1 1175/ 21.03.13 Providing 12 Nos. 10 KVA S/P Transformer in HVDS system village Tigri. 489/ 12-13 3.765 1.140 4.905
2 1469/ 25.04.13 Transfer of load of A-Block, Sector-122 on feeder No. 5 from feeder No. 6 to avoid overloading 12/ 2013-14 2.170 0.385 2.555
3 1469/ 25.04.13 Transferring the feeder no. 7 of 33/11 KV S/S, Sector-72, to 33/11 KV S/S sector-52, to avoid overloading of 10 MVA T/F No. 2 at 33/11 KV S/S Sector-72 13/ 2013-14 3.812 1.268 5.080
4 1105/ 22.03.13 Construction of 100 KVA S/S DP with HT and LT link line in village DATAWALI under 33/11 KV S/S KOT 483/ 12-13 2.722 0.500 3.222
5 1175/ 21.03.13 Replacement of old & damaged ACSR weasel in village Akilpur Jagir 467/ 12-13 0.473 0.150 0.623
6 1683/ 15.05.13 I/C of Transformer 25-100 KVA including strengthening of LT System in Village Roza Yaqoobpur. 44/ 13-14 1.647 0.300 1.947
7 1597/ 04.05.13 Strengthening & rearrangement of LT line in village Usmanpur. 432/ 12-13 2.336 1.660 3.996
8 1597/ 04.05.13 Bifircation of load from existing overloaded 100 KVA T/F to newly proposed 100 KVA T/F at village Nagla Jhanu, Rabupura 533/ 12-13 2.237 0.384 2.621
9 1597/ 04.05.13 Bifircation of load from existing overloaded 63 KVA T/F to newly proposed 100 KVA T/F at village Jamalpur, Mandi Shyam Nagar 540/ 12-13 1.753 0.160 1.913
10 1683/ 15.05.13 Bifircation of load existing overloaded 100 KVA T/F to newly proposed 100 KVA T/F at village Dola Rajpura 40/ 13-14 2.604 0.500 3.104
11 1940/ 07.06.13 Construction of 100 KVA S/S DP along with HT and LT link line village, YUSUFPUR CHAK SABERI, Dadri 82/ 13-14 4.781 0.800 5.581
12 1863/ 03.06.13 Providing 100 KVA T/F on existing DP in LT link line to avoid overloading of T/F in village Khera Dharmpura Dadri 75/ 13-14 1.897 0.150 2.047
13 1195/ 24.04.13 xkWo HkkbZiqj esa ,p0Vh0 ,oa ,y0Vh0 ykbZu ds lqn`<+hdj.k dk dk;ZA 320/  12-13 1.684 1.320 3.004
14 710/ 23.02.13 Strengthening of HT/LT line in village DATAWALI 433/ 12-13 1.961 1.350 3.311
15 1798/ 28.05.13 Rearrangement of supply of village Bailana from Parsol Feeder of Dankaur S/S instead of Mandi shyam nagar S/S 70/ 13-14 4.817 2.700 7.517
16 1933/ 06.06.13 Construction of 100 KVA S/S DP along with HT and LT link line village, Dhanv Vash, Dadri 79/ 13-14 2.216 0.300 2.516
17 171/ 14.01.13 Providing 5 Nos. 10 KVA S/P 11/0.23 KV T/F in HVDS village Chindrawali 352/ 12-13 1.258 0.195 1.453
18 1597/ 04.05.13 Providing 4 Nos. 10 KVA S/Phase T/F in HVDS village Dhanpura Rabupura 378/ 12-13 0.870 0.354 1.224
19 1597/ 04.05.13 Providing 4 Nos. 10 KVA S/Phase T/F in HVDS village Mayana Rabupura 379/ 12-13 0.870 0.354 1.224
20 1597/ 04.05.13 Providing 5 Nos. 10 KVA S/Phase 11/0.23KV Pran Forman in HVDS village Fazalpur 470/ 12-13 1.247 0.200 1.447
21 1597/ 04.05.13 Providing 1 Nos. S/P Pole Mounted T/F to reduce long cable & avoid fatar accident near by Chamad Road, Rabupura 508/ 12-13 0.255 0.055 0.310
22 2425/ 10.07.13 Construction of 100 KVA new S/S and LT line in village Dairry Scanner. 138/ 13-14 1.699 0.200 1.899
23 2546/ 17.07.13 I/C of T/F from 25 KVA to 63 KVA of Village MILAK DHANORI, S/S Dankaur. 147/ 13-14 0.560 0.050 0.610
24 2709/ 27.07.13 I/C of T/F from 63 KVA to 100 KVA including LT link line and shifting of DP situated inside pond to along road side at village HATHI PUR KHERA  158/ 13-14 0.776 0.490 1.266
25 2650/ 25.07.13 Construction of transformer from 63 KVA to 100 KVA of SC Basti Village DURRIYAI DADRI. 156/ 13-14 0.335 0.089 0.424
26 2650/ 25.07.13 Construction of 25 KVA S/S DP along with LT link line in village DURRIYAI on Main Road. 155/ 13-14 0.785 0.230 1.015
27 1706/ 17.05.13 Construction of 11 KV line for split of Gopalgarh feeder, 33/11 KV S/S Jewar. 45/ 13-14 9.241 8.895 18.136
28 428/ 02.02.13 uo fuekZ.k 11 dsoh ljy QhMj tsoj 368/  12-13 6.349 0.933 7.282
29 428/ 02.02.13 vfrHkkfjrk ds dkj.k tsoj esa u;k QhMj cukukA 369/  12-13 8.876 9.387 18.263
30 2710/ 27.07.13 Strengthening of 100 KVA S/S DP to Devide load of Existing T/F in village DURRIYAI 160/ 13-14 1.432 0.490 1.922
31 428/ 02.02.13 Providing 3 Nos. 400 KVA LT S/S with lines instead of 1000 KVA S/S at Moh. Dauji, Jewar 363/ 12-13 10.726 6.250 16.976
32 1597/ 04.05.13 I/C of T/F from 100 KVA to 250 KVA of Village Harijan Basti Chhapraula. 469/ 12-13 1.804 0.300 2.104
33 1857/ 01.06.13 I/C of Existing overloaded 100 KVA T/F to newly proposed 250 KVA T/F at village Kheda Parsol. 73/ 13-14 1.774 0.350 2.124
34 171/ 14.01.13 Providing 5 Nos. 10 KVA S/P 11/0.23 KV T/F in HVDS village Thasrana, Mandi Shyam Nagar 353/ 12-13 1.258 0.195 1.453
35 2975/ 19.08.13 Bifercation of load from 63 KVA T/F to newly proposed 63 KVA T/F at village Gadana S/S Mandi Shyam Nagar 188/ 13-14 2.137 0.620 2.757
36 1597/ 04.05.13 xzke 'kkgiqj esa 25 dsoh, ls 100 dsoh, ifjorZd yxkukA 513/ 12-13 1.271 0.246 1.517
37 1597/ 04.05.13 xzke eqejstiqj esa vfrHkkfjrk ds dkj.k 25 dsoh, ls 100 dsoh, ifjorZd yxkukA 514/ 12-13 1.271 0.246 1.517
38 1597/ 04.05.13 xzke eaxjkSyh esa 63 dsoh, u;s ifjorZd dh LFkkiukA 517 12-13 1.135 0.302 1.437
39 1597/ 04.05.13 xzke xksfoUnx< esa vfrHkkfjrk ds dkj.k 63 dsoh, u;s ifjorZd dh LFkkiukA 518/ 12-13 1.052 0.352 1.404
40 4485/ 27.09.13 Maint. Of 33/11 KV S/S area of EUDD-III, Noida 270/ 13-14 5.524 10.639 16.163
41 4485/ 27.09.13 Maint. Of 33/11 KV S/S area of EDD-IV, Noida 271/ 13-14 2.496 18.956 21.452
42 4488/ 27.09.13 xkWo ohjeiqj esa vfrHkkfjrk ds dkj.k ,d 100 dsoh, ,y0Vh0 lc&LVs'ku dk fuekZ.kA 275/ 13-14 2.099 0.326 2.425
43 3096/ 29.08.13 Construction of 100 KVA S/S D/P along with HT/LT link line in village- DURRIYAI 223/ 13-14 2.185 0.589 2.774
44 4364/ 21.09.13 xkWo fclukSyh esa rkykc ds fudV 250 dsoh, ifjorZd ua0&1 ds ttZj rkj o [kEHksa cnyuk ,oa nq?kZVuk cpko gsrq feM Liku esa [kEHksa yxkukA 264/ 13-14 3.635 1.418 5.053
45 2981/ 19.08.13 Strengthening of 11 KV Line of Gopal Ghar Feeder under 33/11 KV S/S Jewar 173/ 13-14 2.024 1.600 3.624
46 2981/ 19.08.13 xzke vykojiqj esa vfrHkkfjrk ds dkj.k {kerko`f) 63 dsoh, ls 100 dsoh, djukA 175/ 13-14 0.758 0.190 0.948
47 1597/ 04.05.13 Providing 4 Nos. 10 KVA S/Phase T/F in HVDS village Siroli Banger Rabupura 380/ 12-13 0.870 0.354 1.224
48 1597/ 04.05.13 Providing 4 Nos. 10 KVA S/Phase T/F in HVDS village Chakvirampur Rabupura 381/ 12-13 0.870 0.354 1.224
49 4692/ 10.10.13 I/C of T/F from 63 KVA to 100 KVA at village Fareedpur, S/S Mandi Shyam Nagar.  294/ 13-14 0.296 0.079 0.375
50 2711/ 27.07.13 Strengthening of 11 Rural Feeder of 33/11 KV S/S BISHNOLI 161/ 13-14 6.508 3.230 9.738
51 4958/ 01.11.13 I/C of T/F from 25 KVA to 63 KVA of village Nagla Bhatona under 33/11 KV S/S Rabupura. 324/ 13-14 0.563 0.068 0.631
52 2981/ 19.08.13 xzke Hkoksdjk esa 25 dsoh, ifjorZd dh txg 63 dsoh, yxkukA 169/ 13-14 0.568 0.064 0.632
53 4131/ 04.09.13 xzke HkxoUriqj esa vfrHkkfjrk ds dkj.k {kerko`f) 25 dsoh, ls 63 dsoh, djukA 245/ 13-14 0.580 0.065 0.645
54 4488/ 27.09.13 xkWo ewWgQkM esa vfrHkkfjrk ds dkj.k 63 dsoh, fo|qr miLFkku ,oa lqn`<hdj.k dk dk;ZA 274/ 13-14 2.623 1.485 4.108
55 4750/ 17.10.13 Replacement of Line Isolator and providing new 33 KV VCB at 33/11 KV S/S Sector-18 (Old) Noida 304/     13-14 5.261 1.567 6.828
56 5249/ 21.11.13 xzke 'kkgiqj midsUnz tgkWxhjiqj esa vfrHkkfjrk] oksYVst ,oa fo|qr pksjh ds dkj.k 25 dsoh, ifjorZd dh LFkkiukA 348/ 13-14 0.675 0.300 0.975
57 954/ 12.03.13 Providing single phase 16 KVA T/F S/S for HVDS system in Rural Area for village Mandal Pur (Jewar) 473/ 11-12 1.185 0.080 1.265
58 954/ 12.03.13 [kqtkZ jksM+ tsoj esa 100 ls 250 dsoh, dh {kerko`f) djukA 505/ 11-12 2.282 0.340 2.622
59 4485/ 27.09.13 Maint. Of 33/11 KV S/S area of EUDD-I, Noida 268/ 13-14 24.409 32.261 56.670
60 4485/ 27.09.13 Maint. Of 33/11 KV S/S area of EUDD-II, Noida 269/ 13-14 11.376 24.917 36.293
61 4485/ 27.09.13 Maint. Of 33/11 KV S/S area of EUDD-V, Noida 272/ 13-14 13.614 32.757 46.371
62 5345/ 28.11.13 Replacement of 11 KV I/C & O/G S/G with B/C at S/S, Sector-62A, Noida. 430/ 11-12 20.957 0.700 21.657
63 428/ 02.02.13 vfrHkkfjr ifjorZd dh {kerko`f)] ih,plh tsoj 100 dsoh, ls 250 dsoh, djukA 373/ 12-13 1.752 0.420 2.172
64 1681/ 15.05.13 Strengthening of 11 KV line of village Ibrahimpur (Jahangirpur) 25/ 13-14 3.936 1.690 5.626
65 5509/ 05.12.13 xzke cuokjh okl esa vfrHkkfjrk ds dkj.k 04 ux 10 dsoh, ,l@ih ifjorZd LFkkiuk 33@11 dsoh miLFkku cadkiqjA 342/ 13-14 1.759 0.500 2.259
66 5580/ 07.12.13 vfrHkkfjrk ds dkj.k ,pohMh,l xzke fd'kksjiqj esa 10 dsoh, ,l@ih ifjorZdksa dh LFkkiuk djukA 386/ 13-14 1.138 0.124 1.262
67 5579/ 07.12.13 eqfLye cLrh tgkWxhjiqj esa 250 dsoh, ifjorZd ls ttZj ,y0Vh0 ykbZu dk ohty rkj cnydj jsfcV rkj yxkukA 391/ 13-14 0.277 0.156 0.433
68 5579/ 07.12.13 vfrHkkfjr 100 dsoh, ls 250 dsoh, ifjorZd yxkus ds fy, Mcy lfdZV ,oa ttZj rkj cnyuk dLck tgkWxhjiqjA  387/ 13-14 1.105 0.793 1.898
69 5579/ 07.12.13 cl LVs.M tgkWxhjiqj esa fLFkr 400 dsoh, ifjorZd ls ttZj ,y0Vh0 ykbZu dk ohty rkj cnydj jsfcV rkj yxkukA 390/ 13-14 0.450 0.250 0.700
70 5579/ 07.12.13 vfrHkkfjr 100 dsoh, ls 250 dsoh, ifjorZd LFkkiuk dLck tgkWxhjiqj fudV ikuh dh VadhA 388/ 13-14 3.467 1.054 4.521
71 5579/ 07.12.13 xSl ,tsUlh ds fudV tgkWxhjiqj esa 250 dsoh, ifjorZd ls ttZj ,y0Vh0 ykbZu dk ohty rkj cnydj jsfcV rkj yxkukA 389/ 13-14 0.284 0.126 0.410
72 5579/ 07.12.13 Construction of New 11 KV Udaipur feeder to avoid over loading of Nekpur feeder of 33/11 KV S/S Janhangirpur. 392/13-14 16.137 3.972 20.109
73 5578/ 07.12.13 Construction of 100 KVA S/S DP along with H.T. and L.T. link line in Village- Chhaysa under 33/11 KV S/S Kot. 382/ 13-14 2.448 0.917 3.365
74 5586/ 09.12.13 For Increasing Capacity Transformers 63 KVA to 100 KVA of Village Nagla Hukam Singh S/S Rabupura. 374/ 13-14 0.338 0.078 0.416
75 1597/ 04.05.13 Construction of Double Pole with 100 KVA LT/S/S in village Rampur Jewar 418/ 12-13 2.243 0.450 2.693
76 428/ 02.02.13 VIiy jksM+ tsoj esa ,d 100 dsoh, dk miLFkku ,oa ykbZu cukukA 370/ 12-13 4.022 0.544 4.566
77 428/ 02.02.13 nfyr cLrh jkeiqj ckaxj esa 100 dsoh, u;s fo|qr miLFkku dk fuekZ.kA 367/ 12-13 2.302 0.350 2.652
78 1597/ 04.05.13 xzke f'kokjk esa u;s ifjorZd 10 dsoh, ,l@ih yxkukA 424/ 12-13 0.658 0.250 0.908
79 1597/ 04.05.13 xzke esgUnhiqj esa ttZj ykbZu Bhd djkuk ,oa 10 dsoh, ifjorZd dh LFkkiukA 515/ 12-13 0.814 0.659 1.473
80 5510/ 05.12.13 fo|qr pksjh jksdus ds fy, 25 dsoh, ifjorZd cnyukA 373/ 13-14 0.458 0.296 0.754
81 4901/ 29.10.13 xzke jkeiqj ckaxj esa ekS0 nfyr cLrh esa 63 dsoh, dh LFkkiukA 319/ 13-14 2.037 0.450 2.487
82 1597/ 04.05.13 xzke Fkksjk Vkmu esa vfrHkkfjr 63 dsoh, ls 100 dsoh,  {kerko`f) djukA 428/ 12-13 0.916 0.060 0.976
83 2808/ 03.08.13 xzke&ekSj esa vfrHkkfjr 25 dsoh, ls 63 dsoh, ifjorZd LFkkiuk djukA 164/ 13-14 1.122 0.068 1.190
84 4692/ 10.10.13 Strengthening of LT line in village Chiti S/S Mandi Shyam Nagar. 300/ 13-14 0.442 0.994 1.436
85 4746/ 17.10.13 xzke >qIik esa ttZj rkj ,oa [kEcsa cnyukA 309/13-14 0.316 0.230 0.546
86 1597/ 04.05.13 Strengthening of LT Line of Ranhera branch of Khazpur feeder of S/S Bankapur. 521/12-13 1.946 1.359 3.305
87 1706/ 17.05.13 xzke ekWMyiqj ,pohMh,l xzke dk lqn`<hdj.k ttZj ykbZu ,oa iksy xkfMZx djukA 46/ 13-14 2.591 1.258 3.849
88 4488/ 27.09.13 220@132@33 dsoh fo|qr miLFkku tks[kkckn ls e.Mh ';ke uxj rd dh 33 dsoh ykbZu ds ttZj rkj cnyukA 273/ 13-14 2.092 1.124 3.216
89 2223/ 29.06.13 Replacement of old & damage ACSR weasel conductor of LT line Strengthening of LT line in village New Haivatpur, Dadri. 107/ 13-14 1.526 0.700 2.226
90 5511/ 05.12.13 11 dsoh uhedk QhMj dh LVªsfUFkax ttZj ykbZu dks Bhd djuk rFkk jksM ds fdukjs dj jsfcV rkj yxkukA 377/ 13-14 4.315 2.696 7.011
91 2929/ 14.08.13 Construction of 100 KVA S/S along with line in village Sainthali. 185/ 13-14 2.938 0.939 3.877
92 5806/ 21.12.13 LVªsfUFkax 11 dsoh xksBuh QhMj 33@11 dsoh midsUnz tgkWxhjiqjA 380/ 13-14 5.311 2.418 7.729
93 5881/ 26.12.13 vfrHkkfjrk ds dkj.k 33@11 dsoh miLFkku cadkiqj dh dsfcyksa dk cnyukA 418/ 13-14 1.708 0.837 2.545
94 5881/ 26.12.13 vfrHkkfjrk ds dkj.k 33@11 dsoh miLFkku tgkWxhjiqj dh dsfcyksa dk cnyukA 419/ 13-14 1.465 0.829 2.294
95 5881/ 26.12.13 fo|qr O;o/kku ds dkj.k 25 dsoh ifjorZd dks jkLrs ij yksus ds fy, xzke&uxyk pkWnu ektjk djkSyh ckaxjA 415/ 13-14 0.044 0.162 0.206
96 5881/ 26.12.13 vfrHkkfjrk ds dkj.k ,p0oh0Mh0,l0 xzke&mlekuiqj esa 16 dsoh, flaxy Qst ifjorZd yxkukA  409/ 13-14 1.117 0.155 1.272
97 5881/ 26.12.13 vfrHkkfjrk ds dkj.k ,p0oh0Mh0,l0 xzke&pd uxfy;k esa 16 dsoh, flaxy Qst ifjorZd yxkukA  410/ 13-14 1.117 0.155 1.272
98 5881/ 26.12.13 vfrHkkfjrk ds dkj.k ,p0oh0Mh0,l0 xzke&Niuk Vkmu esa 16 dsoh, flaxy Qst ifjorZd yxkukA  411/ 13-14 1.117 0.155 1.272
99 5881/ 26.12.13 vfrHkkfjrk ds dkj.k ,p0oh0Mh0,l0 xzke&uSdiqj esa 16 dsoh, flaxy Qst ifjorZd yxkukA  412/ 13-14 1.117 0.155 1.272
100 5881/ 26.12.13 vfrHkkfjrk ds dkj.k ,p0oh0Mh0,l0 xzke&xkSBuh esa 16 dsoh, flaxy Qst ifjorZd yxkukA  413/ 13-14 1.117 0.155 1.272
101 4208/ 10.09.13 iz.kkyh lq/kkj ;kstuk ,pohMh,l xzke uxyk catkjk esa 10 dsoh, ifjorZd LFkkfir djukA 54/ 13-14 1.922 1.530 3.452
102 5881/ 26.12.13 vfrHkkfjrk ds dkj.k ,p0oh0Mh0,l0 xzke&dyk[kqjh esa 16 dsoh, flaxy Qst ifjorZd yxkukA  414/ 13-14 1.496 0.916 2.412
103 5881/ 26.12.13 vfrHkkfjrk ds dkj.k 63 dsoh, ds lkFk 25 dsoh, ifjorZd dh LFkkiuk ,oa jksM+ ØkWflax vkfn Viiy jksM+] tsojA 416/ 13-14 2.854 1.474 4.328
104 5881/ 26.12.13 xzke jk;iqj ihiyh esa 100 dsoh, ifjorZd dh LFkkiukA 417/ 13-14 2.899 0.828 3.727
105 2113/ 20.06.13 Bifurcation of load from existing overloaded 1000 KVA T/F to newly proposed 250 KVA T/F at Bhaipur Road, Rabupura. 103/ 13-14 4.220 0.600 4.820
106 171/ 14.01.13 Providing 5 Nos. 10 KVA S/P 11/0.23 KV T/F in HVDS village Mayche ki Madiya, Mandi Shyam Nagar. 355/ 12-13 1.258 0.195 1.453
107 171/ 14.01.13 Providing 5 Nos. 10 KVA S/P 11/0.23 KV T/F in HVDS village Madappa, Mandi Shyam Nagar. 351/ 12-13 1.258 0.195 1.453
108 171/ 14.01.13 Providing 5 Nos. 10 KVA S/P 11/0.23 KV T/F in HVDS village RONI URF SALONI, Mandi Shyam Nagar. 354/ 12-13 1.258 0.195 1.453
109 5882/ 26.12.13 Estimate for Strangthening of 33 KV line in between neemka gool to Madal Pur under Jewar. 425/ 13-14 5.089 3.549 8.638
110 5882/ 26.12.13 33 dsoh ykbZu dks 132 dsoh lc&LVs'ku tgkWxhjiqj ls 33@11 dsoh lcLVs'ku tgkWxhjiqj dks tqMokukA 422/ 13-14 2.209 1.738 3.947
111 5880/ 26.12.13 xzke dyk[kqjh ,p0oh0Mh0,l0 xzke dh LVªssafFkx ,oa ttZj rkj cnyukA 430/ 13-14 3.676 2.560 6.236
112 5880/ 26.12.13 LVªsafFkx 11 dsoh n;ksjkj QhMj dh ykbZu esa chp&chp esa vf/kd nwjh ds dkj.k iksy yxkukA 428/ 13-14 6.429 2.612 9.041
113 5880/ 26.12.13 jkeiqj 11 dsoh jkeiqj ,oa dkuhxM+h czkUpksa dh LVªsafFkx dk dk;ZA 429/ 13-14 5.973 2.374 8.347
114 5880/ 26.12.13 dLck tsoj esa iw.kZ 11 dsoh ykbZu dh LVªsafFkx ,oa xkfMZx djkukA 424/ 13-14 5.774 2.958 8.732
115 5880/ 26.12.13 xzke jk;iqj ihiyh esa LVªsafFkx vf/kd nwfj;ksa ij yxs [kEcksa ds chp&chp esa u;s [kEcs yxkuk rFkk rkj vkfn yxkus dk dk;ZA 427/ 13-14 6.416 4.093 10.509
116 5879/ 26.12.13 11 dsoh lkokSrk :jy QhMj dk uo fuekZ.kA 420/ 13-14 8.939 3.504 12.443
117 5879/ 26.12.13 vfrHkkfjrk ds dkj.k u;s fpaxjkoyh QhMj dk fuekZ.k djkukA 421/ 13-14 5.738 3.008 8.746
118 4692/ 10.10.13 Strengthening of LT Mains & Construction of new line to avoid lengthy cable at village Fareedpur, S/S Mandi Shyam Nagar.  299/ 13-14 0.894 0.130 1.024
119 5478/ 04.12.13 33@11 dsoh miLFkku oadkiqj ij ttZj oh0lh0ch0 cnyukA 218/ 13-14 16.910 3.090 20.000
120 5478/ 04.12.13 33@11 dsoh miLFkku tsoj ij ttZj oh0lh0ch0 cnyukA 217/ 13-14 4.990 0.906 5.896
121 2981/ 19.08.13 tsoj esa 'kgjh {ks= ls futh uydwiksa dks vyx djus gsrq 25 dsoh, ifjorZd dh LFkkiuk djukA 182/ 13-14 0.789 0.255 1.044
122 2981/ 19.08.13 xzke eksgcyhiqj VkÅu ds 63 dsoh, ifjorZd ls uydwiksa dks vyx djus gsrq 25 dsoh, ifjorZd dh LFkkiuk djukA 176/ 13-14 0.819 0.260 1.079
123 057/ 04.01.14 For Construction of 100 KVA S/S DP along with H.T. link Line of Vill-Gulawati Khurd, Dadri. 432/ 13-14 2.697 0.850 3.547
124 2981/ 19.08.13 xzke xksBuh esa vfrHkkfjrk ds dkj.k ,d u;k 25 dsoh, ifjorZd yxkukA 171/ 13-14 0.837 0.278 1.115
125 2981/ 19.08.13 ,pohMh,l xkWo lkckSrk esa vfrHkkfjrk ds dkj.k 10 dsoh, ,l@ih ifjorZd yxkukA 180/ 13-14 1.033 0.218 1.251
126 2981/ 19.08.13 ,pohMh,l xkWo dkuiqj esa vfrHkkfjrk ds dkj.k 10 dsoh, ,l@ih ifjorZd yxkukA 178/ 13-14 0.797 0.141 0.938
127 2981/ 19.08.13 xzke iwju uxj esa 25 dsoh, ifjorZd dh LFkkiuk ,oa vU; dk;ZA 177/ 13-14 1.004 0.893 1.897
128 011/ 01.01.13 Construction of D/P with 100 KVA LT S/S Village Thora Tower S/S Bankapur. 281/ 12-13 2.637 0.530 3.167
129 428/ 02.02.13 vfrHkkfjrk ds dkj.k ekS0 pkeM okyk tsoj esa 63 ls 250 dsoh, dh {kerko`f) djukA 371/ 12-13 2.636 0.420 3.056
130 428/ 02.02.13 uhedk Vkmu esa 100 ls 250 dsoh, dh {kerko`f) djukA 374/ 12-13 1.752 0.420 2.172
131 1597/ 04.05.13 cadkiqj Vkmu ,pohMh,l dks ,d gh QhMj ls ykbZu cukdj djukA 516/ 12-13 0.770 0.338 1.108
132 2715/ 27.07.13 Providing 05 Nos. 10 KVA S/Phase T/F in village Anwar Garh, Dankaur. 148/ 13-14 1.852 0.270 2.122
133 4120/ 04.09.13 Construction of 100 KVA S/S DP at village Tirthali, Rabupura for Bifercation of load of 100 KVA T/F.  199/ 13-14 1.933 0.600 2.533
134 2715/ 27.07.13 Providing 05 Nos. 10 KVA S/Phase T/F in village Kherli Bhav, Dankaur. 149/ 13-14 1.852 0.270 2.122
135 2715/ 27.07.13 Providing 04 Nos. 10 KVA S/Phase T/F in village Niloni Shahpur, Dankaur. 150/ 13-14 1.482 0.216 1.698
136 3098/ 29.08.13 Bifurcation of load of existing 11 KV Kasana feeder to existing 11 KV Kisan feeder at village Jamalpur, Mandi Shyam Nagar. 230/ 13-14 1.708 2.153 3.861
137 2981/ 19.08.13 Construction of D/P  with 25 KV T/F in village Bhutghari. 181/ 13-14 0.937 0.850 1.787
138 4568/ 30.09.13 xzke&tsoj esa 33 dsoh ykbZu dh dsfcy MkyukA 283/ 13-14 2.470 1.147 3.617
139 4568/ 30.09.13 xzke x<+h esa vfrHkkfjrk ds dkj.k ,pohMh,l ds 04 ux 10 dsoh, ,l@ih ifjorZd LFkkiuk djukA 282/ 13-14 1.831 0.307 2.138
140 4568/ 30.09.13 'kgjh QhMj {ks= ls futh uydwiksa dks xzkeh.k QhMj ij cnyus ds fy, 25 dsoh, Mh@ih dh LFkkiuk djukA 281/ 13-14 0.939 0.263 1.202
141 4568/ 30.09.13 xzke Hkoksdjk esa vfrHkkfjrk ,oa oksYVst leL;k ds dkj.k 25 dsoh, ifjorZd dh LFkkiuk djukA 286/ 13-14 0.747 0.280 1.027
142 4568/ 30.09.13 xzke ykSnksuk esa vfrHkkfjrk ds dkj.k 63 dsoh, ls 100 dsoh, {kerko`f) djukA 285/ 13-14 0.632 0.460 1.092
143 1597/ 04.05.13 Strengthening of LT line in village Derin Gujran Dankaur. 387/ 12-13 0.356 0.417 0.773
144 2113/ 20.06.13 Replacement of damage 11 KV ACSR weasel conductor form 11 KV XLPE cable to avoid fatal accident at 400 KVA T/F at Tulsi Nagar, Dankaur. 99/ 13-14 1.881 0.320 2.201
145 5900/ 27.12.13 Construction of 11 KV D/Ckt line from 33 KV S/S Sec-72 to near CNG Pump Sector-72, Noida. 406/   13-14 17.156 18.159 35.315
146 2113/ 20.06.13 Strengthening of HT line & replacement of ACSR weasel at village Chakjalabad Branch Rabupura.  100/ 13-14 0.673 0.500 1.173
147 1596/ 04.05.13 33@11 dsoh fo|qr miLFkku lSDVj&20 uks,Mk ij {kfrxzLr czsdj cnyukA 471/ 12-13 8.298 1.500 9.798
148 428/ 02.02.13 oSuk jksM+ tsoj esa 100 ls 250 dsoh, dh {kerko`f) djukA 372/ 12-13 1.752 0.420 2.172
149 4313/ 16.09.13 vfrHkkfjrk ds dkj.k xzke toka esa 100 dsoh, ifjorZd yxkuk rFkk LVªsfUFkfuax ,y-Vh- ykbZu dk dk;ZA 257/ 13-14 2.116 1.330 3.446
150 2113/ 20.06.13 Strengthening of HT line & replacement of ACSR weasel at village Ronija Branch Rabupura. 101/ 13-14 0.747 0.500 1.247
151 056/ 04.01.14 For Replacement of Damaged Poles and ACSR Weasel in L.T. Line of Vill-Gulawati Khurd, Dadri. 433/ 13-14 1.880 0.540 2.420
152 1595/ 04.05.13 ekS0 dqEgkjksa okyk tsoj esa 100 ls 250 dsoh, dh {kerko`f) djukA 503/ 11-12 1.657 0.340 1.997
153 5046/ 08.11.13 33@11 dsoh fo|qr miLFkku tsoj ij vfrHkkfjrk ds dkj.k ,d u;k xzkeh.k iks"kd cukus dk dk;ZA la'kksf/kr iSdst la0 ¼vo'ks"k /kujkf'k½ 344@ 13&14 3.572 11.437 15.009
154 329/ 23.01.14 Replacement of Old 11 KV BIECCO Make OCB from 11 KV VCB at 33/11 KV S/S Mandi Shyam Nagar.  (2×5 MVA) 492/ 13-14 17.377 2.869 20.246
155 329/ 23.01.14 Replacement of Old 11 KV BIECCO Make OCB from 11 KV VCB at 33/11 KV S/S Dankaur. (5+10 MVA) 493/ 13-14 17.777 2.929 20.706
156 329/ 23.01.14 Replacement of Old 11 KV BIECCO Make OCB from 11 KV VCB at 33/11 KV S/S Rabupura. (2×5 MVA) 494/ 13-14 20.219 3.333 23.552
157 399/ 25.01.14 xzke ,pohMh,l cuckjhokl esa ttZj ykbZu ,oa xkfMZx rFkk LVªsafFkx dk dk;ZA 504/ 13-14 2.067 1.281 3.348
158 479/ 31.01.14 I/C of T/F from 100 KVA to 250 KVA in village Khatana, Dadri. 526/ 13-14 3.596 0.305 3.901
159 399/ 25.01.14 ,pohMh,l xzke >qIik esa ttZj ykbZu ,oa xkfMZx dk;Z rFkk 10 dsoh, u;s ifjorZd ckWDl ,oa dsfcy dk dk;ZA  502/ 13-14 3.783 1.801 5.584
160 324/ 23.01.14 Bifurcation of load from existing 63 KVA T/F to newly proposed 63 KVA T/F at vill Rajpur Kala Mandi Shyam Nagar. 495/ 13-14 1.890 0.497 2.387
161 324/ 23.01.14 Bifurcation of load from existing 100 KVA T/F to newly proposed 100 KVA T/F at vill Masota Mandi Shyam Nagar. 496/ 13-14 1.994 0.609 2.603
162 399/ 25.01.14 vfrHkkfjrk ds dkj.k xzke jk;iqj ihiyh eMS¸;k esa 100 dsoh, dk u;k ifjorZd yxkuk ,oa 11 dsoh ykbZu dk fuekZ.kA 499/ 13-14 3.297 0.824 4.121
163 399/ 25.01.14 vfrHkkfjrk ds dkj.k ,pohMh,l xzke cuckjhokl esa 10 dsoh, ifjorZd dh LFkkiukA  503/ 13-14 2.188 0.667 2.855
164 399/ 25.01.14 xzke nLreiqj esa vfrHkkfjrk ,oa oksYVst leL;k ds dkj.k 100 dsoh, ifjorZd dh LFkkiuk djukA 500/ 13-14 2.237 0.478 2.715
165 399/ 25.01.14 xzke ,pohMh,l xksiky x<+ esa 10 dsoh, ,l@ih flaxy Qst ifjorZd LFkkfir djukA 501/ 13-14 3.027 0.339 3.366
166 2981/ 19.08.13 xzke Niuk ,pohMh,l dk l`n`<hdj.k ,oa 10 dsoh, ifjorZd yxkukA 174/ 13-14 5.379 1.807 7.186
167 284/ 22.01.14 ,pohMh,l xzke flokjk esa ttZj xkfMZx ,oa LVªsUFkfux rFkk ,l@ih ifj0 yxkukA 474/ 13-14 0.894 0.362 1.256
168 284/ 22.01.14 ,pohMh,l xzke tkijkckn esa vfrHkkfjrk ds dkj.k 10 dsoh, ifjorZdksa dh LFkkiuk djukA  475/ 13-14 1.138 0.124 1.262
169 284/ 22.01.14 ,pohMh,l xzke Nkrsxk esa vfrHkkfjrk ds dkj.k 10 dsoh, ifjorZdksa dh LFkkiuk djukA  476/ 13-14 1.138 0.124 1.262
170 284/ 22.01.14 ,pohMh,l xzke jksgh esa vfrHkkfjrk ds dkj.k 10 dsoh, ifjorZdksa dh LFkkiuk djukA  477/ 13-14 1.138 0.130 1.268
171 011/ 01.01.13 Const. of 11 KV link line 25 KV D/P S/S village Nagla Kanjar S/S Jhangirpur. 244/ 12-13 1.045 0.300 1.345
172 4131/ 04.09.13 dLck tsoj ls futh uydwiksa dks gVkdj 25 dsoh, ifjorZd dh LFkkiuk djukA 244/ 13-14 1.627 0.650 2.277
173 5580/ 07.12.13 xzke fd'kksjiqj dh ttZj ykbZu ,oa ttZj xkfMZx rFkk jksM+ Økflax mi[k.M&tsoj 393/ 13-14 1.658 1.660 3.318
174 5580/ 07.12.13 11 KV and LT line road crossing in 11 KV Village Prori Feeder S/S Jewar. 395/ 13-14 4.713 1.197 5.910
175 5580/ 07.12.13 xzke uhedk esa ttZj ykbZu dk dk;Z] mi[k.M&tsoj 394/ 13-14 1.138 1.020 2.158
176 284/ 22.01.14 LVªsUFkfux 11 dsoh ykbZu] pkSjksyh Hkoksdjk ekuiqj czkap 473/ 13-14 4.868 2.600 7.468
177 5579/ 07.02.13 11 dsoh ykbZu dh xkfMZx djkuk] dLck tgkWxhj VkmuA 385/ 13-14 2.215 1.088 3.303
178 5579/ 07.02.13 Økflax 132] 220] 400 dsoh ykbZuksa ls 11 dsoh ykbZu 'kkgiqj ,oa xksBuh QhMjA 384/ 13-14 8.996 7.746 16.742
179 5580/ 07.12.13 11 dsoh ykbZu ,oa ,y0Vh0 ykbZu jksM+ Økflax rFkk LVªsfUFkax 11 dsoh QhMj n;kSjkj] mi[k.M&tsoj 396/ 13-14 13.600 7.402 21.002
180 5579/ 07.02.13 vfrHkkfjrk ds dkj.k u;k QhMj cukuk] 33@11 dsoh midsUnz tgkWxhjiqjA 383/ 13-14 4.649 4.089 8.738
181 2975/ 19.08.13 xzke csxekckn esa ttZj ykbZu dk lqn`<hdj.k djukA 189/ 13-14 2.452 1.360 3.812
182 2981/ 19.08.13 tgkWxhjiqj miLFkku vfrHkkfjr gksus ds dkj.k 33 dsoh miLFkku cadkiqj ij vkaf'kd yksM cnyus gsrqA 179/ 13-14 0.653 0.417 1.070
183 4313/ 16.09.13 xzke diuk esa 100 dsoh, ifjorZd yxkukA 258/ 13-14 4.056 1.970 6.026
184 428/ 02.02.13 LVªsfUFkax ,y0Vh0 ykbZu nfyr cLrh jkeiqj ckaxj 366/ 12-13 1.773 0.122 1.895
185 326/ 23.01.14 Strengthening of Existing 33 KV line from Vill Nidam Pur to 33/11 KV S/S Mandi Shyam Nagar. 490/ 13-14 4.889 1.867 6.756
186 399/ 25.01.14 vfrHkkfjrk ds dkj.k u;s 11 dsoh ekpM+ QhMj dk fuekZ.kA 507/ 13-14 13.550 7.117 20.667
187 5880/ 26.12.13 LVªsafFkx dLck tsoj dh ykbZuksa esa vf/kd nwfj;ksa ds chp&chp esa u;s iksy yxkuk ,oa ,0ch0lh0 yxkukA 426/   13-14 10.875 3.122 13.997
188 672/ 12.02.14 Strengthening of 11 KV Industrial feeder of 33/11 KV S/S Chitahara Dadri 554/ 13-14 7.564 2.431 9.995
189 399/ 25.01.14 xzke&uhedk Vkmu esa 160 ,oa 100 dsoh, ifjorZd {ks= esa ttZj ykbZu ,oa LVªsafFkax dk dk;ZA 505/ 13-14 2.938 2.850 5.788
190 399/ 25.01.14 ,pohMh,l xzke Nraxk dh ttZj xkfMZx ,oa LVªsafFkax dk dk;ZA 508/ 13-14 2.300 1.574 3.874
191 399/ 25.01.14 xzke dkuiqj dh ttZj ykbZu dk lqn`<+hdj.k ,oa 10 dsoh ifjorZd LFkkiukA 506/ 13-14 4.952 2.228 7.180
192 672/ 12.02.14 33@11 dsoh midsUnz nknjh gsrq Vªkyh VkbZi 400 dsoh, ifjorZd e; Vªkyh rS;kj djukA 555/ 13-14 7.331 2.110 9.441
193 672/ 12.02.14 I/C of T/F from 160 KVA to 250 KVA in Barhpura, Dadri Town 549/ 13-14 3.339 0.160 3.499
194 672/ 12.02.14 I/C of T/F from 250 KVA to 400 KVA in Rana Colony, Dadri Town 550/ 13-14 2.472 0.214 2.686
195 672/ 12.02.14 I/C of T/F from 250 KVA to 400 KVA in Kathera Road No. 5, Dadri Town 551/ 13-14 2.281 0.182 2.463
196 672/ 12.02.14 I/C of T/F from 250 KVA to 400 KVA in Pratap Vihar, Dadri Town 552/ 13-14 2.686 0.250 2.936
197 672/ 12.02.14 I/C of T/F from 250 KVA to 400 KVA in Bisara Road, Dadri Town 553/ 13-14 2.378 0.202 2.580
198 1595/ 04.05.13 xkWo xWxjkSyh esa 100 ls 250 dsoh, dh {kerko`f) djukA 556/ 11-12 2.282 0.340 2.622
199 2981/ 19.08.13 vfrHkkfjrk ds dkj.k {kerko`f) 63 dsoh, ls 250 dsoh, ifjorZd LFkkiuk] cSuk jksM+] tsojA 172/ 13-14 3.711 0.520 4.231
200 1597/ 04.05.13 Providing 3 Nos. 10 KVA S/P along with Electrification of Hamld Jhangira Ki Jhopri, 33/11 KV S/S Bhankapur. 409/ 12-13 2.195 0.872 3.067
201 954/ 12.03.13 Construction of 100 KVA LT S/S at village Mohbalipur, Bankapur. 468/ 11-12 1.353 0.127 1.480
202 4571/ 30.09.13 Construction of 63 KVA S/S DP along with HT and LT link line in village Dadupur for Bifercation of load of 5 No. PTW connection load of L&F Connection. 287/ 13-14 2.005 0.610 2.615
203 325/ 23.01.14 Transfering of load of 11 KV Bhaipur feeder of 33/11 KV S/S Rabupura to Newly proposed faleda feeder.  497/ 13-14 25.448 16.246 41.694
204 325/ 23.01.14 Transfering of load of 11 KV Kherli Bhav feeder of 11KV Mirjapur feeder Emanating from 33/11 KV S/S Dankaur. 498/ 13-14 11.430 19.662 31.092
205 5273/ 23.11.13 Providing overhead LT circuit in place of damage under ground cable at Sector-70, Noida 305/ 13-14 3.757 1.978 5.735
206 5273/ 23.11.13 Providing overhead LT circuit in place of damage under ground cable at B,M & G Block Sector-70 306/ 13-14 4.802 1.759 6.561
207 819/ 20.02.14 eksgYyk pkeM okyk tsoj esa Lohd`r 250 dsoh, ifjorZd ij yksM forj.k dj O;ofLFkr djukA 567/ 13-14 1.875 0.635 2.510
208 817/ 20.02.14 xzke nLreiqj esa vfrHkkfjrk ds dkj.k 25 dsoh, ifjorZd dh LFkkiuk djukA 566/ 13-14 0.781 0.160 0.941
209 825/ 20.02.14 xzke djkSy esa vfrHkkfjrk ds dkj.k 10 dsoh, flaxy Qst ifjorZd LFkkiukA 572/ 13-14 1.106 0.122 1.228
210 825/ 20.02.14 xzke fljlk [kknj esa 10 dsoh, ifjorZd LFkkiukA 573/ 13-14 1.106 0.122 1.228
211 825/ 20.02.14 xzke ektjk ekpM+ esa 10 dsoh, ifjorZd LFkkiukA 574/ 13-14 1.182 0.161 1.343
212 825/ 20.02.14 xzke ekpM esa vfrHkkfjrk ds dkj.k 10 dsoh, flaxy Qst ifjorZd LFkkiukA 575/ 13-14 1.222 0.186 1.408
213 428/ 02.02.13 xzke uxyk Qwy [kkW esa u;s ifjorZd yxkukA 365/ 12-13 1.067 0.386 1.453
214 4955/ 01.11.13 Strengthening of LT Mains of 250 KVA S/S No. 2 Situated at main road, Bishnoli by replacement of old & badly damaged conductor and providing mid span pools in ungthy spans and replacement of damaged poles. 325/ 13-14 4.124 1.138 5.262
215 775/ 18.02.14 xkWo nqj;kbZ esa ?kkrd nq?kZVuk fuokj.k gsrq ehfMy LikWu ,oa {kfrxzLr [kEcs yxokuk] ttZj rkj cnyokus dk lqn`<hdj.k dk;ZA 560/ 13-14 2.112 1.119 3.231
216 776/ 18.02.14 xkWo nqj;kbZ esa ?kkrd nq?kZVuk fuokj.k gsrq ehfMy LikWu [kEcs yxokuk] ttZj [kEcs cnyuk ,oa ,chlh dsfcy yxokus dk lqn`<hdj.k dk;ZA 561/   13-14 5.073 1.605 6.678
217 859/ 24.02.14 xkWo HkkbZiqj esa ?kkrd nq?kZVuk fuokj.k gsrq ehfMy LikWu ,oa {kfrxzLr [kEcs yxokuk] ttZj rkj cnyokus dk lqn`<hdj.k dk;ZA 576/ 13-14 3.951 2.049 6.000
218 858/ 24.02.14 I/C of existing over loading 25 KVA T/F to newly proposed 63 KVA T/F at village Zuneedpur ki Mandiya, Mandi Shyamnagar. 577/ 13-14 1.060 0.065 1.125
219 264/ 21.01.14 Providing 11 KV 3×185 Sq. mm. cable at Vill-Gulawali feeder no. 02 of 33 KV S/S Sector-142. 442/ 13-14 1.755 1.115 2.870
220 264/ 21.01.14 Providing 11 KV 3×185 Sq. mm. cable at Express Highway Crossing near 33 KV S/S Sector-142.  443/ 13-14 2.106 1.385 3.491
221 264/ 21.01.14 Providing 11 KV 3×185 Sq. mm. cable at Vill-Jhatta feeder no. 05 of 33 KV S/S Sector-142 444/ 13-14 2.106 1.335 3.441
222 171/ 14.01.13 xzke usQiqj esa ,y0Vh0 ykbZu f'k¶V djukA 341/ 12-13 0.287 0.300 0.587
223 954/ 12.03.13 Strengthening of line of village Himayupur, Bankapur 461/ 11-12 0.831 0.553 1.384
224 5369/ 28.11.13 Replacement of old & loadly damaged ABC with ACSR Dog of main circuit of Moh Tulsi Vihar of 630 KVA Transformer. 307/ 13-14 1.344 0.470 1.814
225 4120/ 04.09.13 Construction of 100 KVA S/S DP and replacement of damaged conductor in village Chitahara  237/ 13-14 2.746 0.760 3.506
226 011/ 01.01.13 xkWo n;kuriqj esa ,d ,y0Vh0 fo|qr miLFkku 100 dsoh, dh ,oa ykbZu dh LFkkiuk djukA 279/ 12-13 2.740 0.604 3.344
227 954/ 12.03.13 Construction of 100 KVA LT S/S in village Hasanpur, Bankapur 471/ 11-12 1.313 0.129 1.442
228 1596/ 04.05.13 fudV CykWd&bZ] lSDVj&20 uks,Mk esa ,d 250 dsoh, dk u;k fo|qr miLFkku cukukA 446/ 12-13 5.583 0.560 6.143
229 1596/ 04.05.13 th&CykWd ekdsZV lSDVj&20 uks,Mk esa ,d 250 dsoh, dk u;k fo|qr miLFkku cukukA 448/ 12-13 5.554 0.650 6.204
230 1596/ 04.05.13 fudV lh&270@10 uks,Mk ij ,d 400 dsoh, dk fo|qr miLFkku cukukA 451/ 12-13 6.620 1.400 8.020
231 1596/ 04.05.13 fudV ch&93@10 uks,Mk ij ,d 400 dsoh, dk fo|qr miLFkku cukukA 450/ 12-13 7.353 1.340 8.693
232 5058/ 23.11.12 I/C capacity of 250 KVA T/F to 400 KVA of Salekchand Chakki site, Village Behlolpur Noida 188/ 12-13 1.543 0.050 1.593
233 5058/ 23.11.12 I/C capacity of 250 KVA T/F to 400 KVA of Gari site, Village Behlolpur Noida 189/ 12-13 1.543 0.050 1.593
234 1618/ 07.05.13 vfrHkkfjrk ds dkj.k xkWo bVSgjk esa 63 ls 250 dsoh, dh {kerko`f)A  37/ 12-13 2.589 0.350 2.939
235 1596/ 04.05.13 vfrHkkfjrk ds dkj.k fudV Mh&198@10 uks,Mk ij 160 dsoh, ls 250 dsoh, dh {kerko`f) djukA 444/ 12-13 4.759 0.500 5.259
236 1596/ 04.05.13 fudV lh&58 lSDVj&10 uks,Mk ij 250 ls 400 dsoh, dh {kerko`f) djukA 447/ 12-13 4.214 0.420 4.634
237 1596/ 04.05.13 vfrHkkfjrk ds dkj.k fudV lh&324@10 uks,Mk ij 200 dsoh, ls 400 dsoh, dh {kerko`f) djukA 449/ 12-13 4.210 0.400 4.610
238 816/ 20.02.14 HkV~Vk 'kh'kjke ls midsUnz tsoj rd 33 dsoh ykbZu dk lqn`<hdj.k dk;ZA 564/ 13-14 9.908 8.111 18.019
239 818/ 20.02.14 dLck tsoj esa ttZj ,chlh cnyus dk dk;ZA 565/   13-14 3.765 2.039 5.804
240 4120/ 04.09.13 I/C of T/F from 100 KVA to 250 KVA of village Chitahara. 238/ 13-14 4.586 0.619 5.205
241 823/ 20.02.14 xzke >axhjk dh >ksiM+h esa 10 dsoh, ifjorZd LFkkiuk ,oa lqn`<hdj.k dk dk;ZA 571/ 13-14 2.659 1.031 3.690
242 942/ 01.03.14 xkWo HkkbZiqj esa 100 dsoh, ifjorZd LFkkfir djukA 580/ 13-14 2.147 0.600 2.747
243 706/ 14.02.14 Installation of 250 KVA T/F at Bhumiya Wali Gali, Village Barola, Noida 544/ 13-14 12.539 2.910 15.449
244 706/ 14.02.14 Installation of 400 KVA T/F at Chauhan Colony, Village Barola, Noida 543/ 13-14 13.668 2.756 16.424
245 706/ 14.02.14 Installation of 400 KVA T/F at Shatabdi Enclave Village Barola, Noida 542/ 13-14 8.735 1.735 10.470
246 706/ 14.02.14 Installation of 400 KVA T/F at Rai Singh Chauraha, Village Barola, Noida  540/ 13-14 9.879 2.731 12.610
247 706/ 14.02.14 Installation of 400 KVA T/F at Hindon Vihar, Village Barola, Noida 541/ 13-14 11.239 2.252 13.491
248 706/ 14.02.14 Installation of 250 and 100 KVA T/F at NALA near SK Timber, Village Barola, Noida 545/ 13-14 10.112 3.545 13.657
249 706/ 14.02.14 Installation of 100 KVA T/F at Chauhan Chopal, Village Barola, Noida 546/ 13-14 4.669 1.644 6.313
250 909/ 28.02.14 Construction of 400 KVA LT S/S in G-Block, Sector-63, Noida to avoid low voltage & overloading problem of existing 400 KVA T/F. 578/ 13-14 7.677 2.500 10.177
251 011/ 01.01.13 Strengthening of LT line in village Nagla Kanjar,Jahangirpur. 014/ 12-13 0.406 0.333 0.739
252 011/ 01.01.13 Strengthening of LT line in village Udaypur Jahangirpur. 013/ 12-13 0.899 0.512 1.411
253 799/ 19.02.14 33 dsoh ykbZu dks 132 dsoh fo|qr midsUnz tgkWxhjiqj ls 33@11 dsoh fo|qr midsUnz tgkWxhjiqj dh LVªsfUFkx o chp&chp esa u;s iksy yxkuk ,oa rkj cnyukA 563/ 13-14 38.533 14.400 52.933
254 821/ 20.02.14 Fkksjk Vkmu esa ,chlh Mkyus dk dk;ZA 569/ 13-14 6.895 2.235 9.130
255 824/ 20.02.14 Fkksjk Vkmu eksgYyk [kVksyk iV~Vh ,oa pkSd Fkksjk esa ,chlh Mkyus dk dk;ZA 570/   13-14 8.566 3.084 11.650
256 1597/ 04.05.13 Resagging of guarding of 11 KV phase wise of spur line of village Dudhera, Jewar. 519/ 12-13 0.630 0.697 1.327
257 860/ 24.02.14 Construction of HT Line for 10 KVA T/F of Madiya of vill-Sirsha Khadar, Jewar. 502/ 11-12 0.959 0.448 1.407
258 860/ 24.02.14 Strengthening of HT Line of 100 KVA T/F at Khurja Road in village Neemka Jewar. 607/ 11-12 0.748 0.330 1.078
259 860/ 24.02.14 Strengthening of HT Line in village Hasanpur, Bankapur. 469/ 11-12 0.524 0.252 0.776
260 011/ 01.01.13 Strengthening of LT line of 100 KVA T/F of Dalit Basti Village Neemka, Jewar. 004/ 12-13 0.582 0.333 0.915
261 820/ 20.02.14 xzke Hkwrx<+h esa 11 dsoh ykbZu cukus ,oa 10 dsoh, ifjorZd yxkus dk dk;ZA 568/ 13-14 11.836 3.520 15.356
262 1000/ 03.03.14 vfrHkkfjrk ds dkj.k 160 dsoh, ls 250 dsoh, ifjorZd LFkkiuk uhedk VkÅu ds lEcU/k esaA 664/ 13-14 2.886 1.060 3.946
263 933/ 01.03.14 xzke 'ke'ke uxj esa ttZj ykbZu dk lqn`<hdj.k rFkk vfrHkkfjrk ds dkj.k 63 dsoh, ls 100 dsoh, ifjorZd yxkuk ,oa ykbZu esa dqN rkj c<kdj Mkyus dk dk;ZA 686/ 13-14 1.045 0.893 1.938
;ksx 976.67 484.26 1460.93