Muzaffarnagar District under 11th Plan on Turnkey Basis.

NIT

Tender Doc

04.08.2014
PVVNL-MT/RGGVY-II/10/2013-14 PVVNL RGGVY Work of creation of Rural Electricity Infrastructure and Rural Household Electrification under Rajiv Gandhi Grameen Vidyutikaran Yojana (RGGVY PHASE-II) 12th Plan on Turnkey Basis for  Saharanpur districts.

NIT

Tender Doc

02.08.2014
PVVNL-MT/RGGVY-II/09/2013-14 PVVNL RGGVY Work of creation of Rural Electricity Infrastructure and Rural Household Electrification under Rajiv Gandhi Grameen Vidyutikaran Yojana (RGGVY PHASE-II) 12th Plan on Turnkey Basis for  Hapur districts.

NIT

Tender Doc

02.08.2014
PVVNL-MT/RGGVY-II/08/2013-14 PVVNL RGGVY Work of creation of Rural Electricity Infrastructure and Rural Household Electrification under Rajiv Gandhi Grameen Vidyutikaran Yojana (RGGVY PHASE-II) 12th Plan on Turnkey Basis for  Ghaziabad districts.

NIT

Tender Doc

02.08.2014
PVVNL-MT/06(S) /2014-15 Material Management Work of repair of estimate quantity 700 nos., wound core type, 11/0.25 KV, 10 KVA single phase Al. wound damage transformers.

Download

10.07.2014
24/2014-15 EDD LONI Works of bill distribution of light & fan category (without meter).

Download

15.07.2014
23/2014-15 EDD LONI Loading/unloading of small & medium category damaged /repaired transformer.

Download

15.07.2014
22/2014-15 EDD LONI Works of water level earthling.

Download

15.07.2014
19/2014-15 EDD LONI Supply of diff material & replacement of HT line wire & pole.

Download

30.06.2014
18/2014-15 EDD LONI Req. of computer operator.

Download

30.06.2014
17/2014-15 EDD LONI Supply & replacement of cable box.

Download

30.06.2014
07/2014-15 EDC BIJNOR Works related to loose wire & pole.

Download

23.06.2014
06/2014-15 EDC BIJNOR Contraction of sub station.

Download

23.06.2014
05/2014-15 EDC BIJNOR Replacement of 11kv cable & contraction of sub station.

Download

23.06.2014
30/W/2014-15 EUDD-V NOIDA Attending of break down at fast stage of eudsd-ix.

Download

25.06.2014
29/W/2014-15 EUDD-V NOIDA Attending of break down at fast stage of eudsd-viii.

Download

25.06.2014
28/W/2014-15 EUDD-V NOIDA Attending of time to time break down at fast stage of eudsd-iii.

Download

25.06.2014
23/W/2014-15 EUDD-V NOIDA Laying of under ground  33kv cable.

Download

23.06.2014
22/W/2014-15 EUDD-V NOIDA Repairing & fault location of under ground cable.

Download

23.06.2014
24/W/2014-15 EDD PILKHUA Work of electricity distribution of light & fan, commercial category in sub div dasna.

Download

04.07.2014
23/W/2014-15 EDD PILKHUA Work of electricity distribution of light & fan, commercial category in sub div pilkhua.

Download

04.07.2014
22/W/2014-15 EDD PILKHUA Work of plinth, earthling, fencing & construction of line.

Download

04.07.2014
21/W/2014-15 EDD PILKHUA Work of water level earthling of transformer in sub div-pilkhua.

Download

04.07.2014
20/W/2014-15 EDD PILKHUA Work of water level earthling of transformer in sub div-dasna.

Download

04.07.2014
14/W/2014-15 EDD PILKHUA Work execution of theft wire & damaged line/pole of 33kv & 11kv line

Download

25.06.2014
20/2014-15 ECDD MBD Construction of skada control center in mbd.

Download

04.07.2014
14/W/2014-15 EUDD-I NOIDA Works of making details of revenue collection in ICICI  Bank.

Download

08.07.2014
09/2014-15 EDD-II SHAMLI Misc. work.

Download

21.05.2014
06/2014-15 ECDD GZB Civil works of two storey building for skada control center in hydel colony kavi nagar gzb.

Download

03.07.2014
T-05/2014-15 EDD-I BSR Supply of spare parts.

Download

23.06.2014
04/W/2014-15 EUDD-II MZN Replacement of packing & sheel, req. of control cable, VCB overhauling, cable connection.

Download

20.06.2014
03/W/2014-15 EUDD-II MZN Misc. work.

Download

20.06.2014
02/W/2014-15 EUDD-II MZN Repairing of incoming/outgoing VCB.

Download

20.06.2014
01/W/2014-15 EUDD-II MZN Replacement of XLPE cable & establishment of 11kv & 33kv VCB.

Download

20.06.2014
35/eddkhatoli/14-15 EDD KHATOLI Supply of biko make bushing & ece make OCB etc.

Download

20.06.2014
34/eddkhatoli/14-15 EDD KHATOLI Supply of 33kv copper made blade, joj, PG clamp etc.

Download

20.06.2014
33/eddkhatoli/14-15 EDD KHATOLI Replacement of diff size cable box.

Download

20.06.2014
09/2014-15 EUDD-III NOIDA Works of making details of revenue collection in ICICI & PNB Bank.

Download

25.06.2014
08/2014-15 EDD-II SHAMLI Replacement of damaged wire & construction of pcc pole.

Download

21.05.2014
07/2014-15 EUTD-I GZB Repairing & testing of 33kv ,11kc breakers & transformer of eudd-vii gzb.

Download

26.06.2014
06/2014-15 EUTD-I GZB Repairing & testing of 33kv ,11kc breakers & transformer of eudd-v gzb.

Download

26.06.2014
05/2014-15 EUTD-I GZB Repairing & testing of 33kv ,11kc breakers & transformer of eudd-iii gzb.

Download

21.07.2014
04/2014-15 EUTD-I GZB Repairing & testing of 33kv ,11kc breakers & transformer of eudd-i gzb.

Download

21.07.2014
21/W/2014-15 EUDD-V NOIDA Establishment of transformer/CT/PT unit, construction of double pole, line.

Download

20.06.2014
20/S/2014-15 EUDD-V NOIDA Supply & printing of commercial letter/stationary.

Download

20.06.2014
19/W/2014-15 EUDD-V NOIDA Replacement of HT/LT rod, oil siel packing for maintenance of transformer of sub div-iii.

Download

20.06.2014
18/W/2014-15 EUDD-V NOIDA Replacement of HT/LT rod, oil siel packing for maintenance of transformer of sub div-ix.

Download

20.06.2014
17/W/2014-15 EUDD-V NOIDA Replacement of HT/LT rod, oil siel packing for maintenance of transformer of sub div-viii.

Download

20.06.2014
16/W/2014-15 EUDD-V NOIDA Works of making details of revenue collection in ICICI & vijaya Bank.

Download

20.06.2014
18/2014-15 EUDD-IV GZB Supply of SSO for operational of sub station rajendra nagar-2.

Download

03.07.2014
20/2014-15 ECDD MRT Civil works of two storey building for skada control center in meerut city.

Download

03.07.2014
14/2014-15 EUDD-II NOIDA Req. & filling of 11kv cable jointing kit & finding of fault of 11kv under ground cable through fault locator.

Download

19.06.2014
13/2014-15 EUDD-II NOIDA Req. & filling of 33kv cable jointing kit & finding of fault of 33kv under ground cable through fault locator.

Download

19.06.2014
12/2014-15 EUDD-II NOIDA Works of making details of revenue collection in ICICI & vijaya Bank.

Download

30.06.2014
08/2014-15 EUDD-III NOIDA Req. & filling of 11kv cable jointing kit & finding of fault of 11kv under ground cable through fault locator.

Download

23.06.2014
07/2014-15 EUDD-III NOIDA Req. & filling of 33kv cable jointing kit & finding of fault of 33kv under ground cable through fault locator.

Download

23.06.2014
16/2014-15 EDD LONI Construction of new transformer.

Download

24.06.2014
15/2014-15 EDD LONI Construction of pole & rectification of wire.

Download

24.06.2014
14/2014-15 EDD LONI Capacity increment of transformer.

Download

24.06.2014
13/2014-15 EDD LONI Construction of pole in long span & replacement of LT abc.

Download

24.06.2014
12/2014-15 EDD LONI Construction of wire/transformer.

Download

24.06.2014
11/2014-15 EDD LONI Works related to LT line loose wire.

Download

24.06.2014
10/2014-15 EDD LONI Construction of double pole.

Download

24.06.2014
01/W/2014-15 EUDD-I SRE Req. of experienced IT application skilled manpower. Download 20.06.2014
01/2014-15 ITD NOIDA Supply & establishment of high resolution roof mounted & portable projection system.

Download

24.06.2014
20/EWC/ MRT/W/2014-15 EWC MRT Purification of dirty transformer oil.

Download

20.06.2014
19/EWC/ MRT/P/2014-15 EWC MRT Supply of Egyptian cotton tape.

Download

20.06.2014
02/ecwd/mrt/w/14-15 ECWD MRT Construction of 11KV link line.

Download

17.06.2014
02/2014-15 EUDD-II GZB Establishment of 11mtr round pole & pulling of line.

Download

20.06.2014
04/W/2014-15 EUTD MRT Construction of MRI lead material.

Download

15.07.2014
18/W/201-15 EDD MODINAGAR Repairing of transformer of noorpur sub station.

Download

18.06.2014
17/W/201-15 EDD MODINAGAR Repairing of transformer of new sub station muradnagar.

Download

18.06.2014
16/W/201-15 EDD MODINAGAR Resenging & replacement of damaged line /pole of sub div-ii modinagar..

Download

18.06.2014
15/W/201-15 EDD MODINAGAR Resenging & replacement of damaged line /pole of sub div-iii modinagar..

Download

18.06.2014
14/W/201-15 EDD MODINAGAR Jointing of vyaparian feeder.

Download

18.06.2014
13/W/201-15 EDD MODINAGAR Construction of cable box.

Download

18.06.2014
04/S/201-15 EDD MODINAGAR Supply of LT out going studs.

Download

18.06.2014
08/2014-15 ECWD GZB Construction of 33kv link line.

Download

28.06.2014
12/W/2014-15 EDD PILKHUA Release 210kwatt commercial(HV-2) connection.

Download

17.06.2014
30/2014-15 EDD-I SHAMLI Replacement of damaged transformer at sub station khedu karmu.

Download

05.07.2014
29/2014-15 EDD-I SHAMLI Works of transformer capacity increment in sub station bhairawal & construction of isolator at sub station malendi.

Download

05.07.2014
28/2014-15 EDD-I SHAMLI Construction of 33kv link from sub station shamli-shyamala to hathjoya.

Download

07.07.2014
27/2014-15 EDD-I SHAMLI Construction of 33kv link from sub station shamli-shyamala to datheda.

Download

07.07.2014
14/W/2013-14 EUDD-I NOIDA Req. of diesel vehicle.

Download

18.06.2014
33/2014-15 EDD-I SHAMLI Maintenance of 11kv feeder from sub station mansura.

Download

20.06.2014
32/2014-15 EDD-I SHAMLI Maintenance of 11kv feeder from sub station gagor.

Download

20.06.2014
31/2014-15 EDD-I SHAMLI Maintenance of 11kv feeder from sub station pawti kala.

Download

20.06.2014
32/eddkhatoli/14-15 EDD KHATOLI Operational work of sub station sah dabbar.

Download

19.06.2014
31/eddkhatoli/14-15 EDD KHATOLI Maintenance of 11kv feeder from sub station sah dabbar.

Download

19.06.2014
30/eddkhatoli/14-15 EDD KHATOLI Maintenance of 11kv feeder from sub station khatoli(rural)

Download

19.06.2014
29/eddkhatoli/14-15 EDD KHATOLI Maintenance of 11kv feeder from sub station sahpur.

Download

19.06.2014
28/eddkhatoli/14-15 EDD KHATOLI Maintenance of 11kv feeder from sub station goyla.

Download

19.06.2014
27/eddkhatoli/14-15 EDD KHATOLI Maintenance of 11kv feeder from sub station toda.

Download

19.06.2014
26/eddkhatoli/14-15 EDD KHATOLI Maintenance of 11kv feeder from sub station sikandarpur.

Download

19.06.2014
25/eddkhatoli/14-15 EDD KHATOLI Maintenance of 11kv feeder from sub station tisang.

Download

19.06.2014
24/eddkhatoli/14-15 EDD KHATOLI Maintenance of 11kv feeder from sub station khatoli(rural)

Download

19.06.2014
23/eddkhatoli/14-15 EDD KHATOLI Maintenance of 11kv feeder from sub station khatoli(town)

Download

19.06.2014
PVVNL-MT/1269 /2013-14 Material Management Conversion of 80000 Kg.old damaged/burnt copper coils into ETP grade (IS-191 part Vth 1980/any latestamendment) DPC Copper winding wire/DPC Copper LT strips

Download

22/2014-15 EDD-IV NOIDA Replacement of damaged pole & wire of sub div jewar.

Download

13.06.2014
21/2014-15 EDD-IV NOIDA Replacement of damaged pole & wire of sub div dankor.

Download

13.06.2014
20/2014-15 EDD-IV NOIDA Replacement of damaged pole & wire of sub div dadri.

Download

13.06.2014
01/ESC/MT/2014-15 ESC MRT Loading, unloading & stacking of PCC pole. Download 19.06.2014
13/W/2013-14 EUDD-I NOIDA Construction of double pole & establishment of transformer in sec-68,70 & 122.

Download

14.06.2014
12/W/2013-14 EUDD-I NOIDA Construction of double pole & establishment of transformer in sec-51,66 & 99.

Download

14.06.2014
11/W/2013-14 EUDD-I NOIDA Construction of double pole & establishment of transformer in sec-22 I & J block.

Download

14.06.2014
10/W/2013-14 EUDD-I NOIDA Construction of double pole & establishment of transformer in sec-22 F & G block.

Download

14.06.2014
09/W/2013-14 EUDD-I NOIDA Construction of double pole & establishment of transformer in sec-71 & 22.

Download

14.06.2014
08/W/2013-14 EUDD-I NOIDA Replacement of LT PVC cable of sec-34 B-01 & B-09.

Download

16.06.2014
07/W/2013-14 EUDD-I NOIDA Replacement of LT PVC cable of sec-71 A-03 transformer no 02.

Download

16.06.2014
06/W/2013-14 EUDD-I NOIDA Replacement of LT PVC cable of sec-71 A-03 transformer no 01.

Download

16.06.2014
05/W/2013-14 EUDD-I NOIDA Replacement of LT PVC cable of sec-34 B-03 & B-12..

Download

16.06.2014
04/W/2013-14 EUDD-I NOIDA Replacement of LT PVC cable of sec-34 B-10 & C-72.

Download

16.06.2014
07/eddkhatoli/14-15 EDD KHATOLI Req. & repairing of OCB & VCB.

Download

13.06.2014
13/2014-15 EUDD-VIII GZB

Works of filling cable box & finding of 33kv under ground cable fault.

Download

28.06.2014
12/2014-15 EUDD-VIII GZB

Repairing of damaged ST poles.

Download

28.06.2014
11/2014-15 EUDD-VIII GZB

Transportation of new/repaired transformer.

Download

28.06.2014
19/W/2014-15 EDD PILKHUA Keeping of letters & operational work of kulsiya sub station.

Download

25.06.2014
18/W/2014-15 EDD PILKHUA Keeping of line & maintenance of kulsiya sub station.

Download

25.06.2014
17/W/2014-15 EDD PILKHUA Construction of diff. fire brigade & security items.

Download

25.06.2014
16/W/2014-15 EDD PILKHUA Establishment of protection board with control cable.

Download

25.06.2014
15/W/2014-15 EDD PILKHUA Construction of CT/PT unit.

Download

25.06.2014
13/W/2014-15 EDD PILKHUA Shifting of 33kv & 11kv line.

Download

17.06.2014
09/2014-15 EDD MZN Establishment of VCB & control panel.

Download

17.06.2014
08/2014-15 EDD MZN Establishment of VCB in place of OCB.

Download

17.06.2014
07/2014-15 ECWD GZB Supply of control cable.

Download

24.06.2014
T-18/2014-15 EDD-II BSR Replacement of damaged fuse set , line isolator and incoming/outgoing OCB.

Download

04.07.2014
T-17/2014-15 EDD-II BSR Replacement of damaged parts & repairing & overhauling of VCB/OCB.

Download

04.07.2014
T-16/2014-15 EDD-II BSR Replacement of damaged wire & insulator.

Download

04.07.2014
T-15/2014-15 EDD-II BSR Supply of aluminum bus bars.

Download

25.06.2014
24/edd/debai/14-15 EDD DEBAI Replacement of damaged parts & repairing of TPMO & establishment of battery and charger, earthling at sub station belon.

Download

12.06.2014
23/edd/debai/14-15 EDD DEBAI Replacement of damaged parts & repairing of TPMO & establishment of battery and charger, earthling at sub station jiroli.

Download

12.06.2014
22/edd/debai/14-15 EDD DEBAI Replacement of damaged parts & repairing of TPMO & establishment of battery and charger, earthling at sub station karvas.

Download

12.06.2014
21/edd/debai/14-15 EDD DEBAI Replacement of damaged parts & repairing of TPMO & establishment of battery and charger, earthling at sub station chatari.

Download

12.06.2014
20/edd/debai/14-15 EDD DEBAI Replacement of damaged parts & repairing of TPMO & establishment of battery and charger, earthling at sub station kali nadi.

Download

12.06.2014
19/edd/debai/14-15 EDD DEBAI Replacement of damaged parts & repairing of TPMO & establishment of battery and charger, earthling at sub station ahmadgarh.

Download

12.06.2014
T-11/2014-15 EDD-I MBD Construction of HT/LT line of gram karsara.

Download

30.06.2014
T-10/2014-15 EDD-I MBD Construction of HT/LT line of gram manakpur.

Download

30.06.2014
T-09/2014-15 EDD-I MBD Construction of HT/LT line of gram allapur bheekan.

Download

30.06.2014
T-08/2014-15 EDD-I MBD Construction of HT/LT line of gram gurer.

Download

30.06.2014
T-07/2014-15 EDD-I MBD Construction of HT/LT line of gram deengarpur.

Download

30.06.2014
WT-02/2014-15 EUDD-I GZB Works of water level earthling.

Download

17.06.2014
02/ESDG/2014-15 ESD GZB Loading, unloading & stacking of 800mtr ton steel.

Download

12.06.2014
01/ecwd/mrt/w/14-15 ECWD MRT Construction of 33kv double circuit line.

Download

10.06.2014
PVVNL-MT/07(S) /2014-15 Material Management

Supply of 200 Nos. 36 KV Outdoor type, VCB along with 33KV CT’s.

Download

20.06.2014
18/edd/debai/2014-15 EDD DEBAI Replacement of damaged parts & repairing of incoming & outgoing VCB at sub station jiroli & karnvas.

Download

09.06.2014
17/edd/debai/2014-15 EDD DEBAI Replacement of damaged parts & repairing of incoming & outgoing VCB at sub station bheempur doraha.

Download

09.06.2014
16/edd/debai/2014-15 EDD DEBAI Replacement of damaged parts & repairing of incoming & outgoing VCB at sub station kali nadi.

Download

09.06.2014
15/edd/debai/2014-15 EDD DEBAI Replacement of damaged parts & repairing of incoming & outgoing VCB at sub station chatari.

Download

09.06.2014
14/edd/debai/2014-15 EDD DEBAI Replacement of damaged parts & repairing of incoming & outgoing VCB at sub station balon & dharampur.

Download

09.06.2014
13/edd/debai/2014-15 EDD DEBAI Replacement of damaged parts & repairing of incoming & outgoing VCB at sub station ahmadgarh.

Download

09.06.2014
12/edd/debai/2014-15 EDD DEBAI Replacement of damaged parts & repairing of incoming & outgoing VCB at sub station bheemapur.

Download

09.06.2014
11/edd/debai/2014-15 EDD DEBAI Replacement of damaged parts & repairing of incoming & outgoing VCB at sub station narora.

Download

09.06.2014
05/2014-15 EDD MZN Transportation and establishment of incoming & outgoing VCB.

Download

10.06.2014
04/2014-15 EDD MZN Establishment of 33kv VCB at power transformer.

Download

10.06.2014
03/2014-15 EDD MZN Repairing of VCB and damaged packing, seal, bushing at sub station jasoi and lalukhedi.

Download

10.06.2014
02/2014-15 EDD MZN Repairing of VCB at sub station nirmana.

Download

10.06.2014
03/2014-15 ETD SHAMLI Req. of diesel vehicle with driver.

Download

01.07.2014
06/EDDG/2014-15 EDD GARH Supply of diff type exposi cast CT.

Download

07.06.2014
10/W/201-15 EDD MODINAGAR Req. of assistant for call attending work.

Download

06.06.2014
09/W/201-15 EDD MODINAGAR Loading & establishment of transformer.

Download

06.06.2014
08/W/201-15 EDD MODINAGAR Earthling of power transformer & incoming.

Download

06.06.2014
07/W/201-15 EDD MODINAGAR Construction of new  11kv line.

Download

06.06.2014
T-04/2014-15 EDD-I MBD Shifting of electric line.

Download

23.06.2014
06/2014-15 EDC AMROHA Maintenance work of 33/11kv feeder from sub station said nagli(dhakka).

Download

21.06.2014
05/2014-15 EDC AMROHA Operational work of sub station said nagli(dhakka).

Download

21.06.2014
07/2014-15 EDD MZN Maintenance work of 11kv feeder from sub station sohjani tagaan.

Download

07.06.2014
06/2014-15 EDD MZN Operational work of sub station sohjani tagaan.

Download

07.06.2014
PVVNL-MT/RGGVY-II/04/2014-15 PVVNL RGGVY Work of creation of Rural Electricity Infrastructure and Rural Household Electrification under Rajiv Gandhi Grameen Vidyutikaran Yojana (RGGVY PHASE-II) 12th Plan on Turnkey Basis for Meerut district.

NIT

Tender Doc

Amendment

Corrigendum

31.07.2014
122/W/2013-14 EDC SRE Establishment of 25kva transformer.

Download

03.06.2014
50/2014-15 EUDD-II MRT Supply of 12volt exide or aqua battry.

Download

03.06.2014
05/2014-15 ECDD SRE Req. of diesel vehicle with driver for ecdsd mzn.

Download

30.06.2014
04/2014-15 ECDD SRE Req. of diesel vehicle with driver for ecdsd sre.

Download

30.06.2014
03/2014-15 ECDD SRE Req. of diesel vehicle with driver for ecdd sre.

Download

30.06.2014
02/2014-15 ECDD SRE Supply of 8500 OPC cement sacks.

Download

30.06.2014
11/2014-15 EDD DHAMPUR Establishment of 63kva transformer & LT line.

Download

23.06.2014
05/2014-15 EDD DHAMPUR Construction of extra pole at various sub station.

Download

23.06.2014
04/2014-15 EDD DHAMPUR Establishment of 25kva transformer and construction of extra pole.

Download

23.06.2014
03/2014-15 EDD DHAMPUR Replacement of damaged cable and capacity increment work.

Download

23.06.2014
06/2014-15 EUDD-III NOIDA Construction of double pole in sec-168 and 162.

Download

03.06.2014
05/2014-15 EUDD-III NOIDA Construction of double pole in sec-15 and 07.

Download

03.06.2014
04/2014-15 EUDD-III NOIDA Construction of double pole in sec-19,27 and 142..

Download

03.06.2014
03/2014-15 EUDD-III NOIDA Construction of double pole in sec-44,45 and 27.

Download

03.06.2014
03/2014-15 EDD-IV NOIDA Maintenance and operation of 11kv feeder & sub station jewar, bankapur & jahangeerpur.

Download

12.06.2014
02/2014-15 EDD-IV NOIDA Maintenance and operation of 11kv feeder & sub station dankor, mandishyam nagar & rabupura.

Download

12.06.2014
01/2014-15 EDD-IV NOIDA Maintenance and operation of 11kv & chipiyana feeder.

Download

12.06.2014
T-08/2014-15 ETD GZB Repairing of damaged oil PT with housing.

Download

23.06.2014
34/W/2014-15 EDD-III MRT Req. of gang for maintenance of 11kv feeder from sub station ukhaleena.

Download

02.06.2014
33/W/2014-15 EDD-III MRT Req. of gang for maintenance of 11kv feeder from sub station raghunathpur.

Download

02.06.2014
32/W/2014-15 EDD-III MRT Req. of gang for maintenance of 11kv feeder from sub station rohta.

Download

02.06.2014
31/W/2014-15 EDD-III MRT Req. of gang for maintenance of 11kv feeder from sub station kaithwadi.

Download

02.06.2014
30/W/2014-15 EDD-III MRT Req. of gang for maintenance of 11kv feeder from sub station bhola.

Download

02.06.2014
29/W/2014-15 EDD-III MRT Req. of gang for maintenance of 11kv feeder from sub station sivaya.

Download

02.06.2014
28/W/2014-15 EDD-III MRT Req. of gang for maintenance of 11kv feeder from sub station pallavpuram phase-ii.

Download

02.06.2014
27/W/2014-15 EDD-III MRT Req. of gang for maintenance of 11kv feeder from sub station pallavpuram phase-i.

Download

02.06.2014
11/W/2014-15 EDD PILKHUA Establishment of 08mva transformer.

Download

05.06.2014
10/W/2014-15 EDD PILKHUA Replacement of VCB & cable.

Download

05.06.2014
09/W/2014-15 EDD PILKHUA Diff work under business plan/improvement scheme/M&R/R&R.

Download

05.06.2014
08/W/2014-15 EDD PILKHUA Works related to line & cubical of sub station jindala nagar.

Download

05.06.2014
04/2014-15 ECDD GZB Special repairing of eudd-vii gzb office building.

Download

04.06.2014
PVVNL-MT/05(S) /2014-15 Material Management

Supply of 10000 nos. 11 Mtr. Steel Tubular Pole, (SP-55).

Download

12.06.2014
11/W/2014-15 EUDD-II NOIDA Construction of line and related work for release 3500kva electric load connection.

Download

03.06.2014
10/W/2014-15 EUDD-II NOIDA Construction of double pole and related work in sec-29 and 37.

Download

02.06.2014
09/W/2014-15 EUDD-II NOIDA Construction of double pole and related work in sec-39,40,41 and 49.

Download

07.06.2014
08/W/2014-15 EUDD-II NOIDA Construction of double pole and related work in sec-31,50 and 51.

Download

02.06.2014
07/W/2014-15 EUDD-II NOIDA Construction of double pole and related work in sec-110,82 and 31.

Download

02.06.2014
05/W/2014-15 EUDD-V NOIDA Construction of Lt sub station in sec-08,56 and 21.

Download

05.06.2014
04/W/2014-15 EUDD-V NOIDA Construction of Lt sub station in sec-46,55 and 11.

Download

05.06.2014
03/W/2014-15 EUDD-V NOIDA Construction of Lt sub station in sec-46.

Download

05.06.2014
02/W/2014-15 EUDD-V NOIDA Construction of Lt sub station in sec-48 and 47.

Download

05.06.2014
01/W/2014-15 EUDD-V NOIDA Construction of Lt sub station in sec-48.

Download

05.06.2014
06/W/201-15 EDD MODINAGAR Replacement of damaged line and breaked pole.

Download

03.06.2014
05/W/2014-15 EDD MODINAGAR Replacement of CT PT unit.

Download

03.06.2014
04/W/2014-15 EDD MODINAGAR Works of water level earthling.

Download

03.06.2014
03/S/2014-15 EDD MODINAGAR Supply of diff type tape rubber sheet, LT clamp cork sheet.

Download

03.06.2014
02/S/2014-15 EDD MODINAGAR Supply of aluminum crimping lugs.

Download

03.06.2014
T-09/2014-15 ETD GZB Req. of diesel vehicle with driver.

Download

23.06.2014
T-07/2014-15 ETD GZB Supply of 33kv single phase out door type oil filled CT.

Download

21.06.2014
16/2014-15 EUDD-IV GZB Establishment of 250kva transformer.

Download

13.06.2014
15/2014-15 EUDD-IV GZB Repairing of fault of 33/11kv underground cable of lajpat  nagar.

Download

13.06.2014
14/2014-15 EUDD-IV GZB Repairing of fault of 33/11kv underground cable of mohan nagar.

Download

13.06.2014
13/2014-15 EUDD-IV GZB Repairing of fault of 33/11kv underground cable of rajendra nagar.

Download

13.06.2014
03/2014-15 EUDD-IV GZB Earthling of diff capacity transformer in sub div-iii lajpat nagar.

Download

11.06.2014
02/2014-15 EUDD-IV GZB Earthling of diff capacity transformer in sub div-ii mohan nagar.

Download

11.06.2014
01/2014-15 EUDD-IV GZB Earthling of diff capacity transformer in sub div-i rajendra nagar.

Download

11.06.2014
03/W/EUDD/VII/14-15 EUDD-VII GZB Req. of 7.5kwatt capacity generator set.

Download

17.06.2014
05/2014-15 ECDD GZB Req. of 4rth class employee.

Download

23.06.2014
35/2013-14 EUDD-II MBD Shifting of line & pole.

Download

29.05.2014
06/2014-15 EDD-IV NOIDA Works of attending of emergency breakdown of 33kv,11kv & LT line.